Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-01156
StatusFinaled
Name VISSER BUILDING CO
Site Address 580 E ORION CT
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Foothills, Zone "A" requirements. Project is of metal construction. Permit for louvered cover patio addition (16'x27' approx. or 432 square feet) and deck repair. All work to be done according to notes, review notes, engineering, soils reports and local codes. Separate Separate electrical, plumbing, mechanical and erosion permit is required. All work to be done according to plans, notes, review notes, engineering and local codes. **BJM** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/12/201710/12/201710/12/2017PPASS
DetailsTony Young
Bob Phone #: ###-####
DOC - Permit Finaled10/12/201710/12/201710/12/2017PPASS
DetailsTony Young
BLD-Final10/11/201710/12/201710/12/2017ADEFR
DetailsTony Young
Bob Phone #: ###-####,, defr to pm
BLD-Footing8/15/20178/15/20178/15/2017APASS
DetailsDave Hannah
Request inspection between 10 and 11 Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing7/20/20177/21/20177/21/2017APART
DetailsTony Young
Jay Phone #: ###-####,, 4 pier footings ok,, 5th one may be eliminated due to large rock?
PubWorks Subgrade Approval7/18/20177/18/20177/18/2017 DONE
DetailsJason C. Taylor
**CHECK FOR WET SOILS***A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  7/11/2017 DONE
OVERRIDE  5/17/2017  
Plan assigned to (BJM)4/26/20174/26/20175/17/2017 DONE
DetailsBrian McGowan
Engineering and Soils Report don't match
Telephone call  5/17/2017 DONE
called Bob to let know permit is ready and how much is owed
Routing - PLAN CHECK5/17/2017 5/17/2017 PASS
DetailsBrian McGowan
Case Summary (BLD)  5/17/2017 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  5/17/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  5/17/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  5/17/2017 DONE
need RP
Routing - PLAN CHECK4/28/2017 5/10/2017 FAIL
DetailsBrian McGowan
Engineering and soil report to not match
1st review completed  5/10/2017 FAIL
DetailsBrian McGowan
Engineering and soil report to not match
Routing Walk-In (BLD)4/26/20174/26/20174/28/2017ADONE
DetailsAndy J. Long
Routing - Erosion and Sediment4/26/2017 4/28/2017 PASS
DetailsAndy J. Long
No new earthwork outside exisiting patio footprint. Limited excavation. No ESC permit required at this time. If violations observed on project, a permit shall be requested.
Routing PW Grading-Hillside4/26/2017 4/26/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer (MTI) indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (Zoning)4/24/20174/24/20174/24/2017PPASS
DetailsTodd Tucker
Routing Walk-In (BLD)4/24/20174/24/20174/24/2017PFAIL
DetailsDavid Ferguson
Need #310 form and take-in as level 2 walk-in next visit for approval from ESC and hillside.
1st review completed  4/24/2017 DONE
DetailsDavid Ferguson
Application received 4/24/2017