Permit Information
Permit NumberBLD17-00944
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 7607 W GRATZ DR
Project NameLyle Pearson Mercedes Remodel
Customer Number 
ePlanReviewYes
Description
(LYLE PEARSON MERCEDES) 07/17/18 PLAN MODIFICATION TO RETAIN EXTERIOR STAIRS, ADD BREAK ROOM SINK, RELOCATE/ADD INTERIOR WINDOWS. REVISED HVAC, ELECTRICAL, PLUMBING. JAR. **This building is not Fire Sprinklered. Permit to build exterior walls to enclose 494 sq. ft. of covered building area and remodel the existing space. Work to include: demo of existing interior non-bearing wall; new exterior walls, glazing, and doors; new mechanical; new interior stair and ADA lift, non-bearing interior walls, doors, cabinetry; new lights; and new interior finishes in compliance with Ch. 8 of the 2012 IBC. All work to be done per the approved plans and applicable codes and ordinances. Proposed canopy shown in drawings is under separate permit BLD17-01452. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/7/20196/10/20196/10/2019APASS
DetailsMike Jordan
Call when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton. All issues resolved. OK for perm occ.
DOC - Permit Finaled  6/10/2019 DONE
final passed 6-10-19
Letter of compliance/Occupancy  6/10/2019 DONE
BLD-Final5/9/20195/10/20195/10/2019APART
DetailsMike Jordan
Call when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton. Ok for temp occ. Needs tempered glazing on side light and provide toilet flusher on turning side.
FIRE-Final Inspection5/9/20195/9/20195/9/2019PPASS
DetailsTroy Cobbley
Life safety passed.. Exit signs have been replaced. Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection5/1/20195/2/20195/2/2019AFAIL
DetailsTroy Cobbley
Repair the exit signs and provide the exit discharge light as per plans. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in2/5/20192/6/20192/6/2019APASS
DetailsMike Jordan
Bob Phone #: ###-####-please call when on way. LVL header or new opening.
BLD-Framing/Rough-in1/10/20191/10/20191/10/2019PPASS
DetailsMike Jordan
Bob Phone #: ###-####. Interior steel stud and wood framed walls, lintels and headers mercedes recieing area.
CHANGE STATUS TO (ISS)  11/2/2018 DONE
plan mod
Inspection Record Card- Bld  11/2/2018 DONE
BLD-Framing/Rough-in7/19/20187/20/20187/20/2018APASS
DetailsMike Jordan
Bob Phone #: ###-####. Interior steel stud framed walls and hardlids ok at service lounge/service writers area.
OVERRIDE  7/20/2018  
Permit Ready to Issue  7/20/2018 DONE
PLAN MOD
Routing - FIRE7/13/20187/13/20187/19/2018 PASS
DetailsErika Akin
Attached revised plan mod comments
Plan assigned to (JAR)6/14/20186/14/20187/19/2018 DONE
DetailsJulie Romig
07/19 - 2nd Rev - 1st Rev Comp - Plan mod - Lyle Pearson
Routing - PLAN CHECK7/13/2018 7/17/2018 PASS
DetailsJulie Romig
Routing - Design Review7/13/2018 7/16/2018 PASS
DetailsKatelyn Menuge
DRH18-00298
Routing - FIRE6/22/20186/22/20186/28/2018 FAIL
DetailsErika Akin
Attached review to case and emailed architect
Routing - PLAN CHECK6/22/2018 6/28/2018 FAIL
DetailsJulie Romig
Routing - MECHANICAL6/22/2018 6/25/2018 PASS
DetailsTroy James
Routing - PLUMBING6/22/2018 6/25/2018 PASS
DetailsBill VanDegrift
no review required
Routing - Design Review6/22/2018 6/22/2018 FAIL
DetailsKatelyn Menuge
Changes to what was approved through Design Review require a modification of DRH16-00388. Please submit a new Design Review application to process the modifications.
