Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-00954
StatusFinaled
Name QUALITY CONSTRUCTION SERVICES
Site Address 2214 E GOODMAN ST
Project NameWarm Springs Apts Bldg A
Customer NumberBLD17-02955 & BLD17-02956
ePlanReviewYes
Description
(3 PERMITS FILED UNDER BLD17-00954 IN EPLANREVIEW) (WARMS SPRINGS APARTMENTS - BUILDING A) (08/07/18 PLAN MOD TO ADD HOSE BIBB AND DRAIN AT BIKE ENCLOSURE. JAR) (6/20/18 PLAN MODIFICATION TO HVAC DESIGN AND REMOVE EXTERIOR LIGHTS AT FALSE BALCONIES. JAR). (3/23/18 PLAN MODIFICATION TO REVISE ROOF INSULATION AND VENTING AT OVER FRAME ROOF; REMOVE WINDOWS IN STAIRWELLS; REVISE EXTERIOR TRIM. JAR) **Permit for the construction of a 9 unit, 3 story wood framed apartment building with work to include general site work and construction of the new building per the approved plans. This building fire sprinklered with a NFPA-13R system. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval2/13/20202/13/20202/13/2020 DONE
DetailsTiffany Lowery
Permanent Occupancy  8/23/2019 DONE
BLD-Final8/22/20198/22/20198/22/2019PPASS
DetailsBrandon Shaw
John Phone #: ###-####
DOC - Permit Finaled8/22/20198/22/20198/22/2019PPASS
DetailsBrandon Shaw
BLD-Final8/16/20198/16/20198/19/2019PPEND
DetailsDave Hannah
John Phone #: ###-#### needs returns on hand rails
PubWorks Temp Occupancy Appr6/4/20196/4/20196/4/2019 DONE
DetailsTiffany Lowery
Zoning Approval5/30/20195/30/20195/30/2019 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection4/25/20194/26/20194/26/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in placed and will be inspected as discussed. Final life fire safety inspection complete.

John Phone #: ###-####
Print Occupancy Form  3/25/2019 DONE
BLD-Energy code compliance8/9/20188/9/20188/9/2018PPASS
DetailsDave Hannah
John-1st and 2nd floor Phone #: ###-####
CHANGE STATUS TO (ISS)  8/8/2018 DONE
Plan Mod
OVERRIDE  8/7/2018  
Plan assigned to (JAR)7/23/20187/23/20188/7/2018 DONE
DetailsJulie Romig
1st Rev Comp - Plan Mod #3 Warm Springs - add hose bibb & drain
Routing - PLAN CHECK8/2/2018 8/7/2018 PASS
DetailsJulie Romig
Permit Ready to Issue  8/7/2018 DONE
Plan Mod approved
DO NOT REISSUE
(Change this permit and BLD17-02955 to issued status once plan mod fee have been paid)
Routing - PLUMBING8/6/2018 8/6/2018 PASS
DetailsBill VanDegrift
Public works has approved the floor drain location.
Routing - PUBLIC WORKS8/2/2018 8/2/2018 PASS
DetailsMorgan Webb
PROVIDED HINGED GRATE AND VANDAL PROOF SCREWS FOR FLOOR DRAIN
Routing - PLAN CHECK7/23/2018 7/31/2018 FAIL
DetailsJulie Romig
Plan Mod #3 pending approval by plumbing and public works.
BLD-Energy code compliance7/30/20187/30/20187/30/2018PPASS
DetailsDave Hannah
3rd Floor // John Phone #: ###-####
Routing - PUBLIC WORKS7/30/2018 7/30/2018 FAIL
DetailsMorgan Webb
FLOOR DRAIN UNCOVERED.
Routing PW Drainage7/30/2018 7/30/2018 PASS
DetailsBrian Murphy
Routing - PLUMBING7/23/2018 7/27/2018 FAIL
DetailsBill VanDegrift
public works requires exterior floor drains to be covered.
BLD-Framing/Rough-in7/24/20187/24/20187/24/2018PPASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Energy code compliance7/24/20187/24/20187/24/2018PPART
DetailsDave Hannah
air seal ok
Plan Modification Accepted  7/23/2018 DONE
Plan Mod #3 - Add hose bibb & drain
CHANGE STATUS TO (ISS)  6/26/2018 DONE
Print Occupancy Form  6/26/2018 DONE
OVERRIDE  6/20/2018  
Plan assigned to (JAR)6/12/20186/12/20186/20/2018 DONE
DetailsJulie Romig
Plan mod
Routing - PLAN CHECK6/18/2018 6/20/2018 PASS
DetailsJulie Romig
Plan Mod 2
Permit Ready to Issue  6/20/2018 DONE
Plan Mod please do not re issue 2 permits also see BLD17-02955
need
rev cert of val
Routing - Design Review6/18/2018 6/18/2018 PASS
DetailsKatelyn Menuge
Light changes okay.
