Second Notice | | 6/21/2018 | 6/25/2018 | | DONE |
|
|
|
This permit finaled on the web by Charlene Meadows
|
First Notice | | 5/19/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
BLD-Final | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Final | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | CANC |
Dave Hannah
|
|
|
Brad Wheeler Phone #: ###-####
|
Print Occupancy Form | | | 5/9/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/9/2018 | | DONE |
|
|
|
|
Elevation Cert Rec'd-Final | | | 5/7/2018 | | DONE |
|
|
|
|
Routing PW Flood Plain | 5/7/2018 | | 5/7/2018 | | PASS |
Jason C. Taylor
|
|
|
Recieved 3rd Elevation Certificate. Occupancy approved. JCT
|
BLD-Final | 5/2/2018 | 5/2/2018 | 5/3/2018 | P | PEND |
Dave Hannah
|
|
|
Call to meet // Rod Phone #: ###-#### needs flood plan cert and ada signage
|
FIRE-Final Inspection | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire exitinguisher will be placed in discussed location. Final lilfe fire safety inspection complete.
|
BLD-Framing/Rough-in | 1/11/2018 | 1/11/2018 | 1/11/2018 | P | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Concrete | 11/27/2017 | 11/28/2017 | 12/5/2017 | A | DONE |
Dave Hannah
|
|
|
rebar- Brad Phone #: ###-####
|
BLD-Other | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PART |
Dave Hannah
|
|
|
Masonary wall - Brad Phone #: ###-#### ok after mti sign off
|
Elevation Cert Rec'd-Midconst | | | 11/8/2017 | | DONE |
|
|
|
EC #2 recieved. JCT
|
BLD-Other | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PASS |
Dave Hannah
|
|
|
rebar // Brad Wheeler Phone #: ###-####
|
Issue & PRINT to be Invoiced | | | 9/6/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/6/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/14/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 5/4/2017 | 5/4/2017 | 6/14/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp. 6/24 Ester Simplot park restrooms
|
Routing - Design Review | 5/4/2017 | | 6/14/2017 | | PASS |
Sarah Schafer
|
|
|
Signed of per E-Plan
|
Routing Off Site - STRUCTURAL | 6/5/2017 | | 6/14/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/5/2017 | | 6/14/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/14/2017 | | DONE |
Christina Prado
|
|
|
Need ACHD,- met 9-01-2017
RP, GC Form - met -9-01-2017
& Revised Certificate of Value for issuance
|
Routing PW Flood Plain | 6/5/2017 | | 6/9/2017 | | PASS |
Jason C. Taylor
|
|
|
Two Elevation Certificates will be required; one prior to receiving a framing inspection (after foundation is placed), and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval.
|
Route to Impact Fee Review | 5/20/2017 | 5/23/2017 | 6/5/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
Routing PW Sewer Design | 6/5/2017 | | 6/5/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Correct utility sheet is ESPC-200.pdf.
|
Routing PW Drainage | 6/5/2017 | | 6/5/2017 | | PASS |
Brian Murphy
|
|
|
master plan
|
Routing - PUBLIC WORKS | 6/5/2017 | | 6/5/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLAN CHECK | 5/22/2017 | | 6/3/2017 | | FAIL |
Carl D Madsen
|
|
|
Fail pending other departments
|
Routing Off Site - STRUCTURAL | 5/22/2017 | | 6/3/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 5/23/2017 | | 5/26/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
No change. See previous comments.
|
Routing PW Flood Plain | 5/23/2017 | | 5/24/2017 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in eplan. JCT
|
Routing PW Drainage | 5/23/2017 | | 5/23/2017 | | PASS |
Brian Murphy
|
|
|
master plan appoved
|
Routing - PUBLIC WORKS | 5/22/2017 | | 5/23/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLAN CHECK | 5/4/2017 | | 5/20/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 5/4/2017 | | 5/20/2017 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 5/20/2017 | | FAIL |
|
|
|
|
Routing PW Sewer Design | 5/4/2017 | | 5/15/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Connect to existing sewer service if possible. Previous design of the park included service for this bathroom that was installed at an intentional location.
|
Routing - MECHANICAL | 5/4/2017 | | 5/9/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Flood Plain | 5/4/2017 | | 5/8/2017 | | FAIL |
Jason C. Taylor
|
|
|
You will need to provide an elevation certificate for this project. We have determined that a BFE of 66.8 is about right for this project and you will need to meet the floodplain ordinance of 1 foot over the BFE for your finished floor height. So approximately 67.8 will need to be your finished floor height. Let me know if you have any questions. Jason Taylor
|
Routing - Erosion and Sediment | 5/4/2017 | | 5/5/2017 | | PASS |
Andy J. Long
|
|
|
Plan approved
|
Routing - FIRE | 5/4/2017 | 5/4/2017 | 5/4/2017 | | PASS |
Scott Arellano
|
|
|
Application included three alternate bid options. If the option with a storage room is chosen, a fire extinguisher will be required. If not only door hardware.
|
Routing PW Drainage | 5/4/2017 | | 5/4/2017 | | PASS |
Brian Murphy
|
|
|
SITE MASTER PLANED
|
Intake Approval | | | 5/4/2017 | | PASS |
|
|
|
|
Routing - PLUMBING | 5/4/2017 | | 5/4/2017 | | PASS |
Bill VanDegrift
|
|
|
1) move blowout tee downstream of the DCVA
2) max vent connection is 6' from a three inch trap
|
Routing - PLANNING | 5/4/2017 | | 5/4/2017 | | PASS |
Cody Riddle
|
|
|
|
Routing - PLANNING Land Div | 5/4/2017 | | 5/4/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 5/4/2017 | | 5/4/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/4/2017 | | 5/4/2017 | | PASS |
Rachael Beierle
|
|
|
|
Print Statement | | | 5/2/2017 | | DONE |
|
|
|
|
Application received | | | 5/1/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 1 2017 10:12AM
|
Intake Approval | | | 5/1/2017 | | FAIL |
|
|
|
Please address the following items.
1. There are several packets that have been uploaded as a group of plan sheets. Please upload each plan sheet individually.
2. Provide the geotechnical report indicated in the structural calculation package.
3 Provide the verification of legal lot and parcel form signed by zoning staff.
|