Routing - PUBLIC WORKS6/22/2018 6/22/2018 PASS
DetailsMorgan Webb
Plan Modification Accepted  6/14/2018 DONE
plan mod accepted in e plan-changes to new wiring#104, retain existing strips by office #103, relocated windows in #4, new door #115, new HM window #119 & nbew doors #109/108-new sheets submitted A1.10, A1.1, A1.2, A1.3, A3.0, A4.0, A5.0, A5.1, A7.0, P8.0 (?), E1.0, E1.2, E1.3, M2.1 & M(?)2.2-assigned to JAR
BLD-Footing4/27/20184/30/20184/30/2018PPASS
DetailsMike Jordan
Late afternoon please. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Footing4/26/20184/27/20184/27/2018ACANC
DetailsMike Jordan
MTI epoxy bolt at 8:00 am. Concrete is scheduled for noon. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Foundation4/24/20184/25/20184/25/2018APASS
DetailsMike Jordan
Pour foundation wall at 10:00 am Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Footing4/24/20184/24/20184/24/2018PPASS
DetailsMike Jordan
Plans indicate no inspection required. Is that correct? Phone #: ###-#### Inspection requested via web by Bob Thornton
Issue PAID IN FULL permit  4/12/2018 DONE
Inspection Record Card- Bld  4/12/2018 DONE
Extend Review Timeline  4/4/2018 DONE
Final Approved 180 day extension per Adele. See documents
Expiration Notice3/26/20184/16/20183/26/2018 DONE
DetailsBrittany Hill
OVERRIDE  3/20/2018  
Routing - FIRE3/15/20183/15/20183/20/2018 PASS
DetailsScott Arellano
90 Min Fire Door added to plan sheet A1.1
Plan assigned to (JAR)4/14/20174/14/20173/20/2018 DONE
DetailsJulie Romig
**1st Rev Comp - 4th Rev Rec'd 03/15 - L3 Lyle Pearson Mercedes Remodel
PLANS/APPL TAKEN TO FRONT DESK  3/20/2018 DONE
Telephone call  3/20/2018 DONE
NEED
RP
GC FORM
REVISED VALUE
Permit Ready to Issue  3/20/2018 DONE
DetailsChristina Prado
all have been met-NEED
RP - met
GC FORM - met
REVISED VALUE - met
Routing - PLAN CHECK3/15/2018 3/20/2018 PASS
DetailsJulie Romig
Routing - PLAN CHECK2/16/2018 2/28/2018 FAIL
DetailsJulie Romig
3rd Review
Routing - FIRE2/16/20182/16/20182/26/2018 PASS
DetailsScott Arellano
Attached revised comments to case
Extend Review Timeline  11/17/2017 DONE
1st Approved 180 day extension per Adele. See documents
Routing - PLAN CHECK8/15/2017 8/15/2017 FAIL
DetailsJulie Romig
See ePlanReview for Corrections. Changemark report sent to Damon Beard.
Routing - FIRE8/11/20178/11/20178/11/2017 FAIL
DetailsScott Arellano
Emailed architect updated Fire Plan Review report comments. Outstanding issue of Fire Flow deficiency has not been remedied.
Route to Impact Fee Review5/20/20175/23/20175/22/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
1st review completed  5/20/2017 FAIL
Routing - PLAN CHECK4/14/2017 5/20/2017 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL4/14/2017 5/12/2017 PASS
DetailsJulie Romig
Approved per ePlanReview
Routing - FIRE4/14/20174/14/20174/20/2017 FAIL
DetailsScott Arellano
Emailed architect plan review report. Attached report to case.
Routing PW Drainage4/17/2017 4/20/2017 PASS
DetailsBrian Murphy
Routing - Design Review4/14/2017 4/20/2017 PASS
DetailsSarah Schafer
Approver per DRH16-00388
Routing - Erosion and Sediment4/14/2017 4/18/2017 PASS
DetailsMelissa Jannusch
Waiver approved
Routing - MECHANICAL4/14/2017 4/17/2017 PASS
DetailsTroy James
Routing - Addressing4/14/2017 4/17/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/14/2017 4/17/2017 PASS
DetailsRachael Beierle
Intake Approval  4/14/2017 PASS
DetailsAdele J Schaffeld-Griffin
Pre screen passed Carl M, fees verified
Application received  4/7/2017 DONE
Application submitted via PDS Online on Apr 7 2017 8:25AM
Intake Approval  4/7/2017 FAIL
4/7/17 Carl Madsen
Please provide the following items.
1. A minimum of a ESC waiver letter or an ESC plan is required to be submitted.
2. There are exterior modifications being made to the building please provide a site plan and plan clearly designating Fire department access roadways, hydrants etc.
3. the code sheet indicates fire wall but the floor plan indicated a fire barrier. Please show consistency between the sheets.
4. It appears that the are of work is taking a previously unenclosed area and enclosing it with new walls and glazing. Please provide an envelope compliance form or provide a prescriptive list for energy compliance.