CHANGE STATUS TO (FNL) | | | 4/10/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/19/2018 | 1/22/2018 | 1/22/2018 | A | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/25/2017 | 5/25/2017 | 5/25/2017 | P | CANC |
Jim Sly
|
|
|
Jon Phone #: ###-####
|
OVERRIDE | | | 4/12/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/12/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 4/11/2017 | | 4/12/2017 | | PASS |
Christina Prado
|
|
|
Ok per Bob A
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2017 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/12/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 4/11/2017 | | | |
|
|
|
|