BLD-Final | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | DEFR |
Tony Young
|
|
|
Bob Phone #: ###-####,, defr to pm
|
BLD-Footing | 8/15/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Dave Hannah
|
|
|
Request inspection between 10 and 11 Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PART |
Tony Young
|
|
|
Jay Phone #: ###-####,, 4 pier footings ok,, 5th one may be eliminated due to large rock?
|
PubWorks Subgrade Approval | 7/18/2017 | 7/18/2017 | 7/18/2017 | | DONE |
Jason C. Taylor
|
|
|
**CHECK FOR WET SOILS***A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 7/11/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/17/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 4/26/2017 | 4/26/2017 | 5/17/2017 | | DONE |
Brian McGowan
|
|
|
Engineering and Soils Report don't match
|
Telephone call | | | 5/17/2017 | | DONE |
|
|
|
called Bob to let know permit is ready and how much is owed
|
Routing - PLAN CHECK | 5/17/2017 | | 5/17/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/17/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/17/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/17/2017 | | DONE |
|
|
|
need RP
|
Routing - PLAN CHECK | 4/28/2017 | | 5/10/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering and soil report to not match
|
1st review completed | | | 5/10/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering and soil report to not match
|
Routing Walk-In (BLD) | 4/26/2017 | 4/26/2017 | 4/28/2017 | A | DONE |
Andy J. Long
|
|
|
|
Routing - Erosion and Sediment | 4/26/2017 | | 4/28/2017 | | PASS |
Andy J. Long
|
|
|
No new earthwork outside exisiting patio footprint. Limited excavation. No ESC permit required at this time. If violations observed on project, a permit shall be requested.
|
Routing PW Grading-Hillside | 4/26/2017 | | 4/26/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer (MTI) indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 4/24/2017 | 4/24/2017 | 4/24/2017 | P | PASS |
Todd Tucker
|
|
|
|
Routing Walk-In (BLD) | 4/24/2017 | 4/24/2017 | 4/24/2017 | P | FAIL |
David Ferguson
|
|
|
Need #310 form and take-in as level 2 walk-in next visit for approval from ESC and hillside.
|
1st review completed | | | 4/24/2017 | | DONE |
David Ferguson
|
|
|
|
Application received | | 4/24/2017 | | | |
|
|
|
|