BLD-Aging Inspection | 10/3/2017 | 10/3/2017 | 10/11/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Footing | 5/19/2017 | 5/22/2017 | 5/22/2017 | A | PASS |
Tony Young
|
|
|
- Warren Phone #: ###-####
|
PubWorks Subgrade Approval | 5/22/2017 | 5/22/2017 | 5/22/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 5/19/2017 | 5/19/2017 | 5/19/2017 | P | PEND |
Tony Young
|
|
|
Requests 2PM - Warren Phone #: ###-####,, needs soil approval for hillside
|
Issue PAID IN FULL permit | | | 5/5/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/3/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 5/2/2017 | 5/2/2017 | 5/3/2017 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JB_) Josh | 5/2/2017 | 5/2/2017 | 5/3/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/2/2017 | | 5/3/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 5/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/3/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/3/2017 | | DONE |
|
|
|
Need RP
|
Telephone call | | | 5/3/2017 | | DONE |
|
|
|
Spoke with Warren informing him that this permit is ready and that a RP will be needed
|
Routing Walk-In (Zoning) | 5/2/2017 | 5/2/2017 | 5/2/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing - Erosion and Sediment | 5/2/2017 | | 5/2/2017 | | PASS |
Melissa Jannusch
|
|
|
|
Routing PW Grading-Hillside | 5/2/2017 | | 5/2/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Meeting | | | 5/2/2017 | | DONE |
|
|
|
removed from eplan, customer in office with paper plans
|
Application received | | | 4/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 25 2017 1:59PM
|