Routing - MECHANICAL6/18/2018 6/18/2018 PASS
DetailsTroy James
New mechanical engineered drawings.
Plan Modification Accepted  6/12/2018 DONE
Plan mod workflow started to revise HVAC, remove exterior lights and switch at bedroom false balconies levels 2 & 3, revise landscape plan to remove lawn, add plants & specify xeroscape drip irrigation.
BLD-Footing6/6/20186/6/20186/6/2018PPASS
DetailsDave Hannah
John Phone #: ###-####--footings for parking lot
BLD-Wall Bracing5/30/20185/30/20185/30/2018PPART
DetailsJim Sly
shear- John Phone #: ###-####
Holdowns from foundation......and Holdowns ....1st story center shear wall thru floor to 2nd story center shear wall OK (North and South ends).
BLD-Wall Bracing5/17/20185/17/20185/17/2018PPASS
DetailsBrandon Shaw
BLD-Wall Bracing5/17/20185/17/20185/17/2018PPASS
DetailsBrandon Shaw
John Phone #: ###-####
BLD-Wall Bracing4/13/20184/13/20184/16/2018PNR
DetailsDave Hannah
John Phone #: ###-####
Print Occupancy Form  4/13/2018 DONE
CHANGE STATUS TO (ISS)  4/13/2018 DONE
Inspection Record Card- Bld  4/13/2018 DONE
OVERRIDE  3/26/2018  
Plan assigned to (JAR)3/5/20183/5/20183/26/2018 DONE
DetailsJulie Romig
**Plan Mod - 1st Rev Comp 2nd Rec'd 3/23 - Warm Springs Bldg A
Permit Ready to Issue  3/26/2018 DONE
DO NOT REISSUE - Plan mod fees due
Routing - Design Review3/23/2018 3/23/2018 PASS
DetailsKatelyn Menuge
Plan Mod - 2nd Review
Routing - PLAN CHECK3/23/2018 3/23/2018 PASS
DetailsJulie Romig
Plan Mod - 2nd Review
Routing - PLAN CHECK3/7/2018 3/22/2018 FAIL
DetailsJulie Romig
Plan Mod
Routing - Design Review3/7/2018 3/20/2018 FAIL
DetailsKatelyn Menuge
Plan Mod-Submitting updated elevations
Plan Modification Accepted  3/5/2018 DONE
DetailsChristina Prado
Plan Mod to remove windows at stairwell, add motion switches, replace metal band with stucco, revise roof insulation and add attic ventilation
BLD-Footing1/22/20181/22/20181/22/2018PPASS
DetailsDave Hannah
Interior footings - John Phone #: ###-####
BLD-Foundation11/8/201711/9/201711/9/2017APASS
DetailsDave Hannah
John-pour time 1:00 Phone #: ###-####
BLD-Footing11/1/201711/2/201711/2/2017APASS
DetailsDave Hannah
John Phone #: ###-####
Issue PAID IN FULL permit  8/30/2017 DONE
Print Occupancy Form  8/30/2017 DONE
DetailsChristina Prado
OVERRIDE  8/24/2017  
Plan assigned to (JAR)4/14/20174/14/20178/24/2017 DONE
DetailsJulie Romig
**1st Review Comp - 3rd Review Comp - 506 Warm Springs Apts
PLANS/APPL TAKEN TO FRONT DESK  8/24/2017 DONE
Permit Ready to Issue  8/24/2017 DONE
DetailsChristina Prado
Need:
ACHD - MET
RP
GC Form - MET
Revised Certificate of Value - MET

DO NOT ISSUE WITHOUT BLD17-02955 & BLD17-02956
Routing - PLAN CHECK8/21/2017 8/21/2017 PASS
DetailsJulie Romig
Plan Review #4
Routing Off Site - STRUCTURAL8/14/2017 8/18/2017 PASS
DetailsJulie Romig
Pass per ePlanReview
Routing - PLAN CHECK8/8/2017 8/18/2017 FAIL
DetailsJulie Romig
Plan Review report emailed to Architect.
Routing PW Street Lights8/9/2017 8/17/2017 PASS
DetailsTom Marshall
Routing PW Sewer Design8/9/2017 8/10/2017 PASS
DetailsKyle S. Rosenmeyer
Routing Off Site - STRUCTURAL8/8/2017 8/10/2017 FAIL
DetailsJulie Romig
Routing - MECHANICAL8/9/2017 8/9/2017 PASS
DetailsTroy James
Routing - PLUMBING8/9/2017 8/9/2017 PASS
DetailsBill VanDegrift
perplans and ISPC
Routing - PUBLIC WORKS8/9/2017 8/9/2017 PASS
DetailsRachael Beierle
Routing PW Drainage8/9/2017 8/9/2017 PASS
DetailsBrian Murphy
Routing - PLAN CHECK7/24/2017 8/3/2017 FAIL
DetailsJulie Romig
See attached plan review report.
