Permit Information
Permit NumberBLD17-01248
StatusFinaled
Name BRIGHT STAR ENERGY MANAGEMENT LLC
Site Address 2755 S HERITAGE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for 1,117 sq' addition, including master suite, wet bar, kitchen, laundry room, & powder room, also includes 216sq' of covered patio. Not approved as an Accessory Dwelling Unit. Note center point load from girder truss. All work per plans, notes, & local code. Separate electrical, plumbing, & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/6/20182/6/20182/6/2018PPASS
DetailsMike Jordan
Can this be done after 3pm? Phone #: ###-#### Inspection requested via web by Andrew Clark
DOC - Permit Finaled2/6/20182/6/20182/6/2018PPASS
DetailsMike Jordan
BLD-Final2/5/20182/6/20182/6/2018AFAIL
DetailsMike Jordan
Andrew Phone #: ###-####. Need CO detector and landings at man door and both sliders.
BLD-Final1/29/20181/29/20181/29/2018PFAIL
DetailsBrandon Shaw
Need trades final- Ele and Mech
BLD-Energy code compliance12/13/201712/14/201712/14/2017ADEFR
DetailsMike Jordan
Andrew Phone #: ###-####. Walls have been sheet rocked. No energy inspection was called in. Noted to contractor to have ibsulation sub contractor provide letter noting that job was installed per current codes.
BLD-Framing/Rough-in10/5/201710/6/201710/6/2017APASS
DetailsMike Jordan
Andrew Phone #: ###-####. All framing issues have been resolved. Air seal pack completed. Ok to insulate.
BLD-Conference10/4/201710/5/201710/5/2017ADONE
DetailsMike Jordan
Meet Glen ; Andrew Phone #: ###-#### Inspection requested via web by Andrew Clark
BLD-Framing/Rough-in10/4/201710/4/201710/4/2017PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Andrew Clark.. Not all corrections are completed.
BLD-Framing/Rough-in10/2/201710/2/201710/2/2017PFAIL
DetailsMike Jordan
Electrical Inspection is this afternoon as well.... we need okay to insulate tomorrow Phone #: ###-#### Inspection requested via web by Andrew Clark. Complete airseal after electrical rough in inspection. Nail off 3 ply truss per enginering.Lateral bracing on A2 truss placed at wrong location. Nail off all simpson hangars. Provide headers in doors @ existing exterior wall and install h2.5 on existing truss to wall. Strap top plates from addition to existing top plates. Strap top plates on interior wall at 3ply point load to adjacent wall. Provide continous bearing from 3ply point load to footing. Provide smoke detectors in exisitng bedrooms, hardwired and interconnected. Correction notice posted.
BLD-Wall Bracing8/23/20178/24/20178/24/2017APASS
DetailsMike Jordan
Shear // Andrew Phone #: ###-####
BLD-Foundation7/11/20177/11/20177/11/2017PPASS
DetailsMike Jordan
Levi Phone #: ###-####
BLD-Footing6/30/20177/5/20177/5/2017PPASS
DetailsMike Jordan
Levi Phone #: ###-####
OVERRIDE  5/31/2017  
Plan assigned to (JAB) Josh5/11/20175/11/20175/31/2017 PASS
DetailsJosh Bogle
waitng for more information from applicant (e-mailed my RFI) JAB 5-11-17
Routing Walk-In (BLD)5/10/20175/10/20175/31/2017PDONE
DetailsJosh Bogle
Routing - PLAN CHECK5/31/2017 5/31/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  5/31/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  5/31/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/31/2017 DONE
DetailsJosh Bogle
Permit Ready to Issue  5/31/2017 DONE
DetailsChristina Prado
All requirements met for issuance
Issue PAID IN FULL permit  5/31/2017 DONE
Routing - MECHANICAL5/24/2017 5/30/2017 PASS
DetailsTroy James
Routing Walk-In (Zoning)5/10/20175/10/20175/10/2017PDONE
DetailsSue Cummings
Routing Walk-In (Zoning)4/28/20174/28/20175/10/2017PDONE
DetailsCandy A. Nichols
Did not have the required 10 foot setback. Will come back with corrected drawings
1st review completed  4/28/2017 DONE
DetailsJosh Bogle
Application received 4/28/2017