Permit Information
Permit NumberBLD17-01002
StatusFinaled
Name RRC CONTRACTORS
Site Address 1070 N CURTIS RD Unit: STE 125
Project NameDaVita - Dialysis Home Train
Customer Number 
ePlanReviewNo
Description
(DA VITA TABLE ROCK DIALYSIS HOME TRAINING FACILITY – 1ST STORY – NORTH SIDE) The fire sprinkler system is used for building area increase. To combine two tenant spaces on the 1st story to create a 4,415 square foot medical office tenant space. Patients are not expected to be rendered incapable of self-preservation. Work is to include interior nonbearing walls, two toilet rooms accessible to the disabled, interior doors, interior windows, suspended acoustical ceilings, gypsum board soffits, an exterior store front door with sidelight, millwork, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 (including the installation of quick-response fire sprinkler heads within this tenant space) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  4/4/2018 DONE
Paper drawings taken to records
Third Notice 1/17/20181/18/2018 DONE
This permit finaled on the web by derek cooper
Second Notice 12/22/20171/12/2018 DONE
Mailed 1-12-18
First Notice 12/9/201712/12/2017 DONE
Mailed 12-13-17
Case Summary (BLD)  11/29/2017 DONE
BLD-Final11/21/201711/22/201711/22/2017APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Don Walker. OK for perm occ. All glass installed and is tempered. zoning signed off.
Permanent Occupancy  11/22/2017 DONE
BLD-Final11/17/201711/17/201711/17/2017PPART
DetailsJim Sly
Don Walker 208 505 7674
OK for Temporary Occupancy. OK for Perm Occ. after Zoning signs off for Perm Occ. and after inspection of glass for interior doors and windows. Glass on order.
FIRE-Final Inspection11/16/201711/17/201711/17/2017APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final11/16/201711/17/201711/17/2017ACANC
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Don Walker
Zoning Approval11/17/201711/17/201711/17/2017 PASS
DetailsSarah Schafer
BLD-Ceiling Grid Inspection11/8/201711/9/201711/9/2017APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Don Walker
BLD-Framing/Rough-in9/8/20179/8/20179/8/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Don Walker
Issue PAID IN FULL permit  7/18/2017 DONE
Print Occupancy Form  7/18/2017 DONE
Plan assigned to (CJW)4/12/20174/12/20177/13/2017 PASS
DetailsCarl Westfall
(2nd done) (May 2 - 15 days) (38 sheets) Paper - Davita Table Rock Home Trainin
Routing - PLAN CHECK7/11/2017 7/13/2017 PASS
DetailsCarl Westfall
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  7/13/2017 DONE
Print Occupancy Form  7/13/2017 DONE
Permit Ready to Issue  7/13/2017 DONE
need GC form
Telephone call  7/13/2017 DONE
Called RRC Contractors and told Jack permit is ready, fee due and need GC form
Routing - PLUMBING7/11/2017 7/11/2017 PASS
DetailsBill VanDegrift
no water connections to the dialysys equipment, see documents attached
Routing - PLUMBING6/23/2017 6/26/2017 FAIL
DetailsBill VanDegrift
provide response to cross connection control for dialysis mechine
Plan resubmittals received  6/23/2017 DONE
Received response letter, as well as two sets of revised plan sheets marked A1.0 & P0.1; Plans stamped and taken to CJW for review
Routing - PLAN CHECK6/23/2017 6/23/2017 PASS
DetailsCarl Westfall
Route to Impact Fee Review6/2/20176/5/20176/5/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
Routing - FIRE5/26/2017 6/2/2017 PASS
DetailsScott Arellano
Attached comments to plans.
1st review completed  6/2/2017 FAIL
Failed Plumbing
Routing - PLANNING5/26/2017 5/26/2017 PASS
DetailsSarah Schafer
New exterior door - Approved through the building permit.
Plan resubmittals requested  5/26/2017 DONE
Plan review report sent to the applicant and to the architect
Routing - PLAN CHECK4/19/2017 5/26/2017 FAIL
DetailsCarl Westfall
Revised drawings required (13 days over time frame)
Routing - MECHANICAL  4/19/2017 PASS
Routing - PLUMBING  4/18/2017 FAIL
1) asse 1070 mixing valve required at public lavs
2) provide cross connection protection at the dialysis equipment.
Routing - Addressing4/12/2017 4/13/2017 PASS
DetailsLaura Hunter
Ste 125
Routing - PUBLIC WORKS4/12/2017 4/13/2017 PASS
DetailsRachael Beierle
no enviromental review needed per rwc
Routing - Erosion and Sediment4/13/2017 4/13/2017 PASS
DetailsAndy J. Long
No exterior work. No ESC permit or plan required.
Plans ACCEPTED BY PLAN TECH  4/12/2017 DONE
Intake Approval  4/12/2017 PASS
DetailsJavier Guzman
Pending Assignment by AJS4/12/2017 4/12/2017 DONE
DetailsAdele J Schaffeld-Griffin
Recd Pcfee & Taken To Pln CK  4/11/2017 DONE
Application received 4/11/2017