Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD17-00970
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 101 S CAPITOL BLVD
Project NameUS Bank 10th & 11th Floor
Customer Number 
ePlanReviewYes
Description
(US BANK BUILDING - 10TH and 11TH FLOOR - LOBBY & RESTROOM REMODEL) This building is fire sprinklered because it is a high-rise. Permit is to remodel an existing 1,288 lobby area, lobby restroom and tenant space wall demo on the 10th and 11th floor of an existing high-rise building. This permit is approved contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls within the tenant space floor area, removal of select door/door frames, remove and replace select light fixtures, remove and replace restroom counter tops and mirrors, adding vertical grab bars in accessible toilet compartments?, removal of lobby soffit, construction of select interior non-bearing walls at corridor, new door/door frames, new lobby arched gypsum soffit ceiling, electrical work and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully fire sprinklered any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: No Occupancy allowed under this permit for the tenant space area. Tenant shall apply for certificate of occupancy prior to occupying tenant space. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Meeting  5/11/2018 DONE
sent statement 5-14
Print Statement  4/23/2018 DONE
swent 1st late notice 4-24-18
Print Statement  1/8/2018 DONE
Second Notice 11/24/201712/12/2017 DONE
Mailed 12-13-17
First Notice11/7/201711/7/201711/14/2017 DONE
DetailsDave Hannah
Mailed 11-15-17
BLD-Final11/7/201711/7/201711/7/2017PPASS
DetailsDave Hannah
Larrin Phone #: ###-####
DOC - Permit Finaled11/7/201711/7/201711/7/2017PPASS
DetailsDave Hannah
BLD-Final11/2/201711/6/201711/7/2017PCANC
DetailsDave Hannah
Larren Phone #: ###-####
FIRE-Final Inspection11/2/201711/6/201711/6/2017APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work passed/complete.
BLD-Framing/Rough-in6/19/20176/19/20176/19/2017PPASS
DetailsDave Hannah
Larrin Phone #: ###-####
Inspection Record Card- Bld  6/16/2017 DONE
Issue PAID IN FULL permit  6/16/2017 DONE
Plan assigned to (JG)5/22/20175/22/20176/15/2017 PASS
DetailsJavier Guzman
1st rev comp, 5/26 L1 US Bank 10th & 11th Floor ePlan
Routing - PLAN CHECK6/15/2017 6/15/2017 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/15/2017 DONE
Permit Ready to Issue  6/15/2017 DONE
need GC form
Route to Impact Fee Review5/26/20175/29/20176/5/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
Routing - PLAN CHECK5/22/2017 5/26/2017 FAIL
DetailsJavier Guzman
1st review completed  5/26/2017 FAIL
DetailsJavier Guzman
Routing - Addressing5/22/2017 5/22/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/22/2017 5/22/2017 PASS
DetailsMorgan Webb
Intake Approval  5/22/2017 PASS
DetailsJavier Guzman
Application received  4/10/2017 DONE
Application submitted via PDS Online on Apr 10 2017 8:50AM