Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD17-01151
StatusIssued
Name STRINGFIELD JOANNE
Site Address 735 E JEFFERSON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
*** PLAN MODIFICATION - 5-22-17 - Revised footprint for proposed Garage to be built around existing deck. New proposed square footage to be 488 square feet. *** Permit to demo existing shed and build a new detached garage, 24x24 (576sq'). All work per plans, notes, handouts, existing code and ordinances. Seperate electrical & ESC permit needed. **JB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/7/201711/7/201711/8/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection11/8/201711/8/201711/8/2017 PEND
DetailsDave Hannah
BLD-Framing/Rough-in6/26/20176/26/20176/26/2017PPASS
DetailsDave Hannah
Jack Phone #: ###-####
BLD-Framing/Rough-in6/15/20176/15/20176/15/2017PPART
DetailsDave Hannah
Jack Phone #: ###-#### shear ok to cover ext
BLD-Framing/Rough-in6/14/20176/14/20176/15/2017PPART
DetailsDave Hannah
Jack Phone #: ###-#### ok to cover ext
BLD-Concrete5/24/20175/24/20175/25/2017PPASS
DetailsDave Hannah
Jack Phone #: ###-####
Routing Walk-In (Zoning)5/22/20175/22/20175/22/2017APASS
DetailsTed Vanegas
Routing Walk-In (BLD)5/22/20175/22/20175/22/2017ADONE
DetailsBrian McGowan
Routing - PLAN CHECK5/22/2017 5/22/2017 PASS
DetailsBrian McGowan
Case Summary (BLD)  5/22/2017 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  5/22/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  5/22/2017 DONE
DetailsBrian McGowan
CHANGE STATUS TO (ISS)  5/22/2017 DONE
(F) Reprint permit  5/22/2017 DONE
Routing Walk-In (Zoning)5/2/20175/2/20175/2/2017PDONE
DetailsSue Cummings
Routing Walk-In (BLD)5/2/20175/2/20175/2/2017PDONE
DetailsJosh Bogle
1st review completed  5/2/2017 DONE
DetailsJosh Bogle
Routing - PLAN CHECK5/2/2017 5/2/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  5/2/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  5/2/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/2/2017 DONE
DetailsJosh Bogle
Permit Ready to Issue  5/2/2017 DONE
Issue PAID IN FULL permit  5/2/2017 DONE
Routing Walk-In (Zoning)4/24/20174/24/20174/24/2017AFAIL
DetailsKatelyn Menuge
Appeal Period Ends 4-30-17. Will come back after Monday.
Routing Walk-In (BLD)4/24/20174/24/20174/24/2017AFAIL
DetailsBrian McGowan
Needed floor plan with notes, wall bracing, fire rated eave detail
1st review completed  4/24/2017 FAIL
DetailsBrian McGowan
Needed floor plan with notes, wall bracing, fire rated eave detail
Routing - PLAN CHECK4/24/2017 4/24/2017 FAIL
DetailsBrian McGowan
Needed floor plan with notes, wall bracing, fire rated eave detail
Application received 4/24/2017