Telephone call | | | 8/6/2019 | | DONE |
|
|
|
called-transfered to Michelle-asked about when we could expect payment-she asked me to email her the fees due and she'll check into it
|
Print Statement | | | 8/6/2019 | | DONE |
|
|
|
Michelle and Robins Morton asked me to email her the statement
|
Print Statement | | | 7/25/2019 | | DONE |
|
|
|
sent 3rd late notice
|
Print Statement | | | 6/18/2019 | | DONE |
|
|
|
sent 2nd late notice
|
Print Statement | | | 4/19/2019 | | DONE |
|
|
|
sent 1st late notice
|
Print Statement | | | 2/1/2019 | | DONE |
|
|
|
correct updated values
|
Telephone call | | | 1/23/2019 | | DONE |
|
|
|
Spoke with Justin Free. Justin stated the plumbing inspector said he would split out the plm permit from phase one (bld17-00359) so that is showed work done on phase two (bld17-01088). in formed justin that our inspections are unable to do that and their plumbing company would need to pull a second permit. as of now it looks like no plumbing permit/work was done for phase two
|
Print Statement | | | 1/17/2019 | | DONE |
|
|
|
|
Second Notice | | 12/24/2018 | 1/8/2019 | | DONE |
|
|
|
mailed 1-11-19
|
First Notice | | 11/11/2018 | 12/14/2018 | | DONE |
|
|
|
mailed 12-17
|
Permanent Occupancy | | | 11/1/2018 | | DONE |
|
|
|
|
BLD-Final | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
Charles Phone #: ###-####
|
Zoning Approval | 10/3/2018 | 10/3/2018 | 10/3/2018 | | PASS |
Katelyn Menuge
|
|
|
|
PubWorks Occupancy Approval | 8/31/2018 | 8/31/2018 | 8/31/2018 | | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Occupancy Approval | 8/31/2018 | 8/31/2018 | 8/31/2018 | | DONE |
Tiffany Lowery
|
|
|
Received engineer letter and release letter from Owner of Treasure Valley Hospital.
|
FIRE-Final Inspection | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the project related fire alarm permit is finaled.
Barry Phone #: ###-####
|
BLD-Final | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PEND |
Mike Jordan
|
|
|
Phase 3 will be ok as soon as fire/life/safety has signed off.
|
BLD-Final | 7/20/2018 | 7/23/2018 | 7/20/2018 | A | CANC |
Mike Jordan
|
|
|
Barry Phone #: ###-####
|
FIRE-Final Inspection | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need project related fire alarm permit finaled and an exit sign added in new corridor.
Barry Phone #: ###-####
|
BLD-Conference | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | CANC |
Mike Jordan
|
|
|
Barry Phone #: ###-####
|
Print Occupancy Form | | | 7/20/2018 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. phase 3 above ceiling and ceiling grid ok.
|
BLD-Ceiling Grid Inspection | 7/10/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Mike Jordan
|
|
|
Barry Phone #: ###-####. Break room, equipment room and sub sterile passage coridor ok.
|
BLD-Ceiling Grid Inspection | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Ceiling grid and fire stopping above grid at mens and womens loker rooms, new phamacy rooms and two closets next to pharmacy.
|
BLD-Framing/Rough-in | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Mike Jordan
|
|
|
Barry Phone #: ###-####. fire proofing has been patched on tube steel columns. !hr. assembly above grid complete. Aslo inspected shaft board liner on interior side of 1hr. wall in anesthesia work room.
|
BLD-Framing/Rough-in | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PART |
Mike Jordan
|
|
|
Berry Phone #: ###-####. Interior steel stud framed walls for new pre op bed aditions. Needs to hand patch fire proofing back on tube stell columns and complete 1hr. fire wall envelope aboce grid.
|
BLD-Framing/Rough-in | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Mike Jordan
|
|
|
Max Phone #: ###-####. Prerock on 1hr. wall at anesthesia work room behind bump out wall on patient side.
|
BLD-Framing/Rough-in | 5/18/2018 | 5/21/2018 | 5/21/2018 | A | PART |
Mike Jordan
|
|
|
Barry Phone #: ###-####. Inteior steel stud framed walls for anesthesia work room.
|
BLD-Framing/Rough-in | 5/9/2018 | 5/9/2018 | 5/10/2018 | P | CANC |
Mike Jordan
|
|
|
Barry Phone #: ###-####
|
BLD-Framing/Rough-in | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PASS |
Mike Jordan
|
|
|
Barry Phone #: ###-####. INterior steel stud framed walls for pharmacy, breakroom, New O.R. and substerilr rooms ok.
|
BLD-Final | 4/17/2018 | 4/18/2018 | 4/18/2018 | P | PART |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Vending room 118 only ok to occupy..
|
FIRE-Final Inspection | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PART |
Troy Cobbley
|
|
|
Vending Room 118 life safety is passed. Will need an additional notification device before project final due to the office being utilized by more than one person.
