BLD-Final | 8/14/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Brandon Shaw
|
|
|
Call 20 mins before // Randy Phone #: ###-####
|
DOC - Permit Finaled | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 6/13/2017 | 6/14/2017 | 6/14/2017 | A | PASS |
Brandon Shaw
|
|
|
Randy-deck-please call 30 minutes prior to meet Phone #: ###-####
|
PubWorks Subgrade Approval | 6/14/2017 | 6/14/2017 | 6/14/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | NR |
Brandon Shaw
|
|
|
Bryan Phone #: ###-#### Need Geotech report
|
Issue PAID IN FULL permit | | | 5/15/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/5/2017 | | |
|
|
|
|
Telephone call | | | 5/5/2017 | | DONE |
|
|
|
Left a message for Randy informing him this permit is ready, fee amount due and that we'll need to know who the RP will be
|
Permit Ready to Issue | | | 5/5/2017 | | DONE |
|
|
|
Need RP
|
Routing Walk-In (BLD) | 5/3/2017 | 5/3/2017 | 5/4/2017 | P | DONE |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 5/3/2017 | | 5/4/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Homeowner RP.
|
Routing PW Grading-Hillside | 5/3/2017 | | 5/4/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
1st review completed | | | 5/4/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/4/2017 | | 5/4/2017 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/4/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/4/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
Jeff Lowe
|
|
|
|
Application received | | 5/3/2017 | | | |
|
|
|
|