Second Notice | | 8/20/2017 | 9/8/2017 | | DONE |
|
|
|
This permit finaled on the web by Jeremy Amar
|
First Notice | 7/26/2017 | 7/26/2017 | 8/10/2017 | | DONE |
Mike Jordan
|
|
|
Mailed 8-11-17
|
BLD-Final | 7/25/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Mike Jordan
|
|
|
Pat Palmer Phone #: ###-#### Inspection requested via web by Jeremy Amar
|
DOC - Permit Finaled | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 7/25/2017 | 7/26/2017 | 7/25/2017 | A | CANC |
Mike Jordan
|
|
|
pat Phone #: ###-#### Inspection cancelled from web by: Jeremy Amar
|
FIRE-Final Inspection | 7/25/2017 | 7/25/2017 | 7/25/2017 | P | CANC |
Troy Cobbley
|
|
|
Drawings not available.
pat Phone #: ###-####
|
BLD-Footing | 4/24/2017 | 4/24/2017 | 4/24/2017 | P | PASS |
Brandon Shaw
|
|
|
Butch Phone #: ###-####
|
OVERRIDE | | | 4/24/2017 | | |
|
|
|
|
Route to Impact Fee Review | 4/23/2017 | 4/26/2017 | 4/24/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Issue PAID IN FULL permit | | | 4/24/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/24/2017 | | DONE |
Christina Prado
|
|
|
All met 4/24/17 C_P /// Need ACHD **MET*** RP for issuance
|
Plan assigned to (JAR) | 4/7/2017 | 4/7/2017 | 4/23/2017 | | DONE |
Julie Romig
|
|
|
1st review complete. Applicant requested permit by 04/21.
|
Routing - PLAN CHECK | 4/23/2017 | | 4/23/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/23/2017 | | 4/23/2017 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/23/2017 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/7/2017 | | 4/21/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 4/20/2017 | | 4/21/2017 | | FAIL |
Julie Romig
|
|
|
Failed 2nd review - did not provide enough information
|
Routing Off Site - STRUCTURAL | 4/7/2017 | | 4/20/2017 | | FAIL |
Julie Romig
|
|
|
Failed 1st review.
|
Routing - PLANNING | 4/7/2017 | | 4/18/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing - Design Review | 4/7/2017 | | 4/12/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PUBLIC WORKS | 4/7/2017 | | 4/10/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/7/2017 | | 4/10/2017 | | PASS |
Andy J. Long
|
|
|
Already developed lot. BMPs: protected Dis, protect stormwater infrastructure, concrete washout, SCE on Allumbaugh, fiber wattle perimeter control around site.
|
Routing PW Drainage | 4/10/2017 | | 4/10/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 4/10/2017 | | 4/10/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - FIRE | 4/7/2017 | 4/7/2017 | 4/7/2017 | | PASS |
Katie Marron
|
|
|
Reviewed for FD Access. No comments required.
|
Routing - Addressing | 4/7/2017 | | 4/7/2017 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 4/7/2017 | | FAIL |
Julie Romig
|
|
|
Need Verification of Legal Lot form
|
Plan Reviewer's activity | | | 4/7/2017 | | |
|
|
|
Route to Design Review and Planning
|
Intake Approval | | | 4/7/2017 | | FAIL |
Julie Romig
|
|
|
Verification of Legal Lot and Parcel needs planning sign off.
|
Intake Approval | | | 4/7/2017 | | PASS |
|
|
|
|
Application received | | | 4/5/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 5 2017 4:32PM
|