BLD-Final | 12/13/2017 | 12/13/2017 | 12/13/2017 | P | PASS |
Brandon Shaw
|
|
|
Garage open for access Inspection requested via web by Erby Gonzales
|
DOC - Permit Finaled | 12/13/2017 | 12/13/2017 | 12/13/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 12/11/2017 | 12/11/2017 | 12/11/2017 | P | NR |
Brandon Shaw
|
|
|
Need Ele final
|
BLD-Energy code compliance | 9/14/2017 | 9/14/2017 | 9/14/2017 | A | PASS |
Jim Storey
|
|
|
Inspection requested via web by Erby Gonzales
|
BLD-Framing/Rough-in | 9/8/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Brandon Shaw
|
|
|
Fire wall and framing rough in, OK to insulate
|
BLD-Wall Bracing | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | PASS |
Brandon Shaw
|
|
|
Shear inspection Inspection requested via web by Erby Gonzales
|
BLD-Foundation | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
Brandon Shaw
|
|
|
Doug Phone #: ###-####
|
BLD-Footing | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | PASS |
Brandon Shaw
|
|
|
Doug Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/9/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/30/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 4/14/2017 | 4/14/2017 | 5/30/2017 | | DONE |
Brian McGowan
|
|
|
Due 5-3 Level 2 - ePlan - Need Floodplain approval
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/30/2017 | | DONE |
|
|
|
Need RP
|
Routing PW Flood Plain | 5/22/2017 | | 5/26/2017 | | PASS |
Jason C. Taylor
|
|
|
Finish Floor heights need to be 2748.00 JCT
|
1st review completed | | | 5/23/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/14/2017 | | 5/23/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 5/22/2017 | | 5/22/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - MECHANICAL | 5/15/2017 | | 5/15/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 4/14/2017 | 4/17/2017 | 4/17/2017 | | PASS |
Tonya Wallace
|
|
|
Can not find the parcel in the GIS system, the building permit may been assigned a temporary parcel number
|
Telephone call | | | 4/17/2017 | | DONE |
|
|
|
Called Applicant to let know DR approval is required. Katelyn
|
Routing - MECHANICAL | 4/14/2017 | | 4/17/2017 | | FAIL |
Troy James
|
|
|
Emailed corrections to legends mechanical. Mechanical contractor requested mechanical to be defferred submittal. The request was denied. Manual j report required to be corrected and resubmitted for review.
|
Routing - PLANNING | 4/14/2017 | | 4/17/2017 | | FAIL |
Katelyn Menuge
|
|
|
Will need to submit for and receive design review approval prior to building permit.
|
Routing - Addressing | 4/14/2017 | | 4/17/2017 | | PASS |
Laura Hunter
|
|
|
|
Plan assigned to (AJS) | 4/14/2017 | 4/14/2017 | 4/14/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/14/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/14/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/14/2017 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/14/2017 | | 4/14/2017 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 4/7/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 7 2017 10:22AM
|