Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD17-01018
StatusFinaled
Name RUEDEBUSCH DEVELOPMENT & CONSTRUCTI
Site Address 6610 S ELITE DR
Project NameFedEx Ground
Customer NumberBLD17-01121 SECURITY BLDG
ePlanReviewYes
Description
(FEDEX DISTRIBUTION CENTER)(2 PERMITS FILED UNDER BLD17-01018 IN EPLANREVIEW) Non Separated Use Building-No Fire Separation Required*Deferred submittal-ceiling specifications submitted 10/16/17 ajs**This is an unlimited area building with 60 foot yards all the way around. New package distribution center. Conveyor equipment and racking permit to be submitted separately. Scope of permit- full build out of 234,857 distribution center. Work to include plumbing, mechanical, electrical, fire sprinkler and fire alarm system. Interior nonbearing partition walls to create accessory office area, accessible restrooms and finish material. Core and shell constructed under BLD17-00563 and GRD17-0013. This building is fully fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  12/14/2018 DONE
First Follow up  11/13/2018 DONE
Third Notice 10/17/201811/7/2018 DONE
mailed 11-12
Third Notice 9/15/201810/12/2018 DONE
mailed 10-15-18
Second Notice 7/21/20189/10/2018 DONE
mailed 9-11-18
First Notice 7/8/20187/11/2018 DONE
mailed 7-12-18
PubWorks Occupancy Approval6/28/20186/28/20186/28/2018 DONE
DetailsTiffany Lowery
Permanent Occupancy  6/28/2018 DONE
BLD-Final6/20/20186/21/20186/21/2018PPASS
DetailsJim Storey
Darrell Phone #: ###-####
FIRE-Final Inspection6/20/20186/21/20186/21/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, opticon has been tested and is operational, knox box is located on the west side of building next to FACP access, final life fire safety inspection complete.

Darrell Phone #: ###-####
Zoning Approval6/19/20186/19/20186/19/2018 DONE
DetailsAndrea Tuning
BLD-Ceiling Grid Inspection5/23/20185/23/20185/23/2018PPASS
DetailsJim Storey
Plan Reviewer's activity  12/4/2017 DONE
DetailsAdele J Schaffeld-Griffin
Recieved letter from architect in regards to separation of office and warehouse. the Building code does not require any separation. This letter is to resolve and update drawings to reflect design intent.
Plan Reviewer's activity  10/16/2017 DONE
DetailsAdele J Schaffeld-Griffin
recieved and uploaded ceiling submittal standards
Issue PAID IN FULL permit  9/27/2017 DONE
DetailsChristina Prado
Print Occupancy Form  9/27/2017 DONE
DetailsChristina Prado
Expiration Notice9/14/201710/5/20179/14/2017 DONE
DetailsBrittany Hill
Plan assigned to (AJS)4/20/20174/20/20177/20/2017 PASS
DetailsAdele J Schaffeld-Griffin
FedEx
Routing - PLAN CHECK7/20/2017 7/20/2017 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  7/20/2017 DONE
Permit Ready to Issue  7/20/2017 DONE
DetailsChristina Prado
Need GC Form and Revised Value - MET

DO NOT ISSUE WITHOUT BLD17-01121
Routing - FIRE6/19/20176/19/20176/19/2017 PASS
DetailsKatie Marron
Revised report attached to case.
Routing - PLUMBING6/19/2017 6/19/2017 PASS
DetailsDaryl Spivey
Install oil/sand interceptor as required with venting.
Tempered water as required ASSE 1070 at lavs.
Route to Impact Fee Review6/13/20176/16/20176/14/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
1st review completed  6/13/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK4/20/2017 6/13/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE4/20/20174/20/20174/26/2017 FAIL
DetailsKatie Marron
Report attached to case, changemarks created in eplan. Architect's email was not provided.
Routing PW Drainage4/25/2017 4/25/2017 PASS
DetailsBrian Murphy
Routing - MECHANICAL4/20/2017 4/25/2017 PASS
DetailsTroy James
Routing - PLANNING Land Div4/20/2017 4/21/2017 PASS
DetailsTodd Tucker
Routing - PUBLIC WORKS4/20/2017 4/21/2017 PASS
DetailsRachael Beierle
Intake Approval  4/20/2017 PASS
DetailsAdele J Schaffeld-Griffin
Pre screen completed by Julie, plan review fees paid
Routing - PLUMBING4/20/2017 4/20/2017 FAIL
DetailsBill VanDegrift
1) vent upstream trap on trench drains
2) public works pretreatment approval needed on intercepter
3) vent intercepter per red lines
4) tempering valve required on all public lavs
Routing - Addressing4/20/2017 4/20/2017 PASS
DetailsLaura Hunter
Routing - Design Review4/20/2017 4/20/2017 PASS
DetailsAndrea Tuning
Intake Approval  4/13/2017 FAIL
DetailsJulie Romig
Need 2 applications - one application for distribution building and one for security building.
Fire flow letter
304 Registered Design Professional form
310 Special Inspections (if there are additional needed for building)
Application received  4/12/2017 DONE
Application submitted via PDS Online on Apr 12 2017 12:48PM