BLD-Final | 3/12/2019 | 3/13/2019 | 3/13/2019 | P | DONE |
Tony Young
|
|
|
Will Phone #: ###-####,, done per plan and contractors agreement via e-mails
|
DOC - Permit Finaled | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 3/12/2019 | 3/12/2019 | 3/12/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 3/6/2019 | 3/6/2019 | 3/7/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/5/2019 | 3/5/2019 | 3/7/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 2/18/2019 | 2/19/2019 | 2/19/2019 | A | NR |
Tony Young
|
|
|
Will; Phone #: ###-####,, needs hillside and plumbing final,, no inspection
|
BLD-Conference | 2/15/2019 | 2/15/2019 | 2/18/2019 | P | NR |
Tony Young
|
|
|
Will; Phone #: ###-####,, need trades 1st,, hillside
|
BLD-Energy code compliance | 10/19/2018 | 10/22/2018 | 10/22/2018 | A | PART |
Tony Young
|
|
|
Garitt Phone #: ###-####,, ok,, ceiling issues to be taken care of by the final,, ok to cover
|
BLD-Conference | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PART |
Tony Young
|
|
|
Garrett; Phone #: ###-####,, ok to insulate
|
BLD-Framing/Rough-in | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | FAIL |
Tony Young
|
|
|
Garrit Phone #: ###-####,, needs a mechanical permit and inspection,, needs seal pack,, needs to meet head room on stairs on the main level and upstairs on the balcony
|
BLD-Wall Bracing | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | PART |
Jim Sly
|
|
|
shear // Garrett Phone #: ###-#### Exterior sherar nailing......OK.
|
BLD-Other | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/23/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Tony Young
|
|
|
Rebar - Please call ahead // TJ Phone #: ###-####
|
BLD-Footing | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PART |
Tony Young
|
|
|
Rebar - Please call ahead // TJ Phone #: ###-####,, footings, work in progress,, ok
|
BLD-Footing | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | PEND |
Tony Young
|
|
|
Rebar - Please call ahead // TJ Phone #: ###-####,, needs soils approval 1st
|
PubWorks Subgrade Approval | 7/23/2018 | 7/23/2018 | 7/23/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | NR |
Tony Young
|
|
|
Rebar - Please call ahead // TJ Phone #: ###-####,, work in progress,, BUT.. needs soils approval 1st
|
BLD-Concrete | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | NR |
Tony Young
|
|
|
Rebar - Please call ahead // TJ Phone #: ###-####,, needs soils report
|
Place hold on job | 6/25/2018 | | 7/19/2018 | | DONE |
Keeley Wilson
|
|
|
Need GC Form from Flynner Homes. see email 6-25-18 blh
|
(F) Reprint permit | | | 6/26/2018 | | DONE |
|
|
|
|
Meeting | | | 6/25/2018 | | DONE |
|
|
|
someone came in to pay fee but he is not with the GC taking over so gave him the GC form and told him to have Flynner Prop. fill it out and they can send it to me through email and we'll sent them the revised permit to sign
|
Routing - PLUMBING | 12/6/2017 | | 12/18/2017 | | PASS |
Bill VanDegrift
|
|
|
Bill - please contact Caroline ###-####, Applicant stated she paid for the composting toilet permit already. MDH
letter from the health department is in documents.
|
Issue PAID IN FULL permit | | | 12/12/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/8/2017 | | |
|
|
|
|
Telephone call | | | 12/8/2017 | | DONE |
|
|
|
Left a message for Bob informing him that this permit is ready to be picked up and the fee amount due
|
Telephone call | | | 12/8/2017 | | DONE |
|
|
|
customer will request an extension with Adele
|
Extend Review Timeline | | | 12/8/2017 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
Routing - PLAN CHECK | 10/10/2017 | | 12/8/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/8/2017 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2017 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 12/8/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/7/2017 | | DONE |
|
|
|
received 2 sets of subsurface sewate disposal paperwork-took to Michael H
|
Routing - PUBLIC WORKS | 12/6/2017 | | 12/6/2017 | | PASS |
Rachael Beierle
|
|
|
GREENHOUSE ONLY COMPOST TOILET/SHOWER. NEEDS APPROVED PER PLM FROM CDHD. NOT ATTCHED TO CITY SEWER.
|
Routing - PLUMBING | 10/10/2017 | | 10/11/2017 | | FAIL |
Bill VanDegrift
|
|
|
provide an approval letter from the health Department addressing the composting toilet and the waste from the exterior shower and dry sink.
|
Plan Reviewer's activity | | | 10/10/2017 | | DONE |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 9/29/2017 | | 10/10/2017 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 8/18/2017 | | 10/10/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | | 8/16/2017 | 9/29/2017 | | DEFR |
Brian McGowan
|
|
|
9/04 sfd Level 2 paper
|
Routing - PLANNING | | | 8/30/2017 | | PASS |
David Moser
|
|
|
CFH17-00033, approved has per the resubmitted bldg elevations
|
Plan resubmittals received | | | 8/22/2017 | | DONE |
|
|
|
Three sheets of A-2.1 taken to Brian Mc
|
1st review completed | | | 8/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - Erosion and Sediment | 8/18/2017 | | 8/18/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Vald stormwater team designated.
|
Routing PW Grading-Hillside | 8/16/2017 | | 8/18/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLANNING | 8/18/2017 | | 8/18/2017 | | FAIL |
David Moser
|
|
|
Fail;The building can not exceed 14 feet in height becuase it is using the reduced setbacks for accessory sturctures. The building is 16 feet in height. During the Hillside Application the Glancey Rockwell and Associates revised the elevations to meet this height requirement. Please submit the revised elevations with the building permit.
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2017 | | DONE |
|
|
|
|
Intake Approval | | | 8/16/2017 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 8/16/2017 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/16/2017 | | DONE |
|
|
|
|
Meeting | | | 5/2/2017 | | DONE |
|
|
|
Jason T come over to talk to custokmer-he needs the letter from P & Z so gave him back his plans and sent him over to P & Z
|
Application received | | 5/2/2017 | | | |
|
|
|
|