Charles Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/13/2018 | 4/16/2018 | 4/16/2018 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Room #119.
|
BLD-Final | 4/2/2018 | 4/2/2018 | 4/3/2018 | P | PART |
Mike Jordan
|
|
|
Barry Phone #: ###-####. Purchasing room 119 only ok to occupy.
|
BLD-Ceiling Grid Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####
|
BLD-Final | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PART |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Ok to occupy new addition. Verified all trades.
|
FIRE-Final Inspection | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PART |
Troy Cobbley
|
|
|
Life safety for Passage 115 will be passed when ceiling tile has been installed.
Charles Phone #: ###-####
|
FIRE-Final Inspection | 3/12/2018 | 3/13/2018 | 3/13/2018 | A | PART |
Troy Cobbley
|
|
|
Life safety in new addition passed. Passage 115 was not complete yet.
Charles Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | PART |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Addition portion.
|
BLD-Framing/Rough-in | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Mike Jordan
|
|
|
Blow patches on existing exterior wall at passage #115 behind furred wall.
|
BLD-Framing/Rough-in | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | NR |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Moved to pm. inspection.
|
BLD-Framing/Rough-in | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. interior steel stud framed walls at rooms 117,118,119, 146 and 147. Furred walls on passage 115.
|
BLD-Energy code compliance | 1/3/2018 | 1/4/2018 | 1/4/2018 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-#### Remainder of framing in addition ok.
|
BLD-Final | 12/13/2017 | 12/13/2017 | 12/13/2017 | P | CANC |
Mike Jordan
|
|
|
Charles Phone #: ###-####
|
BLD-Final | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | PART |
Mike Jordan
|
|
|
Ok to occupy M.O.B building south of gridline N6.5 and corridor149 and 156 ( link from existing hospital to M.O.B.) only.
|
FIRE-Final Inspection | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | PART |
Troy Cobbley
|
|
|
Life safety for the MOB portion of the project is passed. The connecting corridor from the new MOB to the existing hospital is ok on life safety as well.
Charles Phone #: ###-####
|
BLD-Final | 12/7/2017 | 12/12/2017 | 12/12/2017 | P | CANC |
Mike Jordan
|
|
|
Charles Phone #: ###-####
|
FIRE-Final Inspection | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | FAIL |
Troy Cobbley
|
|
|
Life safety in the MOB tenant improvement will be ok to pass when the sprinkler system in the connecting corridor between the MOB and the existing hospitol has been activated..
|
BLD-Ceiling Grid Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PART |
Mike Jordan
|
|
|
Charles-above ceiling Phone #: ###-####. Corridor only between existing hospital and new cafeteria. Needs to complete fire stopping at #hr. wall and 1hr. wall above grid.
|
BLD-Ceiling Grid Inspection | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Ceiling grid at main corridor between b occupancy and 3hr. fire wall ok. Also did courtesey walk through on B occupancy portion of building.
|
BLD-Final | 11/22/2017 | 11/27/2017 | 11/27/2017 | A | PART |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Ok to occupy rooms 111 and 112 only next to pharmacy. Verified all other trades sign offs.
|
FIRE-Final Inspection | 11/22/2017 | 11/27/2017 | 11/27/2017 | A | PART |
Troy Cobbley
|
|
|
Life safety is passed in the two new Pharmacy Rooms in the existing hospital area. Fire alarm and fire sprinkler work is complete.
Charles Phone #: ###-####
|
FIRE-Final Inspection | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for the Pharmacy Room. Life safety will be ok in this room when the fier alarm devices have been tested.
