Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD17-00989
StatusFinaled
Name TIM AUSTIN CONSTRUCTION
Site Address 3809 E BARBER DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Valley perimter lot - Must comply with WUI zone A requirements - Class "A" Roof Required** Permit to add a 450 sq. ft. attached garage onto the existing home. The garage is conditioned and therefore shall comply with the energy code. An electrical and HVAC permit will be pulled separately. The work will be in compliance with the approved plans, and local codes. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/13/20177/14/20177/14/2017APASS
DetailsBrandon Shaw
Call 20 mins before to meet // Tim Phone #: ###-####
DOC - Permit Finaled7/14/20177/14/20177/14/2017PPASS
DetailsBrandon Shaw
DOC - Permit Finaled7/14/20177/14/20177/14/2017PPASS
DetailsBrandon Shaw
BLD-Energy code compliance6/15/20176/15/20176/15/2017PPASS
DetailsBrandon Shaw
Shear // Tim Phone #: ###-####
BLD-Framing/Rough-in6/13/20176/14/20176/14/2017APASS
DetailsBrandon Shaw
Call half hour before to meet // Tim Phone #: ###-####
BLD-Wall Bracing5/31/20176/1/20176/1/2017APASS
DetailsBrandon Shaw
Shear // Tim Phone #: ###-####
BLD-Foundation5/1/20175/1/20175/1/2017PPASS
DetailsBrandon Shaw
Rebar // Dave Phone #: ###-####
BLD-Footing4/27/20174/27/20174/27/2017PPASS
DetailsBrandon Shaw
Dave Phone #: ###-####
BLD-Footing4/25/20174/26/20174/26/2017PCANC
DetailsBrandon Shaw
Dave Phone #: ###-####
Routing Walk-In (Zoning)4/14/20174/14/20174/14/2017PPASS
DetailsSue Cummings
Received DHR approval 4/14/17
Routing Walk-In (BLD)4/14/20174/14/20174/14/2017PPASS
DetailsDavid Ferguson
Plan assigned to (DAF)4/14/20174/14/20174/14/2017 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK4/14/2017 4/14/2017 PASS
DetailsDavid Ferguson
Case Summary (BLD)  4/14/2017 DONE
DetailsDavid Ferguson
Inspection Record Card- Bld  4/14/2017 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  4/14/2017 DONE
Permit Ready to Issue  4/14/2017 DONE
all requirements met
Issue PAID IN FULL permit  4/14/2017 DONE
Routing Walk-In (Zoning)4/11/20174/11/20174/11/2017AFAIL
DetailsSue Cummings
Need approval letter from Harris Ranch
Routing Walk-In (BLD)4/11/20174/11/20174/11/2017AFAIL
DetailsDavid Ferguson
Need approval letter from Harris Ranch
1st review completed  4/11/2017 DONE
DetailsDavid Ferguson
Application received 4/11/2017