Third Notice | | 1/17/2018 | 1/15/2018 | | DONE |
|
|
|
This permit finaled on the web by Jake Miller
|
Second Notice | | 12/22/2017 | 1/12/2018 | | DONE |
|
|
|
mailed 1-12-18
|
PubWorks Occupancy Approval | 12/12/2017 | 12/12/2017 | 12/12/2017 | | DONE |
Tiffany Lowery
|
|
|
|
First Notice | 12/8/2017 | 12/8/2017 | 12/12/2017 | | DONE |
Jim Sly
|
|
|
Mailed 12-13-17
|
BLD-Final | 12/7/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-####
|
DOC - Permit Finaled | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Jim Sly
|
|
|
|
Letter of compliance/Occupancy | | | 12/8/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/1/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Mark Phone #: ###-####
|
FIRE-Final Inspection | 11/22/2017 | 11/27/2017 | 11/27/2017 | A | FAIL |
Troy Cobbley
|
|
|
Install Knox Box, finish installing the exit discharge lights, finish concrete infront of south exit door.
Mark Phone #: ###-####
|
BLD-Energy code compliance | 11/6/2017 | 11/8/2017 | 11/7/2017 | P | NR |
Mike Jordan
|
|
|
Insulation // Mark Phone #: ###-####.
|
BLD-Framing/Rough-in | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Mike Jordan
|
|
|
Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 10/13/2017 | 10/16/2017 | 10/16/2017 | P | PASS |
Mike Jordan
|
|
|
Mark-plywood on the roof awings Phone #: ###-####. Steel stud framing for awnings.
|
BLD-Foundation | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Jim Storey
|
|
|
Rebar // Mark Phone #: ###-####
|
BLD-Concrete | 9/8/2017 | 9/11/2017 | 9/11/2017 | P | PART |
Mike Jordan
|
|
|
rebar- Mark Phone #: ###-####. Loading dock wall.
|
BLD-Footing | 8/21/2017 | 8/22/2017 | 8/22/2017 | P | PART |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Work in progress on remainder of loading dock footings. Will have special inspection.
|
BLD-Foundation | 8/18/2017 | 8/21/2017 | 8/21/2017 | A | PART |
Mike Jordan
|
|
|
Rebar // Mark Phone #: ###-####. remainder of exterior footings and work in progress on dock footings. Ok pending specail inspection.
|
BLD-Footing | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | PASS |
Mike Jordan
|
|
|
Mark Phone #: ###-####. east exterior footinf, north exterior footing to loading dock, south east portion of exterior footing.
|
BLD-Concrete | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | PART |
Mike Jordan
|
|
|
Rebar - Mark Phone #: ###-####. Work in progress on reinforcement for concrete tilt panels. Inspected panels #6 and #16. ok. Will have special inspection. Ok to place concrete after special inspection is ok.
|
BLD-Concrete | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PASS |
Mike Jordan
|
|
|
rebar in piers - Mark Phone #: ###-####. Column pad footings 4 total ok..
|
BLD-Conference | 6/19/2017 | 6/21/2017 | 6/21/2017 | A | DONE |
Mike Jordan
|
|
|
jake Phone #: ###-####. Precon meeting with contractor and sub contractors.
|
Issue PAID IN FULL permit | | | 6/6/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/26/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 4/25/2017 | 4/25/2017 | 5/26/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp 5/25 Jordan wilcomb warehouse
|
Inspection Record Card- Bld | | | 5/26/2017 | | DONE |
|
|
|
|
Telephone call | | | 5/26/2017 | | DONE |
Christina Prado
|
|
|
Emailed fees due to Gayle w/Van Auker, advised GC for was needed in addition to fee payment
|
Routing - PLAN CHECK | 5/23/2017 | | 5/26/2017 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 5/26/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/26/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/26/2017 | | DONE |
Christina Prado
|
|
|
Applicant is GC, need form only C_P /// new GC and rev cert of val
|
Plan resubmittals received | | | 5/25/2017 | | DONE |
|
|
|
Received two copies of plan sheet M1.0 and E3.2; taken to Carl M.
|
Plan resubmittals received | | | 5/25/2017 | | DONE |
|
|
|
received two copies of plan sheets E2.0LA, E2.0LB, E3.2; taken to Carl M.
|
Route to Impact Fee Review | 5/23/2017 | 5/26/2017 | 5/24/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/23/2017 | | FAIL |
|
|
|
Failed Plan Check and Structural review.
|
Routing - FIRE | 5/21/2017 | | 5/23/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLAN CHECK | | | 5/21/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/25/2017 | | 5/21/2017 | | FAIL |
Carl D Madsen
|
|
|
Sent 4/25
|
Routing Off Site - STRUCTURAL | 5/10/2017 | | 5/21/2017 | | PASS |
Carl D Madsen
|
|
|
resubmittals Passed per letter received
|
Routing - PLUMBING | 5/10/2017 | | 5/11/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - MECHANICAL | 5/10/2017 | | 5/10/2017 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | | | 5/10/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved, valid stormwater team designated. Site preparation inspection is REQUIRED, call ###-#### to schedule.
|
Telephone call | | | 5/10/2017 | | DONE |
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 5/10/2017 | | DONE |
|
|
|
received three copies of plan sheets S1.1, S2.1, and revised calcs with response; inserted by Gayle Jensen and taken back to plumbing review.
|
Routing PW Solid Waste | | | 5/9/2017 | | PASS |
|
|
|
Solid waste is OK as planned.
|
Routing - PUBLIC WORKS | | | 5/9/2017 | | PASS |
|
|
|
|
Routing - PLANNING | 5/9/2017 | | 5/9/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Design Review | | | 5/9/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Plan resubmittals received | | | 5/3/2017 | | DONE |
|
|
|
resubmittals received 3 ests of sheets 1.0, 2.0, 3.0, 4.0 & 5.0-took to Carl M
|
Routing PW Drainage | 4/27/2017 | | 5/2/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 4/26/2017 | | 4/26/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Using existing service stub.
|
Routing PW Sewer Rating | 4/26/2017 | | 4/26/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/25/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/25/2017 | | PASS |
Carl Westfall
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/25/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING Land Div | 4/25/2017 | | 4/25/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Addressing | 4/25/2017 | | 4/25/2017 | | PASS |
Laura Hunter
|
|
|
|
Application received | | 4/25/2017 | | | |
|
|
|
|