Permit Information
Permit NumberBLD17-00918
StatusFinaled
Name HEATHER WELTON
Site Address 2109 S VISTA AVE
Project NameTony's Place
Customer Number 
ePlanReviewYes
Description
(TONY'S PLACE) An existing single family dwelling will have two (2) W.C.s added, a toilet removed and replaced with a lay-in shower. All of the work to be done is interior and no sq.ft. will be added or subtracted from the structure. The basement area is to be left unmodified and is not allowed to be used as habitable space. This structure falls under the boarding house requiements of the IRC with 4 sleeping rooms and one owner occupied room and the total occupant load for guests of 10 or less. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/22/20178/23/20178/23/2017PPASS
DetailsJim Storey
Heather Phone #: ###-####
DOC - Permit Finaled8/23/20178/23/20178/23/2017PPASS
DetailsJim Storey
BLD-Framing/Rough-in7/21/20177/25/20177/25/2017APASS
DetailsJim Storey
Heather Phone #: ###-####
BLD-Framing/Rough-in7/12/20177/13/20177/13/2017ACANC
DetailsJim Storey
Heather Phone #: ###-####
BLD-Framing/Rough-in6/19/20176/19/20176/19/2017PNR
DetailsJim Storey
Heather Phone #: ###-####
Permit Ready to Issue  6/1/2017 DONE
DetailsChristina Prado
Need GC form for issuance
Permit Ready to Issue  6/1/2017 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  6/1/2017 DONE
DetailsChristina Prado
Inspection Record Card- Bld  6/1/2017 DONE
DetailsChristina Prado
Routing - PLAN CHECK5/31/2017 5/31/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  5/31/2017 DONE
Plan assigned to (BJM)4/10/20174/10/20174/14/2017 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK4/10/2017 4/14/2017 FAIL
DetailsBrian McGowan
Brian McGowen has determined that this project is commercial - applicant will have to re-apply for the correct application
1st review completed  4/14/2017 DONE
Plans ACCEPTED BY PLAN TECH  4/10/2017 DONE
Intake Approval  4/10/2017 PASS
Recd Pcfee & Taken To Pln CK  4/10/2017 DONE
Application received  4/4/2017 DONE
Application submitted via PDS Online on Apr 4 2017 8:36PM