BLD-Aging Inspection | 12/22/2017 | 12/22/2017 | 12/29/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 10/11/2017 | 10/12/2017 | 10/13/2017 | A | CANC |
Dave Hannah
|
|
|
Shane Phone #: ###-#### stell needs zoning final
|
BLD-Final | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | PEND |
Tony Young
|
|
|
Shane Phone #: ###-####,, ok pending historical
|
BLD-Framing/Rough-in | 8/9/2017 | 8/10/2017 | 8/10/2017 | A | PASS |
Tony Young
|
|
|
Shane Phone #: ###-####
|
BLD-Framing/Rough-in | 8/1/2017 | 8/1/2017 | 8/1/2017 | P | PEND |
Dave Hannah
|
|
|
Shane Phone #: ###-#### ok to insulate after elec rough in is signed off
|
BLD-Wall Bracing | 7/13/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Tony Young
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PART |
Tony Young
|
|
|
Shawn Phone #: ###-####,, exterior shear/bracing nailing ok
|
BLD-Framing/Rough-in | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | NR |
Dave Hannah
|
|
|
Shane Phone #: ###-####
|
BLD-Foundation | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PART |
Tony Young
|
|
|
john Phone #: ###-####,, wall ok,, work in progress,, ok to pour when ready
|
BLD-Footing | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | PASS |
Tony Young
|
|
|
late afternoon // John Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/12/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/6/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 5/8/2017 | 5/8/2017 | 6/6/2017 | | DONE |
Brian McGowan
|
|
|
1st Review Complete - Failed Planning. Side setback needs to be verified. Dimensions must match from sheet to sheet. For the SECOND TIME
|
Routing - PLAN CHECK | 6/6/2017 | | 6/6/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2017 | | DONE |
Brian McGowan
|
|
|
ESC - Yes Energy - No
|
Permit Ready to Issue | | | 6/6/2017 | | DONE |
|
|
|
***met 6-12-17 CAN***need GC and RP -RCE # on permit app doesn't match with the name Studio Space Design LLC
|
Routing - PLANNING | 6/1/2017 | | 6/1/2017 | | PASS |
Katelyn Menuge
|
|
|
Per DRH17-00181
|
Routing - PLANNING | 5/30/2017 | | 5/30/2017 | | FAIL |
Katelyn Menuge
|
|
|
Same Correction Needed. Show exact side setback dimension.
|
1st review completed | | | 5/23/2017 | | FAIL |
Brian McGowan
|
|
|
Size of Garage and side setback must be verified.
|
Routing - PLAN CHECK | 5/23/2017 | | 5/23/2017 | | FAIL |
Brian McGowan
|
|
|
Size of Garage and side setback must be verified.
|
Routing - PLANNING | 5/8/2017 | | 5/22/2017 | | FAIL |
Katelyn Menuge
|
|
|
Drawing Updates and Waiting on Idaho Power Approval Letter
|
Application received | | | 5/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 8 2017 9:38AM
|
Intake Approval | | | 5/8/2017 | | PASS |
|
|
|
|