BLD-Final | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | PASS |
Jim Storey
|
|
|
Greg Phone #: ###-####
|
DOC - Permit Finaled | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | PASS |
Jim Storey
|
|
|
|
Routing PW Grading-Hillside | 1/31/2018 | | 1/31/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | NR |
Tony Young
|
|
|
Greg Phone #: ###-####,, walk through only
|
OVERRIDE | | | 1/29/2018 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/29/2018 | | DONE |
|
|
|
PLAN MOD
|
(F) Reprint permit | | | 1/29/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2018 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 1/29/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/29/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod approved, DO NOT RE-ISSUE
|
Plan assigned to (BJM) | 1/19/2018 | 1/19/2018 | 1/24/2018 | | DONE |
Brian McGowan
|
|
|
Retaining wall resubmittal - Completed per Carl Madsen
|
Routing - PLAN CHECK | 1/22/2018 | | 1/24/2018 | | PASS |
Brian McGowan
|
|
|
Per Carl Madsen
|
Routing - PUBLIC WORKS | 1/22/2018 | | 1/22/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan Reviewer's activity | | | 1/19/2018 | | DONE |
Brian McGowan
|
|
|
Took resubmittals to Melissa
|
Routing PW Grading-Hillside | 1/19/2018 | | 1/19/2018 | | PASS |
Melissa Jannusch
|
|
|
RESUBMITTALS for upper retaining wall. Retaining wall built without plan approval. Have recieved updated plans and the calculations for the walls.
|
Plan Modification Accepted | | | 1/19/2018 | | DONE |
|
|
|
plan mod submitted-received 3 sheets of grading and drainage C.10 and 3 calcs-gave to brian McGowsn
|
BLD-Energy code compliance | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | PASS |
Tony Young
|
|
|
Greg Phone #: ###-####
|
BLD-Framing/Rough-in | 9/15/2017 | 9/18/2017 | 9/18/2017 | P | PASS |
Tony Young
|
|
|
Grej Phone #: ###-####
|
BLD-Wall Bracing | 8/25/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
Brandon Shaw
|
|
|
Greg Phone #: ###-####
|
BLD-Foundation | 6/28/2017 | 6/28/2017 | 6/28/2017 | P | PART |
Tony Young
|
|
|
foundation wall // Doug Phone #: ###-####,, work in progress
|
BLD-Footing | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PASS |
Brandon Shaw
|
|
|
Doug Phone #: ###-####
|
PubWorks Subgrade Approval | 6/20/2017 | 6/20/2017 | 6/20/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 6/16/2017 | 6/19/2017 | 6/19/2017 | A | NR |
Tony Young
|
|
|
Doug Phone #: ###-####
|
OVERRIDE | | | 5/30/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 4/28/2017 | 4/28/2017 | 5/30/2017 | | DONE |
Brian McGowan
|
|
|
Due 5-11
|
Telephone call | | | 5/30/2017 | | DONE |
|
|
|
called Greg and left vm permit is ready and fee due
|
Issue PAID IN FULL permit | | | 5/30/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/9/2017 | | 5/30/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 5/30/2017 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/30/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/30/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/30/2017 | | DONE |
|
|
|
met
|
Routing - FIRE | 5/25/2017 | 4/28/2017 | 5/25/2017 | | PASS |
Scott Arellano
|
|
|
Fire Sprinklers are required in this home; per Fire Department Conditions of subdivision (SUB07-00101)
|
Routing - Erosion and Sediment | 5/25/2017 | | 5/25/2017 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Valid RP and PD designated. Site preparation inspection required
|
Routing - MECHANICAL | 5/4/2017 | | 5/9/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/3/2017 | | 5/4/2017 | | PASS |
Colleen T Carroll
|
|
|
|
Routing PW Sewer Rating | 5/3/2017 | | 5/3/2017 | | PASS |
Rachael Beierle
|
|
|
|
Route to Impact Fee Review | 4/28/2017 | 5/1/2017 | 5/2/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 5/1/2017 | | 5/2/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 4/28/2017 | | 5/1/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan assigned to (AJS) | 4/28/2017 | 4/28/2017 | 4/28/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/28/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/28/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/28/2017 | | DONE |
|
|
|
|
Routing - Addressing | 4/28/2017 | | 4/28/2017 | | PASS |
Laura Hunter
|
|
|
|
Application received | | 4/28/2017 | | | |
|
|
|
|