Second Notice | | 5/21/2018 | 5/18/2018 | | DONE |
|
|
|
This permit finaled on the web by Brandon Byington
|
First Notice | | 5/7/2018 | 5/11/2018 | | DONE |
|
|
|
mailed 5-14
|
Permanent Occupancy | | | 4/27/2018 | | DONE |
|
|
|
|
BLD-Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Mike Jordan
|
|
|
cecle Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Hydraulic closures are required on the smoke doors for the building inspection.
cecle Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 4/5/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/5/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/28/2018 | 3/28/2018 | 4/4/2018 | | PASS |
Carl Westfall
|
|
|
x plan mod
|
Routing - PLAN CHECK | 3/28/2018 | | 4/4/2018 | | PASS |
Carl Westfall
|
|
|
1st plan mod - 1st review approved
|
Plan Reviewer's activity | | | 4/4/2018 | | PASS |
|
|
|
1st plan mod approved
|
Telephone call | | | 4/4/2018 | | DONE |
|
|
|
spoke with Mike Berard at Kreizenbeck, verified value on plan mod app is correct for up to date value.
|
Print Occupancy Form | | | 4/4/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/4/2018 | | |
|
|
|
DO NOT RESISSUE, plan mod fees (and additional value fees) due
|
Plan Modification Accepted | | | 3/28/2018 | | DONE |
|
|
|
Plan mod for revisions to EVOR/Console/Supply floor plans, anesthesia work and supply rooms, location of doors 208 & 209, removal of reloacted workstation and casework outside of anesthesia office 209, demolition of existing med gas outlet at new anesthesia offices, existing walls of EVOR room to receive lead lining, observation window between EVOR and scrub area of corridor 208 to be replaced with leaded window, doors 201, 201A, & 203 to be replaced with lead lined doors and associated door hardware, shift Philips and Maquet equipment toward sub sterile 203.
|
BLD-Final | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PART |
Mike Jordan
|
|
|
part final- Cecil Phone #: ###-####. Rooms 209 and 210 ok to occupy.
|
FIRE-Final Inspection | 12/20/2017 | 12/20/2017 | 12/20/2017 | P | DONE |
Troy Cobbley
|
|
|
Life safety passed for Rooms 209 and 210
Cecil Phone #: ###-####
|
BLD-Framing/Rough-in | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
Mike Jordan
|
|
|
Cecel Phone #: ###-####. Interior steel stud framed walls and hardlids. peding fire sprinkler rough in.
|
FIRE-Final Inspection | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PART |
Troy Cobbley
|
|
|
Life safety is complete in the two Anesthsia Rooms.
Cecil Phone #: ###-####
|
Print Occupancy Form | | | 8/18/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/18/2017 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/8/2017 | 5/8/2017 | 7/25/2017 | | PASS |
Carl Westfall
|
|
|
(4th done) (May 26 - 15 days) (47 sheets) ARMC Hybrid EVOR Remodel
|
Routing - PLAN CHECK | 7/24/2017 | | 7/25/2017 | | PASS |
Carl Westfall
|
|
|
Approved by Structural
|
Routing Off Site - STRUCTURAL | 7/25/2017 | | 7/25/2017 | | PASS |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/25/2017 | | DONE |
|
|
|
ALL MET need GC and rev cert of val
|
Plan resubmittals received | | | 7/24/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/3/2017 | | 7/6/2017 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Plan resubmittals requested | | | 7/6/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/22/2017 | 6/25/2017 | 7/4/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 6/30/2017 | | 7/3/2017 | | PASS |
Carl Westfall
|
|
|
Pending approval by Structural
|
Plan resubmittals received | | | 6/30/2017 | | DONE |
|
|
|
|
1st review completed | | | 6/22/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/22/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/8/2017 | | 6/22/2017 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing Off Site - STRUCTURAL | 5/8/2017 | | 5/11/2017 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing PW Environmental | 5/8/2017 | | 5/11/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 5/8/2017 | 5/8/2017 | 5/8/2017 | | PASS |
Katie Marron
|
|
|
Separate Fire permits will be required. No further comments.
|
Intake Approval | | | 5/8/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl M completed pre screen
|
Routing - MECHANICAL | 5/8/2017 | | 5/8/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/8/2017 | | 5/8/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 5/8/2017 | | 5/8/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/8/2017 | | 5/8/2017 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 4/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 25 2017 8:36AM
|