BLD-Final | 2/14/2018 | 2/14/2018 | 2/15/2018 | P | NR |
Dave Hannah
|
|
|
Please call Jim, to be sure house is unlocked. Phone #: ###-#### Inspection requested via web by James Greenwood needs other trades finaled first
|
BLD-Aging Inspection | 11/14/2017 | 11/14/2017 | 11/17/2017 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/15/2017 | 11/15/2017 | 11/17/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Wall cover | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood
|
BLD-Energy code compliance | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by James Greenwood
|
BLD-Framing/Rough-in | 6/28/2017 | 6/28/2017 | 6/28/2017 | P | PASS |
Brandon Shaw
|
|
|
Framing plus energy conference. Spray foam insulation to be used in up stairs bathroom ceiling/exterior wall and attic space to be conditioned space. R28 estimated value with 2x4 rafters. OK to insulate
|
Issue PAID IN FULL permit | | | 5/2/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 5/1/2017 | 5/1/2017 | 5/1/2017 | A | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 5/1/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/1/2017 | | 5/1/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/1/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/1/2017 | | DONE |
|
|
|
all requirements met
|
Application received | | 5/1/2017 | | | |
|
|
|
|