Permit Information
Permit NumberBLD17-01276
StatusFinaled
Name OWYHEE ENTERPRISES LLC
Site Address 8655 W FRANKLIN RD
Project NameDMV - License Bureau
Customer Number 
ePlanReviewNo
Description
(DMV – DEPARTMENT OF MOTOR VEHICLES – LICENSE BUREAU) The fire sprinkler system is used for building area increase and for story increase. To remodel an existing 5,100 square foot tenant space located on the 1st story for a new office and assembly tenant. This project is a change of occupancy classification. New and existing toilet rooms are required to be accessible to the disabled as defined by the 2012 IBC. The showers are required to be maintained accessible to the disabled as defined by the 2000 IBC. Work is to include interior nonbearing walls, a Men’s toilet room accessible to the disabled having a toilet and a urinal, a service counter accessible to the disabled, millwork, and finishes. The concrete floor slab will be saw-cut to allow trenches for under slab plumbing. The concrete slab on grade will be patched after the plumbing is completed and the trenches are backfilled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/22/201710/12/2017 DONE
Mailed 10-13-17
Permanent Occupancy  9/12/2017 DONE
BLD-Final9/7/20179/8/20179/8/2017APASS
DetailsMike Jordan
Zack Phone #: ###-####. Temp occ. given. Will be ok for perm occ. once plumbing signs perm.
FIRE-Final Inspection9/6/20179/7/20179/7/2017PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Ceiling Grid Inspection8/28/20178/29/20178/29/2017APASS
DetailsMike Jordan
Zach Smith Phone #: ###-####
BLD-Framing/Rough-in7/25/20177/26/20177/26/2017APASS
DetailsMike Jordan
Zack Phone #: ###-####. Interior steel stud framed walls ok. no grid.
Route to Impact Fee Review6/20/20176/23/20176/21/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
Issue PAID IN FULL permit  6/21/2017 DONE
Print Occupancy Form  6/21/2017 DONE
Plan assigned to (CJW)5/8/20175/8/20176/20/2017 PASS
DetailsCarl Westfall
(1st done) (May 26 - 15 days) (11 sheets) paper - DMV
Routing - PLAN CHECK5/8/2017 6/20/2017 PASS
DetailsCarl Westfall
1st IBC plan review approved
Routing - FIRE6/20/2017 6/20/2017 PASS
DetailsKatie Marron
Separate Fire Permits will be required. Occupant load to be posted in waiting area is 124, per IBC plan review report. No comments attached, reference IBC plan report.
1st review completed  6/20/2017 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/20/2017 DONE
Permit Ready to Issue  6/20/2017 DONE
Need GC Form and Revised Cert of Value
Print Occupancy Form  6/20/2017 DONE
Telephone call  6/20/2017 DONE
called Larry Sundell and told him permit is ready and need GC form and revised cert of value
Routing - MECHANICAL5/8/2017 5/11/2017 PASS
DetailsChad Schwendiman
Routing - PLUMBING5/8/2017 5/11/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Erosion and Sediment5/8/2017 5/10/2017 PASS
DetailsAndy J. Long
No exterior work ; no ESC permit required.
Routing - Addressing5/8/2017 5/8/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/8/2017 5/8/2017 PASS
DetailsRachael Beierle
Pending Assignment by AJS5/5/2017 5/8/2017 DONE
DetailsAdele J Schaffeld-Griffin
Intake Approval  5/8/2017 PASS
DetailsAdele J Schaffeld-Griffin
pre screen passed by Carl M
Plans ACCEPTED BY PLAN TECH  5/5/2017 DONE
Recd Pcfee & Taken To Pln CK  5/5/2017 DONE
Application received 5/1/2017