Third Notice | | 2/17/2018 | 3/13/2018 | | DONE |
|
|
|
Mailed 3-14-18
|
Third Notice | | 1/16/2018 | 2/12/2018 | | DONE |
|
|
|
mailed 2-13-18
|
Second Notice | | 12/22/2017 | 1/11/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
First Notice | | 11/18/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
Print Occupancy Form | | | 11/8/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/8/2017 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Jim Sly
|
|
|
Jose Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 11/2/2017 | 11/3/2017 | 11/3/2017 | P | FAIL |
Dave Hannah
|
|
|
Jose Phone #: ###-#### c/n on site
|
FIRE-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Jose Phone #: ###-####
|
BLD-Final | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | NR |
Jim Sly
|
|
|
Jose Phone #: ###-#### Need Fire/Life.........
|
BLD-Energy code compliance | 10/5/2017 | 10/6/2017 | 10/6/2017 | P | PASS |
Jim Storey
|
|
|
Jose Phone #: ###-#### walls ok to cover
|
BLD-Framing/Rough-in | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PASS |
Jim Sly
|
|
|
Come early - Jose Phone #: ###-####
|
BLD-Framing/Rough-in | 10/4/2017 | 10/4/2017 | 10/5/2017 | P | NR |
Jim Sly
|
|
|
Jose Phone #: ###-#### Need approved plan
|
BLD-Framing/Rough-in | 9/26/2017 | 9/26/2017 | 9/26/2017 | P | PART |
Jim Sly
|
|
|
For windows // Jose Phone #: ###-#### Looked at new window openings. Called structural Engineer.....Kolby ###-####. He has observed and approved installation of Engineered steel window opening jambs.
|
CHANGE STATUS TO (ISS) | | | 9/26/2017 | | DONE |
|
|
|
Plan Mod
|
Plan assigned to (JG) | 8/29/2017 | 8/29/2017 | 9/7/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan Mod Auto Source ePlan
|
Routing - PLAN CHECK | 9/6/2017 | | 9/7/2017 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 9/7/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Routing - Design Review | 9/6/2017 | | 9/6/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00169
|
Routing - Design Review | 8/31/2017 | | 9/1/2017 | | FAIL |
Katelyn Menuge
|
|
|
Need building elevations for DR
|
Routing - PLAN CHECK | 8/31/2017 | | 9/1/2017 | | FAIL |
Javier Guzman
|
|
|
|
Plan Modification Accepted | | | 8/29/2017 | | DONE |
|
|
|
plan mod accepted in e plan-adding windows to exiwsting structure-submitting all sheets 1-11
|
Issue PAID IN FULL permit | | | 7/25/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/25/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 6/12/2017 | 6/12/2017 | 7/24/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 6/30 L3 Auto Source remodel ePlan
|
Routing - PLAN CHECK | 7/20/2017 | | 7/24/2017 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/24/2017 | | DONE |
Christina Prado
|
|
|
Applicant is Parcel Owner and will act as GC, Need form only CP 7/25 /// Need GC Form and Revised Cert of Value
|
Routing - MECHANICAL | 7/20/2017 | | 7/21/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 7/20/2017 | | 7/20/2017 | | PASS |
Celine Acord
|
|
|
|
Routing - Design Review | 7/20/2017 | | 7/20/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00169
|
Route to Impact Fee Review | 7/5/2017 | 7/8/2017 | 7/10/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/5/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 6/12/2017 | | 7/5/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Environmental | 6/12/2017 | | 6/23/2017 | | PASS |
Rick Christenson
|
|
|
On-site inspection.
|
Routing - Erosion and Sediment | 6/12/2017 | | 6/15/2017 | | PASS |
Andy J. Long
|
|
|
No ESC permit required
|
Routing - PLUMBING | 6/12/2017 | | 6/14/2017 | | PASS |
Bill VanDegrift
|
|
|
no review required
|
Routing - PLANNING | 6/12/2017 | | 6/14/2017 | | FAIL |
Celine Acord
|
|
|
changemarks required, contacted applicant to make aware 6/14/17
|
Routing - FIRE | 6/12/2017 | 6/12/2017 | 6/13/2017 | | PASS |
Katie Marron
|
|
|
No comments required. Basic Life Safety.
|
Routing - MECHANICAL | 6/12/2017 | | 6/13/2017 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 6/12/2017 | | 6/13/2017 | | FAIL |
Katelyn Menuge
|
|
|
Multiple Corrections to Site Plan Required
|
Plan Reviewer's activity | | | 6/12/2017 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 6/12/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl W approved pre screen
|
Routing - Addressing | 6/12/2017 | | 6/12/2017 | | PASS |
Laura Hunter
|
|
|
Corrected address to 1763 N Five Mile Rd
|
Routing - PUBLIC WORKS | 6/12/2017 | | 6/12/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 6/9/2017 | | FAIL |
|
|
|
(6-9-17) Please upload each drawings as a separate file. Please review the ePlanReview standards if you have questions. A complete plan intake review has not been done.
|
Application received | | | 4/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 18 2017 3:07PM
|