BLD-Final | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Brandon Shaw
|
|
|
All is done except painting...does painting have to be completed before final? Phone #: ###-#### Inspection requested via web by justin milander
|
DOC - Permit Finaled | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Conference | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | DONE |
Brandon Shaw
|
|
|
Called justin and left message
|
BLD-Framing/Rough-in | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PART |
Brandon Shaw
|
|
|
see correction notice, ok to continue ok to final
|
BLD-Footing | 6/28/2017 | 6/28/2017 | 6/28/2017 | P | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-####
|
Routing Walk-In (BLD) | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 6/16/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/16/2017 | | 6/16/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/16/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/16/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/16/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/16/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 5/25/2017 | 5/25/2017 | 5/25/2017 | A | FAIL |
Brian McGowan
|
|
|
Just had questions on the footing and possible structure to be used.
|
Routing Walk-In (Zoning) | 5/2/2017 | 5/2/2017 | 5/2/2017 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/2/2017 | 5/2/2017 | 5/2/2017 | A | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 5/2/2017 | | FAIL |
Josh Bogle
|
|
|
Client neeeded footing structural calcs, dimensioned drawings might help. **JB**
|
Routing - PLAN CHECK | 5/2/2017 | | 5/2/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 5/2/2017 | | | |
|
|
|
|