Charles Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/14/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. All grid south of corridor 198 in the B occupancy portion of building.
|
BLD-Framing/Rough-in | 11/14/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Interior steel stud framed walls at rooms 151/150/152/148 and corridors 149 and 156.
|
BLD-Energy code compliance | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Mike Jordan
|
|
|
East and south walls of new building ok.
|
BLD-Energy code compliance | 11/7/2017 | 11/8/2017 | 11/8/2017 | A | NR |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Inspection moved to today in the pm.
|
BLD-Framing/Rough-in | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Soffit framing in new dinning room. Interior steel stud framed walls fro new cooridor from ramp at new dinning room to existing dinning room.
|
BLD-Framing/Rough-in | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Interior steel stud framed wals in east/west corridor, 3hr. fire wall and soffit in new cafetria. Noted will need engineering showing that bottom chord of roof trusses will support new soffit.
|
BLD-Framing/Rough-in | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | CANC |
Mike Jordan
|
|
|
Completed inspection in the a.m.
|
BLD-Framing/Rough-in | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Exterkior curtain walls ok
|
BLD-Final | 10/5/2017 | 10/6/2017 | 10/6/2017 | P | PART |
Mike Jordan
|
|
|
late as possible // Charles Miller Phone #: ###-####. Ok to occupy O.R. #141 only. Noted all other trades signed off.
|
FIRE-Final Inspection | 10/5/2017 | 10/6/2017 | 10/5/2017 | P | PART |
Troy Cobbley
|
|
|
O.R. 141 life safety is passed. Sprinkler and alarm work is complete
Charles Miller Phone #: ###-####
|
FIRE-Final Inspection | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | CANC |
Troy Cobbley
|
|
|
Charlies Phone #: ###-#### cancel per Cindy with The Robins & Morton Group
|
BLD-Final | 10/4/2017 | 10/5/2017 | 10/5/2017 | P | CANC |
Mike Jordan
|
|
|
Charlies Phone #: ###-#### cancel per Cindy with The Robins & Morton Group
|
BLD-Framing/Rough-in | 9/22/2017 | 9/25/2017 | 9/25/2017 | A | PASS |
Jim Storey
|
|
|
Charlies Phone #: ###-#### noted on plan set sheer wall/ hard ceilling/ two locations
|
BLD-Framing/Rough-in | 9/19/2017 | 9/20/2017 | 9/20/2017 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Interior steel stud framed walls , remainderof framing west of engineering room and south of corridor.
|
BLD-Framing/Rough-in | 9/8/2017 | 9/11/2017 | 9/12/2017 | A | PART |
Dave Hannah
|
|
|
Charles Phone #: ###-#### fire caulking inter shaft wall ok to cover ext
|
BLD-Ceiling Grid Inspection | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Hardlid ok in OR 141.
|
BLD-Framing/Rough-in | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Interior stel stud framed walls for hood room and anti room. OR #141 and corridor at sterile passage#126. Corridor wallsat corridor 199, and all walls to the east of corridor 199.Also purchaseing office 215 and office 214. All areas marked on approved plans.
|
OVERRIDE | | | 8/14/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 5/9/2017 | 5/9/2017 | 8/14/2017 | | PASS |
Carl Westfall
|
|
|
(2nd done) (May 26 - 15 days) (188 sheets) Treasure valley TI
|
Issue PAID IN FULL permit | | | 8/14/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/11/2017 | | 8/14/2017 | | PASS |
Carl Westfall
|
|
|
Drawings approved after the revisions were reviewed. No need to route the drawings to any other agency.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/14/2017 | | DONE |
|
|
|
Permit has never been issued
|
Routing - FIRE | 8/7/2017 | 8/7/2017 | 8/11/2017 | | PASS |
Scott Arellano
|
|
|
Attached revised comments to plans.
|
Plan resubmittals requested | | | 8/11/2017 | | DONE |
|
|
|
The Architect wanted to upload drawings after making the changes that were redlined on the drawings. Even though all agencies had approved the drawings, I complied with the Architect's desire and sent the workflow back to her.
|
Plan resubmittals received | | | 8/11/2017 | | DONE |
|
|
|
|
Routing - PLUMBING | 8/8/2017 | | 8/9/2017 | | PASS |
Bill VanDegrift
|
|
|
Please transfer your notes to the most recent version
per plan and ISPC.
|
Routing - MECHANICAL | 8/8/2017 | | 8/9/2017 | | PASS |
Troy James
|
|
|
Please transfer your notes to the most recent version.
|
Routing - PLAN CHECK | 8/3/2017 | | 8/8/2017 | | PASS |
Carl Westfall
|
|
|
Routing for the 2nd review was delayed because the assigned Plans Examiner was gone on vacation and because ePlanReview was not available because of an upgrade when he came back. He was gone on Aug 2, 3, and 4 (Wed, Thurs, Fri) but was back on Aug. 5 (Saturday). He could have routed the drawings on Saturday had ePlanReview been available.
