Second Notice | | 2/22/2018 | 2/21/2018 | | DONE |
|
|
|
This permit finaled on the web by Ryan Steinwand
|
First Notice | 1/22/2018 | 1/22/2018 | 2/12/2018 | | DONE |
Mike Jordan
|
|
|
Mailed 2-13-18
|
BLD-Final | 1/19/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Mike Jordan
|
|
|
Joseph- ###-####=please call 20 minutes prior to meet
|
DOC - Permit Finaled | 1/22/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Mike Jordan
|
|
|
Reviewed special inspection reports ok. Noted allrequired signs opffs completed. Certificate of completion was issued.
|
Zoning Approval | 1/19/2018 | 1/19/2018 | 1/19/2018 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 1/9/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by Ryan Steinwand
|
BLD-Final | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | NR |
Mike Jordan
|
|
|
Damian Phone #: ###-####. fire/life/safety has failed.
|
FIRE-Final Inspection | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide a tagged fire extinguisher as discussed and a racking permit for the storage rack within the building.
Phone #: ###-#### Inspection requested via web by Ryan Steinwand
|
CHANGE STATUS TO (ISS) | | | 10/18/2017 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 10/18/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/3/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 9/19/2017 | 9/19/2017 | 10/3/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/20/2017 | | 10/3/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Street Lights | 9/20/2017 | | 10/3/2017 | | PASS |
Tom Marshall
|
|
|
per E plan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/3/2017 | | DONE |
|
|
|
DO NOT RE ISSUE PLAN MOD
|
Routing PW Sewer Design | 9/20/2017 | | 10/2/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
No changes to public sewer connection.
|
Routing - FIRE | 9/20/2017 | 9/20/2017 | 9/25/2017 | | PASS |
Scott Arellano
|
|
|
No change from previous condition of approval.
|
Routing PW Environmental | 9/20/2017 | | 9/25/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - Design Review | 9/21/2017 | | 9/21/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Solid Waste | 9/20/2017 | | 9/20/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 9/20/2017 | | 9/20/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 9/20/2017 | | 9/20/2017 | | PASS |
Cody Riddle
|
|
|
|
Routing - Design Review | 9/20/2017 | | 9/20/2017 | | FAIL |
Andrea Tuning
|
|
|
There are two different site plans within the building permit package. This needs to be modified so there is only one.
The plans were also redlined to require slats within the perimter fencing to comply with the approved DR.
|
Routing - PUBLIC WORKS | 9/20/2017 | | 9/20/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan Modification Accepted | | | 9/19/2017 | | |
Christina Prado
|
|
|
Plan Mod accepted to move container/tent closer to the existing office building
|
BLD-Footing | 9/13/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Steinwand
|
BLD-Conference | 9/1/2017 | 9/5/2017 | 9/5/2017 | A | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 8/31/2017 | 9/1/2017 | 9/1/2017 | A | DEFR |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/31/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/31/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/24/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 6/9/2017 | 6/9/2017 | 8/24/2017 | | PASS |
Carl D Madsen
|
|
|
1st Comp. 7/9 Cascade Enterprises
|
Routing Off Site - STRUCTURAL | 8/22/2017 | | 8/24/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/22/2017 | | 8/24/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/24/2017 | | DONE |
Christina Prado
|
|
|
NEED:
ACHD-MET see docs
GC - MET
Rev cert of val - MET
RP - MET
|
Routing - PLAN CHECK | 8/3/2017 | | 8/12/2017 | | FAIL |
Carl D Madsen
|
|
|
Failed pending structural
|
Routing Off Site - STRUCTURAL | 8/3/2017 | | 8/12/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/11/2017 | | 7/25/2017 | | FAIL |
Carl D Madsen
|
|
|
Failed pending structural
|
Routing Off Site - STRUCTURAL | 7/11/2017 | | 7/25/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 7/12/2017 | | 7/25/2017 | | PASS |
Brian Murphy
|
|
|
bioretention no pw inspection p and z will inspect
|
Routing - PUBLIC WORKS | 7/11/2017 | | 7/12/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 7/11/2017 | | 7/12/2017 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 6/24/2017 | 6/27/2017 | 7/4/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 6/24/2017 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 6/9/2017 | | 6/24/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 6/9/2017 | | 6/19/2017 | | FAIL |
Brian Murphy
|
|
|
NEED ORG. APDX J 2
REPORTS FOR DRAINAGE AND O AND M
|
Routing PW Solid Waste | 6/9/2017 | | 6/15/2017 | | PASS |
|
|
|
No changes to solid waste.
