Print Statement | | | 12/19/2017 | | DONE |
|
|
|
|
First Notice | | 11/19/2017 | 12/12/2017 | | DONE |
|
|
|
sent in mail 12-13-17
|
BLD-Final | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Tony Young
|
|
|
Troy Phone #: ###-####
|
FIRE-Final Inspection | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete (FIR17-00569), commercial hood fire suppression system inspection complete (FIR17-00403), fire extinguishers are in place with current inspection tags, knox box is located by main entry. Final life fire safety inspection passed/complete.
|
Permanent Occupancy | | | 11/9/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/3/2017 | 11/6/2017 | 11/6/2017 | P | FAIL |
Troy Cobbley
|
|
|
Per the mechanical prints two duct smoke detectors are required. They were not addressed with the fire alarm permit which has been finaled. A new permit is needed.. Address numbers on both sides of the building are needed as well.
Troy Phone #: ###-####
|
Zoning Approval | 11/2/2017 | 11/2/2017 | 11/2/2017 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Ceiling Grid Inspection | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Tony Young
|
|
|
Troy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/11/2017 | 9/11/2017 | 9/12/2017 | P | PASS |
Tony Young
|
|
|
Troy Phone #: ###-####,, int walls
|
BLD-Energy code compliance | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | PART |
Tony Young
|
|
|
Troy Phone #: ###-####,, exterior walls ok,,
|
BLD-Framing/Rough-in | 9/8/2017 | 9/8/2017 | 9/8/2017 | P | NH |
Tony Young
|
|
|
Troy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/14/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/14/2017 | | DONE |
|
|
|
|
Telephone call | | | 5/11/2017 | | DONE |
Scott Arellano
|
|
|
Spoke with project manager (Sean Miller) regarding fire code plan review report. Revised fire code plan review report and resent to Sean and republished to permit case.
|
OVERRIDE | | | 5/5/2017 | | |
|
|
|
|
Plan assigned to (JAR) | 4/18/2017 | 4/18/2017 | 5/5/2017 | | DONE |
Julie Romig
|
|
|
DUE 05/09 - L3. Black Bear Diner TI ePlan
|
1st review completed | | | 5/5/2017 | | DONE |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/5/2017 | | DONE |
|
|
|
partial payment was made-i told Mike with Scott Hendrix Const that once the total was paid we could email him the permit to sign and have him sign and send back then we would send that remainder of the documents he needs. I sent a ESC card with him so he could fill it in when he starts the work CAN***met***Need RP, GC Form and Revised Cert of Value
|
Routing - Design Review | 4/12/2017 | | 5/5/2017 | | PASS |
Susan Riggs
|
|
|
Design Review approved in ePlanReview. SAR confirmed plans passed Design Review.
|
Routing - PLAN CHECK | 4/12/2017 | | 5/5/2017 | | PASS |
Julie Romig
|
|
|
|
Routing PW Environmental | 4/12/2017 | | 4/26/2017 | | PASS |
Rick Christenson
|
|
|
|
Plan assigned to (JG) | 4/12/2017 | 4/12/2017 | 4/18/2017 | | DEFR |
Javier Guzman
|
|
|
5/02 L3 Black Bear Diner ePlan
|
Routing - FIRE | 4/12/2017 | 4/12/2017 | 4/17/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - Erosion and Sediment | 4/12/2017 | | 4/17/2017 | | PASS |
Melissa Jannusch
|
|
|
|
Routing PW Solid Waste | 4/12/2017 | | 4/17/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing - MECHANICAL | 4/12/2017 | | 4/17/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 4/12/2017 | | 4/17/2017 | | PASS |
Bill VanDegrift
|
|
|
1) additional cross connection protection may be required.
2) c.o. required downstream of the grease interceptor.
3) vent floor drains in the resatrooms.
4) 2" min. waste below slab.
|
Routing - Addressing | 4/12/2017 | | 4/12/2017 | | PASS |
Laura Hunter
|
|
|
Corrected address to 7530 W State St
|
Routing - PUBLIC WORKS | 4/12/2017 | | 4/12/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 4/12/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl W approved per screen, approval from CDH uploaded in documents, plan review fees paid
|
Plan Reviewer's activity | | | 4/12/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Sean, Please make sure that you reach out to ACHD for review on this first time build out. If additional fees are due they will need to be paid or paid when the permit is issued. If no fees are do please submit the documentation from ACDH as such.
Thank you
Adele Schaffeld-Griffin
Assistant Building Official / Plan Review Manager
Planning & Development Services Department
City of Boise - 150 N. Capitol Blvd.
P.O. Box 500
Boise, ID 83701
Office ###-####
Email – aschaffeldgriffin@cityofboise.org
“Building Boise Together.”
|
Plan Reviewer's activity | | | 4/11/2017 | | PASS |
|
|
|
Plan intake review completed and approved.
|
Application received | | | 4/7/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 7 2017 5:32PM
|