Print Statement | | | 11/27/2017 | | DONE |
|
|
|
|
First Notice | | 10/26/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
Permanent Occupancy | | | 10/16/2017 | | DONE |
|
|
|
|
BLD-Final | 10/5/2017 | 10/6/2017 | 10/6/2017 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 10/5/2017 | 10/6/2017 | 10/6/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 10/5/2017 | 10/5/2017 | 10/5/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Framing/Rough-in | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | PASS |
Brandon Shaw
|
|
|
Joe Phone #: ###-####
|
BLD-Concrete | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Other | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | PART |
Mike Jordan
|
|
|
Cid Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/9/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/9/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/7/2017 | | |
|
|
|
|
Plan assigned to (JG) | 5/5/2017 | 5/5/2017 | 6/7/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 5/25 VFW Pavilion ePlan pend eng.
|
Routing Off Site - STRUCTURAL | 5/30/2017 | | 6/7/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Dave Haugland
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/7/2017 | | DONE |
Christina Prado
|
|
|
**ALL MET** Need ACHD, RP, GC Form & Revised certificate of value for issuance
|
Routing - PLAN CHECK | 5/30/2017 | | 5/30/2017 | | PASS |
Javier Guzman
|
|
|
|
Route to Impact Fee Review | 5/24/2017 | 5/27/2017 | 5/25/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/24/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 5/5/2017 | | 5/24/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 5/5/2017 | | 5/23/2017 | | FAIL |
Javier Guzman
|
|
|
failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - Erosion and Sediment | 5/5/2017 | | 5/10/2017 | | PASS |
Andy J. Long
|
|
|
General Permit issued, ESC permit conditions apply. No ESC plan required. Approved.
|
Routing - FIRE | 5/5/2017 | 5/5/2017 | 5/8/2017 | | PASS |
Katie Marron
|
|
|
no comments required.
|
Routing - Addressing | 5/5/2017 | | 5/8/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Drainage | 5/8/2017 | | 5/8/2017 | | PASS |
Brian Murphy
|
|
|
VFW SHADE AWNING
|
Routing - PLANNING | 5/5/2017 | | 5/8/2017 | | PASS |
Cody Riddle
|
|
|
No review required.
|
Routing - PUBLIC WORKS | 5/5/2017 | | 5/8/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 5/5/2017 | | 5/8/2017 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 5/5/2017 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 5/4/2017 | | 5/4/2017 | | PASS |
Andy J. Long
|
|
|
ESC general permit approved. No ESC plan or plan waiver document required.
|
Intake Approval | | | 5/2/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Please contact Andy Long (###-####) with ESC to see if he will need an ESC narrative and ESC plans for this project or a waiver letter would suffice.
• Please provide Planning & Zoning letter(s) of approval
• Please view Plan sheet 3.0 as it states it is the elevation and column details but when opened and viewed it is the same floor plan as plan sheet 2.0
|
Application received | | | 4/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 27 2017 11:33AM
|