|
Routing PW Environmental | 6/9/2017 | | 6/13/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 6/9/2017 | 6/9/2017 | 6/12/2017 | | PASS |
Katie Marron
|
|
|
No comments attached. A fire extinguisher will be required for this structure.
|
Routing PW Sewer Design | 6/9/2017 | | 6/12/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
No work proposed to public sewer connection.
|
Routing - Erosion and Sediment | 6/9/2017 | | 6/12/2017 | | PASS |
Melissa Jannusch
|
|
|
Plan approved. RP TBD.
|
Intake Approval | | | 6/9/2017 | | PASS |
|
|
|
|
Routing - Design Review | 6/9/2017 | | 6/9/2017 | | FAIL |
Andrea Tuning
|
|
|
If the applicant is proposing to install any parking space (accessible parking space) outside of the paved parking area, the new parking space and drive aisle and back up space is required to be paved or concrete.
|
Routing PW Street Lights | 6/9/2017 | | 6/9/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING | 6/9/2017 | | 6/9/2017 | | PASS |
Cody Riddle
|
|
|
Approved by DR.
|
Routing - PLANNING Land Div | 6/9/2017 | | 6/9/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 6/9/2017 | | 6/9/2017 | | PASS |
Laura Hunter
|
|
|
Should look into doing a record of survey and consolidate parcels
|
Routing - PUBLIC WORKS | 6/9/2017 | | 6/9/2017 | | PASS |
Rachael Beierle
|
|
|
NO NEW PLM PERMITTED
|
Intake Approval | | | 6/1/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following, incomplete prescreen submittals will not be accepted:
• Please provide a filled out 502 applications as previously requested which was uploaded blank under file name “502CHECKLIST”
• The Previous request to separate the drawings was done but the sheets came back on 17” x 11” sheets which are required to be on a minimum 18” x 24” sheet as previously stated see below. Please provide the following (18 sheets) on a minimum 18” x 24” sheets G1.0, G1.1, B4.3, B4.2, B4.1, B7.4, B7.3, B3.1, B2.1, B1.1, B7.2, B7.1, B6.1, B5.5, B5.4, B5.3, B5.2, B5.1
(file labeled “17107 Cascade Enterprises - Stamped Drawings.pdf” was not uploaded as individual sheets on 18” x 24” minimum sheets. This drawing file was uploaded as a packet with 18 sheets and on 17” x 11” sheets, please separate and upload as individual drawing on a minimum 18” x 24” sheet with file names that include the first characters of the discipline name, followed by the sheet number and name. Per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf)
|
Intake Approval | | | 5/18/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following, incomplete prescreen submittals will not be accepted:
• A filled out 502 applications which was uploaded blank
• The uploaded 502 checklist came back missing page 2, page 4 and page 6
• Previous request to separate the drawing file labeled “17107 Cascade Enterprises - Stamped Drawings.pdf” was not uploaded as individual sheets on 18” x 24” minimum sheets. This drawing file was uploaded as a packet with 18 sheets and on 17” x 11” sheets, please separate and upload as individual drawing on a minimum 18” x 24” sheet with file names that include the first characters of the discipline name, followed by the sheet number and name. Per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf
• Please provide any missing circled items from the checklist that was given to the building owners when they met with Carl Madsen at the front counter, the checklist showed exactly each item needed to proceed, if an item from the checklist was not required from a department discipline such as grading or ESC, etc.. please upload an email discussion from the department discipline that states nothing is required otherwise please upload the following
o Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff
o Site Drainage Report stamped and signed by an Idaho licensed design professional including descriptive narrative and calculations
o Drainage System Operation & Maintenance Plan stamped and signed by Idaho licensed design professional
o Erosion & Sediment Control (ESC) Narrative. Narrative must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
o ESC plans. Plans must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
o Site Grading & Drainage Plans stamped and signed by an Idaho licensed design professional
o Any other item from the missing pages of the 502 checklist
|
Intake Approval | | | 5/2/2017 | | FAIL |
|
|
|
Please provide and upload the following:
• It has been determined that the proposed structure requires a #502 Checklist, please fill out the #502 checklist and provide/upload any items that checklist requires.
• Please provide and upload a #502 application
• The file labeled “17107 Cascade Enterprises - Stamped Drawings.pdf” was uploaded as a packet with 18 sheets, please separate and upload as individual Drawing on a minimum 18” x 24” sheet with file names that include the first characters of the discipline name, followed by the sheet number and name. Per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf
|
Application received | | | 4/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 17 2017 9:33AM
|