BLD-Aging Inspection | 11/7/2017 | 11/7/2017 | 11/8/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
Dave Hannah
|
|
|
Jack Phone #: ###-####
|
BLD-Framing/Rough-in | 6/15/2017 | 6/15/2017 | 6/15/2017 | P | PART |
Dave Hannah
|
|
|
Jack Phone #: ###-#### shear ok to cover ext
|
BLD-Framing/Rough-in | 6/14/2017 | 6/14/2017 | 6/15/2017 | P | PART |
Dave Hannah
|
|
|
Jack Phone #: ###-#### ok to cover ext
|
BLD-Concrete | 5/24/2017 | 5/24/2017 | 5/25/2017 | P | PASS |
Dave Hannah
|
|
|
Jack Phone #: ###-####
|
Routing Walk-In (Zoning) | 5/22/2017 | 5/22/2017 | 5/22/2017 | A | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 5/22/2017 | 5/22/2017 | 5/22/2017 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/22/2017 | | 5/22/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/22/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2017 | | DONE |
Brian McGowan
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/22/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/22/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 5/2/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/2/2017 | | 5/2/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/2/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/2/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/2/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/24/2017 | 4/24/2017 | 4/24/2017 | A | FAIL |
Katelyn Menuge
|
|
|
Appeal Period Ends 4-30-17. Will come back after Monday.
|
Routing Walk-In (BLD) | 4/24/2017 | 4/24/2017 | 4/24/2017 | A | FAIL |
Brian McGowan
|
|
|
Needed floor plan with notes, wall bracing, fire rated eave detail
|
1st review completed | | | 4/24/2017 | | FAIL |
Brian McGowan
|
|
|
Needed floor plan with notes, wall bracing, fire rated eave detail
|
Routing - PLAN CHECK | 4/24/2017 | | 4/24/2017 | | FAIL |
Brian McGowan
|
|
|
Needed floor plan with notes, wall bracing, fire rated eave detail
|
Application received | | 4/24/2017 | | | |
|
|
|
|