FIRE-Final Inspection | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | FAIL |
Adele J Schaffeld-Griffin
|
|
|
I delevered approved drawing to owner Tobe, fire extinguisher needs to be installed, handrails need to be installed per approved plans.
|
FIRE-Final Inspection | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | FAIL |
Jim Page
|
|
|
Building owners name is Toby, Toby was not available at time of inspection, no approved plans on site, life fire safety inspection was not performed. Business is being conducted at this location.
|
BLD-Final | 3/6/2018 | 3/7/2018 | 3/7/2018 | P | PEND |
Dave Hannah
|
|
|
Electrical permit finaled. Final if bld provisions completed needs fire life saftey first
|
BLD-Conference | 1/10/2018 | 2/8/2018 | 2/20/2018 | A | PEND |
Dave Hannah
|
|
|
Status? Issue 5 day N&O no notice issued talked with elec inspector he is working with elec contractor on elec
|
BLD-Other | 11/20/2017 | 11/28/2017 | 11/29/2017 | A | DONE |
Dave Hannah
|
|
|
Check status of work? no work done
|
Issue PAID IN FULL permit | | | 10/23/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/23/2017 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 10/20/2017 | | DONE |
|
|
|
Left a message for Jared informing him that this permit is going to expire in 8 days and if he would like he may send in a request for a 180 day extension. left permit number, my number and my email
|
Expiration Notice | 10/5/2017 | 10/26/2017 | 10/5/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (AJS) | 8/7/2017 | 8/7/2017 | 8/10/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
V Squared TI
|
Routing - PLAN CHECK | 8/7/2017 | | 8/10/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
approved with red line corrections and notes
|
1st review completed | | | 8/10/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/10/2017 | | DONE |
|
|
|
ALL MET
Need: GC
rev cert of val
|
Intake Approval | | | 8/7/2017 | | PASS |
Javier Guzman
|
|
|
Per Adele ok to accept and route to her
|
Plan Reviewer's activity | | | 6/14/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Tobe called, he has been out of town. I let him know we did not have any drawings uploaded. He will reach out to his contractor to get this done ASAP.
|
Plan Reviewer's activity | | | 6/5/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
left voice mail for both applicant and contractor.
|
Application received | | | 5/1/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 1 2017 10:25AM
|