Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD17-01030
StatusFinaled
Name SEIDL HOME COMPANY
Site Address 2716 S BARNSIDE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Valley, Zone "B", Class "A" roof required. Permit for the construction of a new 4091 sq. ft., two story (first story 3092 sq. ft., second story 1017 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 374 sq. ft. of covered patio/porch and a 1743 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. Prescriptive Energy Code is proposed ***BJM***
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/26/20181/26/20181/26/2018PCANC
DetailsBrandon Shaw
Phil Phone #: ###-####
DOC - Permit Finaled1/26/20181/26/20181/26/2018PPASS
DetailsBrandon Shaw
BLD-Energy code compliance8/17/20178/18/20178/18/2017APASS
DetailsBrandon Shaw
Phil Phone #: ###-####
BLD-Framing/Rough-in8/15/20178/16/20178/16/2017APASS
DetailsBrandon Shaw
Phil Phone #: ###-####
Plan Modification Accepted  7/26/2017 DONE
resubmitted manual j report
Routing - MECHANICAL7/26/2017 7/26/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing7/17/20177/18/20177/18/2017APASS
DetailsBrandon Shaw
Shear // Phil Phone #: ###-####
BLD-Footing5/12/20175/12/20175/12/2017PPASS
DetailsBrandon Shaw
Bill Phone #: ###-####
BLD-Footing5/10/20175/10/20175/10/2017PPASS
DetailsBrandon Shaw
pour time 2:30 //Bill Phone #: ###-####
Issue PAID IN FULL permit  5/4/2017 DONE
OVERRIDE  5/3/2017  
Plan assigned to (BJM)4/14/20174/14/20175/3/2017 DONE
DetailsBrian McGowan
Due 4-26 - FAIL -Harris Ranch approval letter required and wall bracing calculations
Inspection Record Card- Bld  5/3/2017 DONE
Telephone call  5/3/2017 DONE
Spoke with John informing him that this permit is ready and the fee amount due for issuance
Routing - PLAN CHECK5/3/2017 5/3/2017 PASS
DetailsBrian McGowan
Case Summary (BLD)  5/3/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  5/3/2017 DONE
DetailsBrian McGowan
Routing - PLANNING5/3/2017 5/3/2017 PASS
DetailsSue Cummings
Permit Ready to Issue  5/3/2017 DONE
met
Plan resubmittals received  5/2/2017 DONE
resubmittals recieved 2 sets of sheets 4 and 5-took to Brian McGowan
1st review completed  4/26/2017 FAIL
DetailsBrian McGowan
Harris Ranch approval letter required and wall bracing calculations
Routing - PLAN CHECK  4/26/2017 FAIL
DetailsBrian McGowan
Harris Ranch approval letter required and wall bracing calculations
Routing - MECHANICAL  4/21/2017 PASS
DetailsTroy James
Route to Impact Fee Review4/13/20174/16/20174/14/2017 PASS
DetailsTonya Wallace
Initial residential review of new SFD permits requested for now.
Plan assigned to (AJS)4/13/20174/13/20174/14/2017 DEFR
DetailsAdele J Schaffeld-Griffin
Plans ACCEPTED BY PLAN TECH  4/13/2017 DONE
DetailsChristina Prado
Intake Approval  4/13/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  4/13/2017 DONE
DetailsChristina Prado
Routing - Addressing4/13/2017 4/13/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS  4/13/2017 PASS
Application received 4/13/2017   
Routing - PLANNING4/13/2017   FAIL
No Approval from Harris Ranch.