Permit Information
Permit NumberBLD17-00980
StatusIssued
Name ESI
Site Address 701 E BOISE AVE
Project NameTimberline High Schoo Addition
Customer Number 
ePlanReviewYes
Description
(TIMBERLINE HIGH SCHOOL - ADDITION)**Project Management- Ron Hill** (EXPEDITE REVIEW) MODIFICATION #2 11/5/17 TO USE THE SPRAY ON OPTION ALREADY SHOWN IN THE UL ASSEMBLIES"" ""MODIFICATION TO ADD AN EJECTOR PUMP TO THE WASTE PLUMBIGN SYSTEM"" Permit for a 30,000 s.f. 2 story classroom addition and partial remodel to the existing 127,078 sq. ft. Timberline High School with work to include new openings between the new and existing construction interior select demolition of some classroom areas, general site work and construction of the new addition. This building is fully fire sprinklered for area increase and is alarmed. Any alterations to the sprinkler or alarm system shall comply with NFPA 13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/13/201812/13/201812/21/2018 CANC
DetailsJim Storey
BLD-Final7/26/20187/31/20187/31/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-#### final ok oupon all others that did not sign oc card.
FIRE-Final Inspection7/26/20187/30/20187/30/2018APART
DetailsJim Page
Partial life fire safety inspection complete, fire sprinkler inspection complete, fire alarm inspection for addition is complete (fire alarm permit is for a complete fire alarm upgrade for the whole school, fire alarms are active through school and new addition, TCO is authorized for 60 days per conversation with Ron Johnson, when FIR permit for fire alarms is finaled then life fire safety for this permit can be finaled), fire exitnguishers are in place with current inspection tags. TCO authorized for 60 days contingent on the fire alarm panel upgrade being completed.

Kevin Phone #: ###-####
BLD-Other7/24/20187/25/20187/25/2018PPASS
DetailsJim Storey
Kevin-Ceiling cover Phone #: ###-####
BLD-Framing/Rough-in7/2/20187/3/20187/3/2018APART
DetailsDave Hannah
Daniel Phone #: ###-#### ok to cover specal ed area
BLD-Framing/Rough-in6/18/20186/19/20186/19/2018APASS
DetailsJim Storey
Ken Phone #: ###-#### 2nd floor link.
BLD-Aging Inspection6/12/20186/12/20186/12/2018 PASS
DetailsJim Storey
BLD-Ceiling Grid Inspection3/29/20183/30/20183/30/2018APASS
DetailsJim Storey
Kent Phone #: ###-####-first floor ceilling ok
BLD-Ceiling Grid Inspection3/28/20183/29/20183/29/2018PCANC
DetailsJim Storey
Kent-first floor Phone #: ###-####
BLD-Ceiling Grid Inspection3/14/20183/15/20183/15/2018APASS
DetailsJim Storey
Phone #: 2089723063 >> Inspection requested via mobile web by Kevin Antonucci
BLD-Conference2/22/20182/23/20182/23/2018PPASS
DetailsJim Storey
Phone #: 2089723063 >> Inspection requested via mobile web by Kevin Antonucci hard lids ok to cover.
BLD-Energy code compliance1/26/20181/29/20181/29/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-####1st and 2nd
BLD-Framing/Rough-in1/17/20181/18/20181/18/2018ACANC
DetailsMike Jordan
Second level - Andrew Phone #: ###-####
BLD-Energy code compliance1/18/20181/18/20181/18/2018APASS
DetailsMike Jordan
Second level - Andrew Phone #: ###-####. 2nd. floor exterior walls only. No stairwells at this time.
BLD-Framing/Rough-in1/12/20181/16/20181/16/2018ACANC
DetailsJim Storey
Second floor // Kevin Phone #: ###-#### PER ANDREW VIA EMAIL (BLH)
Inspection Record Card- Bld  1/12/2018 DONE
BLD-Framing/Rough-in12/13/201712/13/201712/13/2017PPASS
DetailsJim Storey
Russell Phone #: ###-#### 2nd floor fireprooffing ok framing ok trade work in progess.
BLD-Framing/Rough-in11/14/201711/15/201711/16/2017PPART
DetailsJim Storey
Russel Phone #: ###-#### exterior walls ok pending fireprooffing exterior beams ok to sheet.
BLD-Framing/Rough-in11/8/201711/13/201711/13/2017APASS
DetailsJim Storey
Kevin Phone #: ###-#### exterior wall framing in progress// ok for pannel mock up north east corner.
Reopen Permit (ISS)  11/8/2017 DONE
OVERRIDE  11/6/2017  
Permit Ready to Issue  11/6/2017 DONE
PLEASE DO NOT RE ISSUE-as per CDM no fees due for plan mod
Plan assigned to (CDM)11/1/201711/1/201711/5/2017 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK11/5/2017 11/5/2017 PASS
DetailsCarl D Madsen
Plan Modification Accepted  11/1/2017 DONE
DetailsChristina Prado
Plan mod requested to change the second floor roof/ceiling assembly to spray on fireproofing
BLD-Framing/Rough-in10/27/201710/30/201710/30/2017APASS
DetailsJim Storey
Kevin Phone #: ###-#### roof paripet framing ok/ need r 28 for roof deck insulation.
CHANGE STATUS TO (ISS)  10/18/2017 DONE
plan mod fees paid
OVERRIDE  10/17/2017  
Plan assigned to (CDM)10/13/201710/13/201710/17/2017 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK10/16/2017 10/17/2017 PASS
DetailsCarl D Madsen
Permit Ready to Issue  10/17/2017 DONE
All Met for Plan Mod

