BLD-Final | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | PASS |
Dave Hannah
|
|
|
Manny Phone #: ###-####
|
DOC - Permit Finaled | 12/29/2017 | 12/29/2017 | 12/29/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 12/27/2017 | 12/28/2017 | 12/29/2017 | P | NR |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
Letter of compliance/Occupancy | | | 12/29/2017 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 12/28/2017 | 12/28/2017 | 12/28/2017 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Conference | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | DONE |
Dave Hannah
|
|
|
Manny Phone #: ###-####
|
BLD-Energy code compliance | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Dave Hannah
|
|
|
Manny Phone #: ###-####
|
BLD-Framing/Rough-in | 8/31/2017 | 9/1/2017 | 9/1/2017 | A | PASS |
Dave Hannah
|
|
|
Manny Phone #: ###-####
|
BLD-Foundation | 7/12/2017 | 7/13/2017 | 7/16/2017 | P | PASS |
Dave Hannah
|
|
|
Radiar Phone #: ###-####
|
BLD-Footing | 7/11/2017 | 7/12/2017 | 7/12/2017 | A | PASS |
Jim Sly
|
|
|
Radiar Phone #: ###-####
|
Routing - PUBLIC WORKS GRADING | 7/11/2017 | | 7/11/2017 | | PASS |
Jim Wyllie
|
|
|
Received letter from MTI approving footing subgrade. Okay to schedule a footing inspection.
Jim Wyllie / ###-####
|
OVERRIDE | | | 6/27/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/19/2017 | 6/19/2017 | 6/27/2017 | A | PASS |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 6/19/2017 | 6/19/2017 | 6/27/2017 | | PASS |
Josh Bogle
|
|
|
1st. done - need Soils bearing report
|
Issue PAID IN FULL permit | | | 6/27/2017 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/27/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/27/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes - 62 copies @ $.05/copy
|
Inspection Record Card- Bld | | | 6/27/2017 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2017 | | DONE |
|
|
|
called Jeff Wallace and told him permit is ready and fee due. He said John Brown will be RP
|
Permit Ready to Issue | | | 6/27/2017 | | DONE |
|
|
|
all met
|
Routing PW Grading-Hillside | 6/19/2017 | | 6/26/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 6/26/2017 | | 6/26/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | | | 6/23/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid PD, okay for homeowner RP
|
Routing - PLANNING | | | 6/20/2017 | | PASS |
|
|
|
Comply with condition #2 of CFH17-00023 approval concerning driveway setbacks. Rear driveway nonconforming shall not be repaved. Required 3' landscape buffer along property line.
|
Routing Walk-In (Zoning) | 6/19/2017 | 6/19/2017 | 6/19/2017 | A | FAIL |
Nicolette Womack
|
|
|
Appeal period ends 6-19-17 at 5 pm. Comply with condition #2 of CFH17-00023 approval concerning driveway setbacks. Rear driveway nonconforming shall not be repaved.
|
Routing Walk-In (Zoning) | 4/28/2017 | 4/28/2017 | 6/19/2017 | A | CANC |
Tisha Gallop
|
|
|
|
1st review completed | | | 4/28/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 4/28/2017 | | | |
|
|
|
|