(CASCADE ENTERPRISES) ""MODIFICATION TO MOVE THE BUILDING CLOSER TO THE FRONT OF THE PARCEL"" For the construction of a new membrane structure for the storage of equipment with work to include general site work and the placement of the structure per the approved plans and the attached engineering. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/22/20182/21/2018 DONE
This permit finaled on the web by Ryan Steinwand
First Notice1/22/20181/22/20182/12/2018 DONE
DetailsMike Jordan
Mailed 2-13-18
BLD-Final1/19/20181/22/20181/22/2018PPASS
DetailsMike Jordan
Joseph- ###-####=please call 20 minutes prior to meet
DOC - Permit Finaled1/22/20181/22/20181/22/2018PPASS
DetailsMike Jordan
Reviewed special inspection reports ok. Noted allrequired signs opffs completed. Certificate of completion was issued.
Zoning Approval1/19/20181/19/20181/19/2018 DONE
DetailsAndrea Tuning
FIRE-Final Inspection1/9/20181/10/20181/10/2018PPASS
DetailsTroy Cobbley
Life safety passed

Phone #: ###-#### Inspection requested via web by Ryan Steinwand
BLD-Final1/8/20181/9/20181/9/2018ANR
DetailsMike Jordan
Damian Phone #: ###-####. fire/life/safety has failed.
FIRE-Final Inspection1/8/20181/9/20181/9/2018AFAIL
DetailsTroy Cobbley
Provide a tagged fire extinguisher as discussed and a racking permit for the storage rack within the building.

Phone #: ###-#### Inspection requested via web by Ryan Steinwand
CHANGE STATUS TO (ISS)  10/18/2017 DONE
DetailsChristina Prado
(F) Reprint permit  10/18/2017 DONE
OVERRIDE  10/3/2017  
Plan assigned to (CDM)9/19/20179/19/201710/3/2017 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK9/20/2017 10/3/2017 PASS
DetailsCarl D Madsen
Routing PW Street Lights9/20/2017 10/3/2017 PASS
DetailsTom Marshall
per E plan
PLANS/APPL TAKEN TO FRONT DESK  10/3/2017 DONE
Permit Ready to Issue  10/3/2017 DONE
DO NOT RE ISSUE PLAN MOD
Routing PW Sewer Design9/20/2017 10/2/2017 PASS
DetailsKyle S. Rosenmeyer
No changes to public sewer connection.
Routing - FIRE9/20/20179/20/20179/25/2017 PASS
DetailsScott Arellano
No change from previous condition of approval.
Routing PW Environmental9/20/2017 9/25/2017 PASS
DetailsRick Christenson
Routing - Design Review9/21/2017 9/21/2017 PASS
DetailsAndrea Tuning
Routing PW Solid Waste9/20/2017 9/20/2017 PASS
DetailsEvan Carpenter
Routing PW Drainage9/20/2017 9/20/2017 PASS
DetailsBrian Murphy
Routing - PLANNING9/20/2017 9/20/2017 PASS
DetailsCody Riddle
Routing - Design Review9/20/2017 9/20/2017 FAIL
DetailsAndrea Tuning
There are two different site plans within the building permit package. This needs to be modified so there is only one.

