Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-00992
StatusFinaled
Name HOME FREE PROPERTIES LLC
Site Address 2515 W MADISON AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Plan mod on 4/19/17 to remove the proposed window in the upstairs bathroom and install a skylight instead.** Permit to remodel existing residence. Work to include removing non-loadbearing walls on main floor to create an open floor plan between the kitchen and dining room. Also, move the sink from the bathroom into the existing closet and install a pocket door to create a master bedroom. On the upper level work consists of adding a full bathroom removing select interior non-loadbearing walls and constructing new walls to create two bedrooms. All windows will be replaced. A minimum of one code compliant egress window will be required in each bedroom. Smoke and Carbon Monoxide detectors shall be installed throughout. Electrical, and plumbing permits will be pulled separately. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  8/22/2017 DONE
emailed to applicant per her request
BLD-Final8/16/20178/18/20178/18/2017APASS
DetailsDave Hannah
Mandy Phone #: ###-####
DOC - Permit Finaled8/18/20178/18/20178/18/2017PPASS
DetailsDave Hannah
BLD-Energy code compliance6/12/20176/13/20176/13/2017ACANC
DetailsDave Hannah
Mandy Phone #: ###-####
BLD-Energy code compliance6/13/20176/13/20176/13/2017PPASS
DetailsDave Hannah
Mandy-please call 40 minuites prior to meet Phone #: ###-####
BLD-Energy code compliance6/12/20176/12/20176/12/2017PNR
DetailsDave Hannah
Mandy Phone #: ###-####
BLD-Framing/Rough-in6/8/20176/9/20176/12/2017PPASS
DetailsDave Hannah
Mandy Phone #: ###-####
CHANGE STATUS TO (ISS)  6/8/2017 DONE
DetailsChristina Prado
(F) Reprint permit  5/10/2017 DONE
Routing Walk-In (BLD)4/11/20174/11/20174/11/2017ADONE
DetailsDavid Ferguson
Plan assigned to (DAF)4/11/20174/11/20174/11/2017 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK4/11/2017 4/11/2017 PASS
DetailsDavid Ferguson
Case Summary (BLD)  4/11/2017 DONE
DetailsDavid Ferguson
Inspection Record Card- Bld  4/11/2017 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  4/11/2017 DONE
DetailsDavid Ferguson
Issue PAID IN FULL permit  4/11/2017 DONE
Permit Ready to Issue  4/11/2017 DONE
1st review completed  4/11/2017 DONE
DetailsDavid Ferguson
Application received 4/11/2017