(HARRIS RANCH COMMUNITY CENTER POOL) Pemit for the installation of a new pool adjacent to the community center building per the approved plans. The barrier was addressed under bld16-04280 as was the restroom fixture count. This permit is for the installation of the pool and pool deck only. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/24/201712/10/2017 DONE
This permit finaled on the web by Brodie Schmidt
First Notice10/19/201710/19/201711/14/2017 DONE
DetailsDave Hannah
Mailed 11-15-17
BLD-Final10/5/201710/19/201710/19/2017APASS
DetailsDave Hannah
swimming pool final Phone #: ###-#### Inspection requested via web by Brodie Schmidt
DOC - Permit Finaled10/19/201710/19/201710/19/2017PPASS
DetailsDave Hannah
BLD-Footing5/31/20176/2/20176/2/2017APASS
DetailsDave Hannah
Pool // Brody Phone #: ###-####
Issue PAID IN FULL permit  5/31/2017 DONE
OVERRIDE  5/26/2017  
Plan assigned to (CDM)4/27/20174/27/20175/26/2017 PASS
DetailsCarl D Madsen
5/27 Millbrook Sub Pool
Telephone call  5/26/2017 DONE
DetailsChristina Prado
Called Brodie to advise permit is ready pending fee, GC form & ACHD approval
Routing - PLAN CHECK5/22/2017 5/26/2017 PASS
DetailsCarl D Madsen
Case Summary (BLD)  5/26/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/26/2017 DONE
Print Occupancy Form  5/26/2017 DONE
Permit Ready to Issue  5/26/2017 DONE
DetailsChristina Prado
Need GC form only as of 5/30/17 C_P /// need ACHD and gc form
1st review completed  5/22/2017 PASS
Routing - FIRE5/21/2017 5/22/2017 PASS
DetailsScott Arellano
Plans approved as shown. No separate comments attached.
Routing - PLAN CHECK5/9/2017 5/21/2017 PASS
DetailsCarl D Madsen
Routing - PLANNING5/3/2017 5/9/2017 PASS
DetailsTodd Tucker
Routing - MECHANICAL5/4/2017 5/8/2017 PASS
DetailsTroy James
Routing - PLUMBING  5/4/2017 PASS
DetailsDaryl Spivey
ASSE 1070 mixing valve required at public lavs.
Routing - Erosion and Sediment5/3/2017 5/4/2017 PASS
DetailsAndy J. Long
ESC plan approved. Valid RP and PD. Site preparation inspection required.
Routing - PUBLIC WORKS  5/3/2017 PASS
Routing PW Sewer Design5/2/2017 5/3/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Drainage5/1/2017 5/2/2017 PASS
DetailsBrian Murphy
approve in earler odi
Routing PW Flood Plain5/1/2017 5/2/2017 PASS
DetailsJim Wyllie
Buildings are not in the floodplain as per Letter of Map Revison for Warm Springs Creek.

Jim Wyllie / ###-####
Routing PW Sewer Rating5/1/2017 5/1/2017 PASS
DetailsMorgan Webb
Routing - Addressing4/28/2017 5/1/2017 PASS
DetailsLaura Hunter
Updated address to 2980 S Millbroook Way
Routing - PLANNING Land Div4/27/2017 4/28/2017 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  4/27/2017 DONE
Intake Approval  4/27/2017 PASS
Recd Pcfee & Taken To Pln CK  4/27/2017 DONE
Application received 4/27/2017