BLD-Energy code compliance | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
Dave Hannah
|
|
|
John Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Other | 6/9/2017 | 6/9/2017 | 6/9/2017 | P | PASS |
Tony Young
|
|
|
Complaint that ridgeline has been raised at dormer in rear of structure that is not approved by zoning. Contact Sarah Shafer with zoning after review @###-#### ,, roof height scales out per plan,, no issues,, (it looks like it may be higher due to he cut back some roofing due to damage and to get a full sheet of plywood at the ridge)
|
Routing Walk-In (BLD) | 5/25/2017 | 5/25/2017 | 5/25/2017 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/25/2017 | | 5/25/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/25/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/25/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | PASS |
Celine Acord
|
|
|
|
Routing Walk-In (BLD) | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 5/5/2017 | 5/5/2017 | 5/15/2017 | P | DONE |
Brittany Hill
|
|
|
|
1st review completed | | | 5/15/2017 | | FAIL |
Josh Bogle
|
|
|
Need engineering and spray foam ESR report **JAB**
|
Routing - PLAN CHECK | 5/15/2017 | | 5/15/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 5/5/2017 | | | |
|
|
|
|