Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-01080
StatusFinaled
Name ESI
Site Address 850 W FRONT ST
Project NameBoise Centre - Office area
Customer Number 
ePlanReviewYes
Description
**Project Mangement- Ron Hill** (BOISE CENTRE CONVENTION CENTER – OFFICE REMODEL – SOUTHWEST CORNER) The fire sprinkler system is used for fire area. To remodel a 2,751 square foot office area located in the Southwest corner of the convention center. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, and finishes. The existing toilet rooms that serve the office area are required to be maintained accessible to the disabled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 11/18/201712/12/2017 DONE
BLD-Final11/7/201711/8/201711/8/2017APASS
DetailsDave Hannah
Adam Phone #: ###-####
Permanent Occupancy  11/8/2017 DONE
DetailsChristina Prado
Print Occupancy Form  10/30/2017 DONE
DetailsChristina Prado
BLD-Final9/5/20179/5/20179/6/2017PPART
DetailsDave Hannah
cORY Phone #: ###-#### ok for temp occ needs to change lock on conf room door
FIRE-Final Inspection9/5/20179/5/20179/5/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection for area of work passed/complete.
BLD-Ceiling Grid Inspection8/28/20178/29/20178/30/2017PPASS
DetailsDave Hannah
PM Inspection walk with Jake Wilson, ###-####. Call when heading to site. Thanks akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in8/1/20178/2/20178/2/2017PPASS
DetailsDave Hannah
Jake Phone #: ###-####
Issue PAID IN FULL permit  8/1/2017 DONE
Print Occupancy Form  8/1/2017 DONE
Plan assigned to (CJW)4/19/20174/19/20175/18/2017 PASS
DetailsCarl Westfall
(1st done) (Apr 27 - 7 days) (12 sheets) Boise Centre Convention Center
Routing - PLAN CHECK5/17/2017 5/18/2017 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  5/18/2017 DONE
Permit Ready to Issue  5/18/2017 DONE
DetailsChristina Prado
***met can 7-31-17***Need GC form & Revised Cert of Value for issuance
Route to Impact Fee Review5/16/20175/19/20175/17/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
Plan resubmittals received  5/17/2017 DONE
1st review completed  5/16/2017 DONE
Plan resubmittals requested  5/16/2017 DONE
Routing - PLAN CHECK4/19/2017 5/16/2017 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - MECHANICAL4/19/2017 4/26/2017 PASS
DetailsTroy James
Routing - FIRE4/19/20174/19/20174/25/2017 PASS
DetailsKatie Marron
No comments required.
Intake Approval  4/19/2017 PASS
DetailsJavier Guzman
Routing - Addressing4/19/2017 4/19/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS4/19/2017 4/19/2017 PASS
DetailsRachael Beierle
Application received  4/18/2017 DONE
Application submitted via PDS Online on Apr 18 2017 9:52AM
Intake Approval  4/18/2017 FAIL
DetailsJulie Romig
1. Page 5 in submittal checklist (missing from uploaded document).
2. Update Interior Lighting Compliance Certificate with 2012 IECC instead of 2009.