(BLACKROCK COFFEE – TENANT IMPROVEMENT) (DRH16-00500) (CUP16-00075) This building does not have a fire sprinkler system. The building shell was constructed under permit BLD17-00193. To prepare an existing 576 square foot building to be occupied as a coffee shop with two drive through windows and with interior seating for the public. Work is to include interior nonbearing walls, a toilet room accessible to the disabled, kitchen equipment, an interior door, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/21/20181/18/2018 DONE
This permit finaled on the web by derek cooper
First Notice 12/23/20171/11/2018 DONE
Mailed 1-12-18
Permanent Occupancy  12/28/2017 DONE
Permanent Occupancy  12/28/2017 DONE
Permanent Occupancy  12/13/2017 DONE
BLD-Final12/12/201712/12/201712/12/2017PPASS
DetailsMike Jordan
Bruce-call 30 minutes prior to meet Phone #: ###-####. OK for perm occ.
BLD-Aging Inspection12/11/201712/11/201712/12/2017 PASS
DetailsMike Jordan
PubWorks Occupancy Approval9/15/20179/15/20179/15/2017 DONE
DetailsMike Sheppard
FIRE-Final Inspection9/13/20179/14/20179/14/2017APASS
DetailsTroy Cobbley
life safety passed
Temporary Occupancy9/14/201712/13/20179/14/2017 DONE
DetailsBrittany Hill
BLD-Final9/13/20179/14/20179/14/2017PPART
DetailsJim Sly
Bruce-this permit does not show any inspections other than the bld & fire final Phone #: ###-####
Zoning Approval9/14/20179/14/20179/14/2017 PASS
DetailsSarah Schafer
FIRE-Final Inspection9/12/20179/13/20179/13/2017PCANC
DetailsJim Page
Inspection not ready, point of contact Bruce Phone #: ###-#### will reschedule inspection request for a later date. This inspection request is cancelled.
Issue PAID IN FULL permit  9/8/2017 DONE
Print Occupancy Form  9/8/2017 DONE
Plan assigned to (CJW)5/12/20175/12/20176/23/2017 PASS
DetailsCarl Westfall
(6a) (June 1 - 15 days) (19 sheets) Blackrock Coffee
1st review completed  6/23/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/23/2017 DONE
Permit Ready to Issue  6/23/2017 DONE
need GC & Rev Cert of Val
Routing - PLAN CHECK5/12/2017 6/23/2017 PASS
DetailsCarl Westfall
IBC review completed and approved
Routing - Design Review5/12/2017 5/16/2017 PASS
DetailsSarah Schafer
Routing Off Site - C.D.H5/12/2017 5/16/2017 PASS
DetailsCarl Westfall
Kathy Cheney
Routing - FIRE5/12/20175/12/20175/15/2017 PASS
DetailsKatie Marron
Shell permit completed under BLD17-00193. No comments required. Basic Life Safety
Routing - Erosion and Sediment5/12/2017 5/15/2017 PASS
DetailsMelissa Jannusch
No ESC permit required
Routing - MECHANICAL5/12/2017 5/12/2017 PASS
DetailsTroy James
Routing - PLUMBING5/12/2017 5/12/2017 PASS
DetailsDaryl Spivey
May require additional backflow protection on installed equipment.
Routing - Addressing5/12/2017 5/12/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/12/2017 5/12/2017 PASS
DetailsRachael Beierle
WEST BOISE SEWER
Intake Approval  5/12/2017 PASS
DetailsAdele J Schaffeld-Griffin
Julie approved per screen, Javier notified applicant major TI
Intake Approval  5/9/2017 FAIL
DetailsJulie Romig
Need architectural plans stamped and signed.
Plan Reviewer's activity  5/8/2017  
Submitted as 518 but should be routed as a 520 due to first time tenant build out of new shell. Architect as been notified via email. JAR.
Application received  5/5/2017 DONE
Application submitted via PDS Online on May 5 2017 4:23PM