The plans were also redlined to require slats within the perimter fencing to comply with the approved DR.
Routing - PUBLIC WORKS9/20/2017 9/20/2017 PASS
DetailsRachael Beierle
Plan Modification Accepted  9/19/2017  
DetailsChristina Prado
Plan Mod accepted to move container/tent closer to the existing office building
BLD-Footing9/13/20179/14/20179/14/2017PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Ryan Steinwand
BLD-Conference9/1/20179/5/20179/5/2017ADONE
DetailsMike Jordan
BLD-Conference8/31/20179/1/20179/1/2017ADEFR
DetailsBrandon Shaw
Ryan Phone #: ###-####
Issue PAID IN FULL permit  8/31/2017 DONE
Print Occupancy Form  8/31/2017 DONE
OVERRIDE  8/24/2017  
Plan assigned to (CDM)6/9/20176/9/20178/24/2017 PASS
DetailsCarl D Madsen
1st Comp. 7/9 Cascade Enterprises
Routing Off Site - STRUCTURAL8/22/2017 8/24/2017 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK8/22/2017 8/24/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  8/24/2017 DONE
Permit Ready to Issue  8/24/2017 DONE
DetailsChristina Prado
NEED:
ACHD-MET see docs
GC - MET
Rev cert of val - MET
RP - MET
Routing - PLAN CHECK8/3/2017 8/12/2017 FAIL
DetailsCarl D Madsen
Failed pending structural
Routing Off Site - STRUCTURAL8/3/2017 8/12/2017 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK7/11/2017 7/25/2017 FAIL
DetailsCarl D Madsen
Failed pending structural
Routing Off Site - STRUCTURAL7/11/2017 7/25/2017 FAIL
DetailsCarl D Madsen
Routing PW Drainage7/12/2017 7/25/2017 PASS
DetailsBrian Murphy
bioretention no pw inspection p and z will inspect
Routing - PUBLIC WORKS7/11/2017 7/12/2017 PASS
DetailsRachael Beierle
Routing - Design Review7/11/2017 7/12/2017 PASS
DetailsAndrea Tuning
Route to Impact Fee Review6/24/20176/27/20177/4/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  6/24/2017 FAIL
Routing - PLAN CHECK6/9/2017 6/24/2017 FAIL
DetailsCarl D Madsen
Routing PW Drainage6/9/2017 6/19/2017 FAIL
DetailsBrian Murphy
NEED ORG. APDX J 2
REPORTS FOR DRAINAGE AND O AND M
Routing PW Solid Waste6/9/2017 6/15/2017 PASS
Details
No changes to solid waste.
Routing PW Environmental6/9/2017 6/13/2017 PASS
DetailsRick Christenson
Routing - FIRE6/9/20176/9/20176/12/2017 PASS
DetailsKatie Marron
No comments attached. A fire extinguisher will be required for this structure.
Routing PW Sewer Design6/9/2017 6/12/2017 PASS
DetailsKyle S. Rosenmeyer
No work proposed to public sewer connection.
Routing - Erosion and Sediment6/9/2017 6/12/2017 PASS
DetailsMelissa Jannusch
Plan approved. RP TBD.
Intake Approval  6/9/2017 PASS
Routing - Design Review6/9/2017 6/9/2017 FAIL
DetailsAndrea Tuning
If the applicant is proposing to install any parking space (accessible parking space) outside of the paved parking area, the new parking space and drive aisle and back up space is required to be paved or concrete.
Routing PW Street Lights6/9/2017 6/9/2017 PASS
DetailsTom Marshall
Routing - PLANNING6/9/2017 6/9/2017 PASS
DetailsCody Riddle
Approved by DR.
Routing - PLANNING Land Div6/9/2017 6/9/2017 PASS
DetailsTodd Tucker
Routing - Addressing6/9/2017 6/9/2017 PASS
DetailsLaura Hunter
Should look into doing a record of survey and consolidate parcels
Routing - PUBLIC WORKS6/9/2017 6/9/2017 PASS
DetailsRachael Beierle
NO NEW PLM PERMITTED
Intake Approval  6/1/2017 FAIL
DetailsJavier Guzman
Please provide and upload the following, incomplete prescreen submittals will not be accepted:
• Please provide a filled out 502 applications as previously requested which was uploaded blank under file name “502CHECKLIST”
• The Previous request to separate the drawings was done but the sheets came back on 17” x 11” sheets which are required to be on a minimum 18” x 24” sheet as previously stated see below. Please provide the following (18 sheets) on a minimum 18” x 24” sheets G1.0, G1.1, B4.3, B4.2, B4.1, B7.4, B7.3, B3.1, B2.1, B1.1, B7.2, B7.1, B6.1, B5.5, B5.4, B5.3, B5.2, B5.1

(file labeled “17107 Cascade Enterprises - Stamped Drawings.pdf” was not uploaded as individual sheets on 18” x 24” minimum sheets. This drawing file was uploaded as a packet with 18 sheets and on 17” x 11” sheets, please separate and upload as individual drawing on a minimum 18” x 24” sheet with file names that include the first characters of the discipline name, followed by the sheet number and name. Per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf)
Intake Approval  5/18/2017 FAIL
DetailsJavier Guzman
Please provide and upload the following, incomplete prescreen submittals will not be accepted:
• A filled out 502 applications which was uploaded blank
• The uploaded 502 checklist came back missing page 2, page 4 and page 6
• Previous request to separate the drawing file labeled “17107 Cascade Enterprises - Stamped Drawings.pdf” was not uploaded as individual sheets on 18” x 24” minimum sheets. This drawing file was uploaded as a packet with 18 sheets and on 17” x 11” sheets, please separate and upload as individual drawing on a minimum 18” x 24” sheet with file names that include the first characters of the discipline name, followed by the sheet number and name. Per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf
• Please provide any missing circled items from the checklist that was given to the building owners when they met with Carl Madsen at the front counter, the checklist showed exactly each item needed to proceed, if an item from the checklist was not required from a department discipline such as grading or ESC, etc.. please upload an email discussion from the department discipline that states nothing is required otherwise please upload the following
o Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff
o Site Drainage Report stamped and signed by an Idaho licensed design professional including descriptive narrative and calculations
o Drainage System Operation & Maintenance Plan stamped and signed by Idaho licensed design professional
o Erosion & Sediment Control (ESC) Narrative. Narrative must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
o ESC plans. Plans must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
o Site Grading & Drainage Plans stamped and signed by an Idaho licensed design professional
o Any other item from the missing pages of the 502 checklist
Intake Approval  5/2/2017 FAIL
Details
Please provide and upload the following:
• It has been determined that the proposed structure requires a #502 Checklist, please fill out the #502 checklist and provide/upload any items that checklist requires.
• Please provide and upload a #502 application
• The file labeled “17107 Cascade Enterprises - Stamped Drawings.pdf” was uploaded as a packet with 18 sheets, please separate and upload as individual Drawing on a minimum 18” x 24” sheet with file names that include the first characters of the discipline name, followed by the sheet number and name. Per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf
Application received  4/17/2017 DONE
Application submitted via PDS Online on Apr 17 2017 9:33AM