Routing PW Drainage7/24/2017 8/3/2017 FAIL
DetailsBrian Murphy
NEED INFILTRATION SWALE LABELED BIORETENTION
Routing Off Site - STRUCTURAL7/24/2017 8/1/2017 FAIL
DetailsJulie Romig
Corrections required per ePlanReview.
Routing PW Sewer Design7/24/2017 7/28/2017 FAIL
DetailsKyle S. Rosenmeyer
Sewer service does not exist at this location. Tap sewer main in Goodman Street with a type "D" connection and install 4" PVC service line at 2% minimum slope. Call Boise Public Works 48 hours prior to construction to obtain tap permit and schedule inspection. Abandon unused sewer service at the main with watertight plug. Obtain plug permit from Boise Public Works at least 48 hours prior to performing work.
Routing - FIRE7/24/20177/24/20177/26/2017 PASS
DetailsScott Arellano
Attached revised comments to plans.
Routing PW Street Lights7/24/2017 7/25/2017 FAIL
DetailsTom Marshall
Routing - Design Review7/24/2017 7/24/2017 PASS
DetailsAndrea Tuning
Routing - PLUMBING7/24/2017 7/24/2017 PASS
DetailsBill VanDegrift
1) Provide suds relief as required by ISPC 711.0
2) Provide building service protection as required by Suez water.
Routing - PUBLIC WORKS7/24/2017 7/24/2017 PASS
DetailsRachael Beierle
Route to Impact Fee Review6/23/20176/26/20177/5/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  6/23/2017 FAIL
DetailsJulie Romig
Routing - PLAN CHECK4/14/2017 6/23/2017 FAIL
DetailsJulie Romig
Plan review report emailed to Architect and uploaded to ePlanReview.
Routing Off Site - STRUCTURAL4/14/2017 6/22/2017 FAIL
DetailsJulie Romig
See list of structural comments in ePlanReview Agency Comments Folder.
Routing PW Drainage4/17/2017 5/5/2017 FAIL
DetailsBrian Murphy
apdx j ,depth to groundwaterBIORETENTION NOT INFILTRATION ON SWALES
Routing - FIRE4/14/20174/14/20174/21/2017 FAIL
DetailsScott Arellano
Emailed correction items to architect. Attached plan review report to case.
Telephone call  4/20/2017 DONE
Spoke with the architect. Previous approval for builidng design and aerial access roadway has been discussed with the Fire Marshal. I will contact the assistant Fire Marshal for confirmation of alternate approval.
Routing PW Solid Waste4/17/2017 4/18/2017 PASS
DetailsEvan Carpenter
Solid waste is OK as planned.
Routing - Erosion and Sediment4/14/2017 4/18/2017 PASS
DetailsAndy J. Long
Routing - PLUMBING4/14/2017 4/18/2017 FAIL
DetailsBill VanDegrift
1) provide a site plan showing the sewer and water services to the locations on the plumbing design.
2) provide Suez Water required service protection.
Routing - MECHANICAL4/14/2017 4/17/2017 PASS
DetailsTroy James
Routing - PLANNING Land Div4/14/2017 4/17/2017 PASS
DetailsTodd Tucker
Routing - Addressing4/14/2017 4/17/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/14/2017 4/17/2017 PASS
DetailsRachael Beierle
Routing PW Street Lights4/17/2017 4/17/2017 FAIL
DetailsTom Marshall
Routing PW Sewer Design4/17/2017 4/17/2017 FAIL
DetailsKyle S. Rosenmeyer
Include connection to public sewer in permit submittal. Utilize existing sewer services to the property if possible.
Routing - PLANNING4/14/2017 4/14/2017 PASS
DetailsSusan Riggs
Parking standards apply as identifed in DR comments.
Routing - Design Review4/14/2017 4/14/2017 FAIL
DetailsAndrea Tuning
Construct the standard parking spaces to be a minimum of 20-feet deep or a minimum of 18-feet deep with the appropriate 2-foot overhang required by Boise City Code.

Construct all second and third story windows to be recessed a minimum of 2-inches from the façade to provide additional depth and character.

Limit the amount of stucco on the street facing facade to be no greater than 50 percent.
Intake Approval  4/14/2017 PASS
DetailsCarl D Madsen
Intake Approval  4/10/2017 FAIL
1st Prescreen 4/10/17 Carl Madsen ###-####
Please provide the following items.
1. Soils and Geotechnical report
2. Verification of legal lot and parcel form completed and signed by planning staff member.
3. Form 310 special inspection start-up form completed by the structural engineer.
4. Drainage O & M plan
5. Permanent O&M agreement form
6. Remove all stamps indicating not for construction
7. Review all sheets and verify all sheets are stamped.
Application received  4/7/2017 DONE
Application submitted via PDS Online on Apr 7 2017 12:37PM
First Notice 9/2/2019   
First Notice8/22/20198/22/2019   
DetailsBrandon Shaw