BLD-Final | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Dave Hannah
|
|
|
Please call ahead for access - Alex Phone #: ###-####
|
DOC - Permit Finaled | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 6/21/2017 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2017 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/2/2017 | 6/2/2017 | 6/8/2017 | | PASS |
Josh Bogle
|
|
|
remove bearing wall
|
1st review completed | | | 6/8/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/8/2017 | | 6/8/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/8/2017 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 6/2/2017 | 6/2/2017 | 6/6/2017 | | DEFR |
Brian McGowan
|
|
|
remove bearing wall
|
Plans ACCEPTED BY PLAN TECH | | | 6/2/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/2/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/2/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/30/2017 | | FAIL |
|
|
|
still need engineering for beam, also please re upload drawings individually and turn so they are facing the correct way, please make sure the bottom right corner is blank for our stamp
|
Intake Approval | | | 5/22/2017 | | FAIL |
|
|
|
need full floor plan, engineering for beam
|
Application received | | | 4/20/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 20 2017 12:44PM
|