BLD-Final | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | PASS |
Jim Storey
|
|
|
Charlie Phone #: ###-####
|
DOC - Permit Finaled | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/30/2019 | 7/31/2019 | 8/1/2019 | A | PASS |
Jim Storey
|
|
|
Charlie Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 5/20/2019 | | DONE |
|
|
|
ok to bring out of EXP per Jim Storey. Charlie Brown (contractor) called to say that they are finishing up that work.
|
BLD-Aging Inspection | 5/10/2019 | 5/10/2019 | 5/10/2019 | | PASS |
Jim Storey
|
|
|
ncfi
|
DOC - Permit Expired | 5/10/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Jim Storey
|
|
|
open ele /ncfi
|
BLD-Aging Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 | | PASS |
Jim Storey
|
|
|
trades open
|
BLD-Aging Inspection | 8/15/2018 | 8/15/2018 | 8/15/2018 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 4/3/2018 | 4/3/2018 | 4/3/2018 | | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 11/17/2017 | 11/20/2017 | 11/20/2017 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Energy code compliance | 11/20/2017 | 11/20/2017 | 11/20/2017 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Energy code compliance | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PASS |
Jim Storey
|
|
|
Insulation // Dave Phone #: ###-#### first phase barrells ok to cover as well as exterior walls
|
Routing - MECHANICAL | 9/13/2017 | | 9/14/2017 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 9/13/2017 | | DONE |
|
|
|
Started work flow to upload new manual j
|
BLD-Foundation | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-#### pads and walls garage and breese way/ bearing thur floor ok walls in basement ok to cover pending ele/ insulatin ok above barrell/ exterior ok pending trades in house
|
Extend Permit 90/180 days | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Jim Storey
|
|
|
garage ft pads ok
|
BLD-Concrete | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | NR |
Jim Storey
|
|
|
Rebar-Waylon Phone #: ###-####
|
BLD-Footing | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | FAIL |
Jim Storey
|
|
|
Jeff Phone #: ###-#### garage missing bar/ min 3 inches dobies
|
BLD-Footing | 7/3/2017 | 7/5/2017 | 7/5/2017 | A | PART |
Brandon Shaw
|
|
|
Two footings down in basement
|
BLD-Foundation | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | PART |
Mike Jordan
|
|
|
request late pm // Jeff Phone #: ###-####
|
BLD-Footing | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | PASS |
Brandon Shaw
|
|
|
Phase I footing
|
Permit Ready to Issue | | | 5/22/2017 | | DONE |
Christina Prado
|
|
|
Need GC form & RP for issuance
|
Issue PAID IN FULL permit | | | 5/22/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2017 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 5/2/2017 | 5/2/2017 | 5/21/2017 | | DONE |
Brian McGowan
|
|
|
due 5/1 FAILED- living space over setback, helical piers, special inspection form required
|
Routing - PLAN CHECK | 5/21/2017 | | 5/21/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLANNING | 5/12/2017 | | 5/12/2017 | | PASS |
Jeff Lowe
|
|
|
|
1st review completed | | | 5/10/2017 | | FAIL |
Brian McGowan
|
|
|
Portion of upper floor and loft at Garage extends into setback
|
Routing - PLAN CHECK | 4/25/2017 | | 5/10/2017 | | FAIL |
Brian McGowan
|
|
|
Portion of upper floor and loft at Garage extends into setback
|
Plan assigned to (DAF) | 4/25/2017 | 4/25/2017 | 5/2/2017 | | DEFR |
David Ferguson
|
|
|
due 5/1
|
Routing - PLANNING | 4/25/2017 | | 4/26/2017 | | FAIL |
Jeff Lowe
|
|
|
living space on south side projects into rear setback. spire not to exceed 35-feet
|
Application received | | | 4/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 25 2017 8:37AM
|
Plans ACCEPTED BY PLAN TECH | | | 4/25/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/25/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/25/2017 | | DONE |
|
|
|
e plan so no fees taken in at submittal
|