Second Notice | | 11/24/2017 | 12/10/2017 | | DONE |
|
|
|
This permit finaled on the web by Brodie Schmidt
|
First Notice | 10/19/2017 | 10/19/2017 | 11/14/2017 | | DONE |
Dave Hannah
|
|
|
Mailed 11-15-17
|
BLD-Final | 10/5/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Dave Hannah
|
|
|
swimming pool final Phone #: ###-#### Inspection requested via web by Brodie Schmidt
|
DOC - Permit Finaled | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 5/31/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
Dave Hannah
|
|
|
Pool // Brody Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/31/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/26/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 4/27/2017 | 4/27/2017 | 5/26/2017 | | PASS |
Carl D Madsen
|
|
|
5/27 Millbrook Sub Pool
|
Telephone call | | | 5/26/2017 | | DONE |
Christina Prado
|
|
|
Called Brodie to advise permit is ready pending fee, GC form & ACHD approval
|
Routing - PLAN CHECK | 5/22/2017 | | 5/26/2017 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 5/26/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/26/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/26/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/26/2017 | | DONE |
Christina Prado
|
|
|
Need GC form only as of 5/30/17 C_P /// need ACHD and gc form
|
1st review completed | | | 5/22/2017 | | PASS |
|
|
|
|
Routing - FIRE | 5/21/2017 | | 5/22/2017 | | PASS |
Scott Arellano
|
|
|
Plans approved as shown. No separate comments attached.
|
Routing - PLAN CHECK | 5/9/2017 | | 5/21/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 5/3/2017 | | 5/9/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - MECHANICAL | 5/4/2017 | | 5/8/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | | | 5/4/2017 | | PASS |
Daryl Spivey
|
|
|
ASSE 1070 mixing valve required at public lavs.
|
Routing - Erosion and Sediment | 5/3/2017 | | 5/4/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid RP and PD. Site preparation inspection required.
|
Routing - PUBLIC WORKS | | | 5/3/2017 | | PASS |
|
|
|
|
Routing PW Sewer Design | 5/2/2017 | | 5/3/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 5/1/2017 | | 5/2/2017 | | PASS |
Brian Murphy
|
|
|
approve in earler odi
|
Routing PW Flood Plain | 5/1/2017 | | 5/2/2017 | | PASS |
Jim Wyllie
|
|
|
Buildings are not in the floodplain as per Letter of Map Revison for Warm Springs Creek.
Jim Wyllie / ###-####
|
Routing PW Sewer Rating | 5/1/2017 | | 5/1/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 4/28/2017 | | 5/1/2017 | | PASS |
Laura Hunter
|
|
|
Updated address to 2980 S Millbroook Way
|
Routing - PLANNING Land Div | 4/27/2017 | | 4/28/2017 | | PASS |
Todd Tucker
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/27/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/27/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/27/2017 | | DONE |
|
|
|
|
Application received | | 4/27/2017 | | | |
|
|
|
|