BLD-Final | 9/19/2018 | 9/20/2018 | 9/20/2018 | A | PASS |
Jim Sly
|
|
|
Please call // Micheal Phone #: ###-####
|
DOC - Permit Finaled | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
BLD-Framing/Rough-in | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | NH |
Brandon Shaw
|
|
|
No access to garage Need Engineering for hold downs as previously stated
|
BLD-Wall Bracing | 1/31/2018 | 1/31/2018 | 2/1/2018 | P | PART |
Dave Hannah
|
|
|
Michael Phone #: ###-#### needs engineering on front and back holddowns in wrong spots ok to rap sides
|
Routing Walk-In (Zoning) | 12/29/2017 | 12/29/2017 | 12/29/2017 | A | PASS |
Sue Cummings
|
|
|
change...converting attick space to office with bathroom. No shower untill ADU approval.
|
Routing - MECHANICAL | 12/15/2017 | | 12/15/2017 | | PASS |
Troy James
|
|
|
Manual J report was submitted.
|
BLD-Framing/Rough-in | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | NR |
Dave Hannah
|
|
|
micheal Phone #: ###-#### needs plans on site and resubmit plan to show finishing up stairs
|
OVERRIDE | | | 6/2/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/2/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - FRONT DESK | 6/2/2017 | | 6/2/2017 | | PASS |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/2/2017 | | DONE |
|
|
|
DO NOT RE ISSUE PLAN MOD. No fees due per Josh
|
Telephone call | | | 6/2/2017 | | DONE |
|
|
|
Left a message for Micheal that this plan mod is ready to be picked up
|
(F) Reprint permit | | | 6/2/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/2/2017 | | DONE |
|
|
|
|
BLD-Wall Bracing | 4/28/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Wall Bracing | 4/27/2017 | 4/27/2017 | 4/28/2017 | P | NR |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/17/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/14/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/14/2017 | 4/14/2017 | 4/14/2017 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 4/14/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/14/2017 | | 4/14/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/14/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/14/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/14/2017 | | DONE |
|
|
|
need RP
|
Telephone call | | | 4/14/2017 | | DONE |
|
|
|
called Mike to let know permit is ready and how much is owed-left message on his cell
|
Routing Walk-In (Zoning) | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | FAIL |
Brian McGowan
|
|
|
Foundation had been poured without permit several years ago. Need to verify depth, size and width of existing and if there are piers poured for the proposed posts at the covered patio.
|
Application received | | 4/4/2017 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/19/2018 | | | | |
|
|
|
|
Routing - Addressing | 3/19/2018 | | | | |
|
|
|
|