DO NOT REISSUE
Routing - PLUMBING10/16/2017 10/16/2017 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Issue PAID IN FULL permit  6/20/2017 DONE
Print Occupancy Form  6/20/2017 DONE
OVERRIDE  5/9/2017  
Permit Ready to Issue  5/9/2017 DONE
DetailsChristina Prado
Need GC Form & Revised Certificate of Value for issuance

*** REFER TO STATE FEE SCHEDULE WHEN CALCULATING REVISED PLAN CHECK FEES ***
Plan assigned to (CDM)4/14/20174/14/20175/8/2017 PASS
DetailsCarl D Madsen
1st comp. Timberline High school
Routing Off Site - STRUCTURAL5/3/2017 5/8/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  5/8/2017 DONE
Routing - PLAN CHECK5/3/2017 5/8/2017 PASS
DetailsCarl D Madsen
Routing - ELECTRICAL5/3/2017 5/5/2017 PASS
DetailsJavier Guzman
Routing - MECHANICAL5/3/2017 5/4/2017 PASS
DetailsTroy James
Route to Impact Fee Review4/25/20174/28/20174/25/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
1st review completed  4/25/2017 FAIL
Routing Off Site - STRUCTURAL4/14/2017 4/25/2017 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK4/14/2017 4/22/2017 FAIL
DetailsCarl D Madsen
Plan review report attached.
Routing - ELECTRICAL4/14/2017 4/22/2017 FAIL
DetailsJavier Guzman
Routing - PLANNING4/14/2017 4/21/2017 PASS
DetailsSusan Riggs
Routing PW Drainage4/14/2017 4/21/2017 PASS
DetailsBrian Murphy
Routing - FIRE4/14/20174/14/20174/19/2017 PASS
DetailsScott Arellano
Attached review comment to plans.
Routing - Erosion and Sediment4/14/2017 4/19/2017 PASS
DetailsAndy J. Long
ESC plan with site map and narrative approved. Valid PD, need to designate RP at time of permit issue. Site preparation and BMP installation required prior to construction. Call ###-#### to schedule.
Routing - MECHANICAL4/14/2017 4/18/2017 FAIL
DetailsTroy James
Routing - PLUMBING4/14/2017 4/17/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing4/14/2017 4/17/2017 PASS
DetailsLaura Hunter
Routing PW Street Lights4/14/2017 4/17/2017 PASS
DetailsTom Marshall
Routing PW Environmental4/14/2017 4/14/2017 PASS
DetailsRick Christenson
On-site Inspection for Dark Room BMP's
Routing - PUBLIC WORKS4/14/2017 4/14/2017 PASS
DetailsRachael Beierle
Intake Approval  4/14/2017 PASS
Routing - PLANNING Land Div4/14/2017 4/14/2017 PASS
DetailsTodd Tucker
Intake Approval  4/13/2017 FAIL
DetailsJulie Romig
Add description to file names on FP, M, and P sheets
Application received  4/10/2017 DONE
Application submitted via PDS Online on Apr 10 2017 2:49PM