BLD-Final | 1/9/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Dave Hannah
|
|
|
steve Phone #: ###-####
|
DOC - Permit Finaled | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/2/2017 | 8/2/2017 | 8/3/2017 | P | PASS |
Dave Hannah
|
|
|
Call 30 mins ahead -Steve Phone #: ###-####
|
Routing Walk-In (BLD) | 5/10/2017 | 5/10/2017 | 5/11/2017 | P | DONE |
Brian McGowan
|
|
|
Needed form 310. I have the plans in my office and am waiting for him to email me the form.
|
Plan assigned to (BJM) | 5/10/2017 | 5/10/2017 | 5/11/2017 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 5/11/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/11/2017 | | 5/11/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/11/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/11/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/11/2017 | | DONE |
|
|
|
|
Telephone call | | | 5/11/2017 | | DONE |
|
|
|
Left a message with Kim, for Joe, informing that this permit is ready and the fee amount due for issuance
|
Issue PAID IN FULL permit | | | 5/11/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PASS |
Jeff Lowe
|
|
|
repair replace no DR required per Sarah S.
|
Routing Walk-In (BLD) | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | FAIL |
David Ferguson
|
|
|
Need engineering for steel column design and verify existing footings to meet frost depth.
|
Application received | | 4/21/2017 | | | |
|
|
|
|