Plan Reviewer's activity | | | 12/21/2018 | | DONE |
|
|
|
Took the paper drawings to Records
|
DOC - Permit Finaled | | | 7/26/2018 | | DONE |
|
|
|
Scope of work completed. Associated permits finaled.
|
BLD-Final | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for pool area complete.
sched final inspections for pool per Jim Sly Phone #: ###-####
|
Zoning Approval | 6/28/2018 | 6/28/2018 | 6/28/2018 | | DONE |
Andrea Tuning
|
|
|
|
(F) Reprint permit | | | 5/17/2018 | | DONE |
|
|
|
|
BLD-Aging Inspection | 11/16/2017 | 11/16/2017 | 11/17/2017 | | CANC |
Jim Sly
|
|
|
|
BLD-Final | 11/17/2017 | 11/17/2017 | 11/17/2017 | P | NR |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 11/17/2017 | 11/17/2017 | 11/17/2017 | | CANC |
Jim Sly
|
|
|
|
BLD-Footing | 6/30/2017 | 7/3/2017 | 7/5/2017 | P | PASS |
Brandon Shaw
|
|
|
For rebar,
|
Issue PAID IN FULL permit | | | 6/7/2017 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 6/7/2017 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 4/26/2017 | 4/26/2017 | 6/6/2017 | | PASS |
Carl Westfall
|
|
|
(1st done) (May 16 - 15 days) paper - Arboretum Pool
|
Routing - PLAN CHECK | 5/11/2017 | | 6/6/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing - FIRE | 6/6/2017 | | 6/6/2017 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
1st review completed | | | 6/6/2017 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/6/2017 | | 6/6/2017 | | DONE |
Carl Westfall
|
|
|
Routing complete
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/6/2017 | | DONE |
|
|
|
**MET** (GC turned in app. number is on last page) need GC form
|
Print Occupancy Form | | | 6/6/2017 | | DONE |
|
|
|
|
Telephone call | | | 6/6/2017 | | DONE |
|
|
|
Spoke with Caty informing her that this permit is ready and the fee amount due
|
Routing - PLUMBING | 5/10/2017 | | 5/11/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Telephone call | | | 5/11/2017 | | DONE |
|
|
|
Katie called to see where permit was-i told her where the permit was and i gave her Carl W's phone number.
|
Routing - Erosion and Sediment | | | 5/10/2017 | | PASS |
Andy J. Long
|
|
|
No new ESC permit required. Pool construction to be covered under exisitng site permit ESC15-01579.
|
Routing - MECHANICAL | 5/10/2017 | | 5/10/2017 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 5/9/2017 | | 5/9/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per the changes seen on the site plan in modifications for building elevations in DRH16-00498.
|
Routing - PLANNING | 5/3/2017 | | 5/9/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PUBLIC WORKS | | | 5/3/2017 | | PASS |
|
|
|
|
Routing PW Drainage | 4/27/2017 | | 5/3/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 4/27/2017 | | 4/27/2017 | | PASS |
Morgan Webb
|
|
|
POOL AND SPA ONLY.
|
Routing - Addressing | 4/26/2017 | | 4/26/2017 | | PASS |
Laura Hunter
|
|
|
2964 E Parkcenter Blvd is the clubhouse address, should be used for the pool permit also
|
Plans ACCEPTED BY PLAN TECH | | | 4/26/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/25/2017 | | PASS |
Carl Westfall
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/25/2017 | | DONE |
|
|
|
|
Application received | | 4/14/2017 | | | |
|
|
|
|