BLD-Final | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Rolo Phone #: ###-####
|
DOC - Permit Finaled | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 1/26/2018 | 1/26/2018 | 1/26/2018 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Brandon Shaw
|
|
|
Soffit - Rollo Phone #: ###-####
|
BLD-Energy code compliance | 10/9/2017 | 10/9/2017 | 10/10/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 10/9/2017 | 10/9/2017 | 10/10/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | FAIL |
Brandon Shaw
|
|
|
See correction notice
OK to insulate
|
BLD-Wall Bracing | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Brad McJunkin
|
BLD-Foundation | 8/2/2017 | 8/2/2017 | 8/3/2017 | P | PASS |
Brandon Shaw
|
|
|
These will be ready at 3p Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Footing | 7/28/2017 | 7/31/2017 | 7/31/2017 | A | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-####
|
PubWorks Subgrade Approval | 7/17/2017 | 7/17/2017 | 7/17/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Framing/Rough-in | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | CANC |
Brandon Shaw
|
|
|
Rollo Phone #: ###-#### rollo called 7-13-2017 at 8:44 wrong permit number
|
Issue PAID IN FULL permit | | | 7/11/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/11/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/15/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 5/15/2017 | | DONE |
Christina Prado
|
|
|
All requirement met for issuance
|
Plan assigned to (JG) | 4/27/2017 | 4/27/2017 | 5/13/2017 | | PASS |
Javier Guzman
|
|
|
5/15 L2 SFD Hillside ePlan
|
1st review completed | | | 5/13/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/27/2017 | | 5/13/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Grading-Hillside | 4/27/2017 | | 5/2/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Route to Impact Fee Review | 4/27/2017 | 4/30/2017 | 4/28/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Erosion and Sediment | 4/27/2017 | | 4/28/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with site map and narrative approved. Valid RP and PD designated.
|
Routing - MECHANICAL | 4/27/2017 | | 4/28/2017 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 4/27/2017 | 4/27/2017 | 4/27/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for fd access, hydrant availability and defensible space.
|
Routing - PLANNING | 4/27/2017 | | 4/27/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 4/27/2017 | | 4/27/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/27/2017 | | 4/27/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/27/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/27/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/27/2017 | | DONE |
|
|
|
|
Pending Assignment by AJS | 4/27/2017 | | 4/27/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 4/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 25 2017 4:50PM
|