|
Plan resubmittals received | | | 8/3/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 7/21/2017 | 7/24/2017 | 8/1/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/21/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/21/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/9/2017 | | 7/21/2017 | | FAIL |
Carl Westfall
|
|
|
1st review completed
|
Routing Off Site - C.D.H | 5/9/2017 | | 7/17/2017 | | PASS |
Carl Westfall
|
|
|
(7-17-17) Talked to Natasha Ferney on the phone. She said that just today she received what she needs to complete her review. She completed it later the same day.
|
Routing - PLANNING Land Div | 5/9/2017 | | 5/12/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - MECHANICAL | 5/9/2017 | | 5/12/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 5/9/2017 | | 5/12/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 5/9/2017 | 5/9/2017 | 5/11/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - PLUMBING | 5/9/2017 | | 5/11/2017 | | PASS |
Bill VanDegrift
|
|
|
Per plans and ISPC
|
Routing PW Solid Waste | 5/9/2017 | | 5/10/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing - Erosion and Sediment | 5/9/2017 | | 5/10/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Need to designate Responsible Person. Site preparation inspeciton is required.
|
Intake Approval | | | 5/9/2017 | | PASS |
|
|
|
|
Routing - Addressing | 5/9/2017 | | 5/9/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/9/2017 | | 5/9/2017 | | PASS |
Rachael Beierle
|
|
|
SWR17-00226 IS ATTACHED TO 1ST PHASE.
|
Routing PW Drainage | 5/9/2017 | | 5/9/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 5/9/2017 | | 5/9/2017 | | PASS |
Cody Riddle
|
|
|
No review required. Approved by DRH16-00514.
|
Routing - Design Review | 5/9/2017 | | 5/9/2017 | | PASS |
Katelyn Menuge
|
|
|
per DRH16-00514 and BLD17-00359
|
Routing - PLANNING | 5/9/2017 | | 5/9/2017 | | PASS |
Celine Acord
|
|
|
per approval of CUP16-00094 (and BLD17-00359)
|
Intake Approval | | | 4/25/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide the following items, Incomplete submittals will not be accepted. Applicants with incomplete submittals must upload additional documents:
• Please provide a filled out #502 checklist as this is a new addition to the existing building and does not fall under the #520 checklist that was uploaded. The #502 checklist can be found at http://pds.cityofboise.org/media/43820/502-new-commercial-building-additions-submittal-checklist_7-5-16.pdf
• Please provide Structural calculations stamped and signed by an Idaho licensed engineer.
• Please provide a Soils and geotech report for support of the structure stamped and signed by an Idaho licensed engineer or declare on plans the default seismic site class & soil bearing per IBC
• Please provide a Soils and geotech report for infiltration systems stamped and signed by an Idaho licensed civil engineer, geologist, or soil scientist
• Please provide a Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff found at our website at https://pds.cityofboise.org/media/134120/211_verificationlegallot_application.pdf
• The new plan sheets show a kitchen please provide completed Food Establishment License application and Food Establishment Plan Review and Approval form for any building where food is prepared, manufactured or stored. Forms are available at: www.cdhd.idaho.gov/EH/food/forms.htm.
• Please provide Form #310 – Statement of Special Inspections must be completed by the design engineer. Form can be found at our web site at http://pds.cityofboise.org/media/104147/final310_special_inspections.pdf
• Please provide if any Shallow Injection Well Inventory form Drainage plans with seepage beds must submit a “Shallow Injection Well Inventory” form from the Idaho Department of Water Resources available at: http://www.idwr.idaho.gov/wells/shallow-injection-wells.html
• Please provide Site Drainage Report stamped and signed by an Idaho licensed design professional including descriptive narrative and calculations
• Please provide a Drainage System Operation & Maintenance Plan stamped and signed by Idaho licensed design professional
• Please check off new checklist box for the required Permanent Operation & Maintenance Agreement form stating you have mailed in or dropped off the original signed and notarized document from the landowner to the Public Works Drainage Coordinator. Form can be found in Appendix J of the Boise City Stormwater Design Manual and at this link: http://publicworks.cityofboise.org/services/drainage-control/
• Please provide Site & Landscape Plans
• Please provide Erosion & Sediment Control, Grading/Drainage Plans
• Please provide structural plans stamped and signed by an Idaho licensed engineer to include design loads and material specifications, identify required special inspections, Foundation plans & details, wall framing & bracing details, Structural building sections, Floor framing plans & details and Roof framing plans & details.
• Please provide an Idaho licensed architects stamp/signature on EQ plan sheets
• Please provide any additional items I forgot to mention or missed from the #502 Checklist
|
Application received | | | 4/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 18 2017 1:13PM
|