Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-01372
StatusIssued
Name MEIER MARK
Site Address 4601 N GINZEL ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for a 2nd story deck extension (+/- 200sq") & cover addition (260sq') in Foothills and WUI conditions. All work per plans, notes, engineering, local code & ordinances. Separate electrical, HVAC, and ESC permits required. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/23/20181/23/20181/24/2018 PEND
DetailsTony Young
BLD-Framing/Rough-in9/8/20179/11/20179/11/2017APASS
DetailsDave Hannah
Todd-contractor Phone #: ###-####
BLD-Framing/Rough-in8/21/20178/22/20178/22/2017APASS
DetailsTony Young
Todd Phone #: ###-####,, frame and soffit ok to cover
BLD-Other8/21/20178/21/20178/21/2017PNR
DetailsBrandon Shaw
Soffit, pre plans pg A 5.0, detail 7- One hour can assambly required.
BLD-Wall cover8/18/20178/21/20178/21/2017ANR
DetailsBrandon Shaw
Need Electrical rough in, verify can assm .are fire rated
BLD-Framing/Rough-in8/10/20178/10/20178/10/2017PPART
DetailsTony Young
Todd Phone #: ###-####,, mainly a frame/WUI conference,, work in progress
BLD-Foundation7/13/20177/14/20177/14/2017PPART
DetailsTony Young
Rebar // Doug Phone #: ###-####,, ok pending special inspection reports
BLD-Footing7/7/20177/7/20177/7/2017PDONE
DetailsTony Young
Todd Phone #: ###-####,, 301 looked at it,, soils has been approved
BLD-Foundation7/5/20177/6/20177/6/2017PFAIL
DetailsJim Storey
Rebar... late afternoon // Todd Phone #: ###-#### need pw sign off/ si for 3500 psi testing.
PubWorks Subgrade Approval7/6/20177/6/20177/6/2017 DONE
DetailsJason C. Taylor
***GEOTECH APPROVED SUBGRADE UP TO 1750 PSI...MAKE SURE STRUCTURAL ENGINEERING IS STILL APPLICABLE***JCT**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  5/15/2017 DONE
OVERRIDE  5/12/2017  
Plan assigned to (JAB) Josh5/11/20175/11/20175/12/2017 PASS
DetailsJosh Bogle
waiting on fully completed 310 form - JAB 5-11-17
1st review completed  5/12/2017 DONE
DetailsJosh Bogle
Routing - PLAN CHECK5/12/2017 5/12/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  5/12/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  5/12/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/12/2017 DONE
DetailsJosh Bogle
Permit Ready to Issue  5/12/2017 DONE
Need GC Form and Letter from homeowner
Telephone call  5/12/2017 DONE
Spoke with Marco informing him that this permit is ready, fee amount due, the owners would beed to fill out the 302 form and would need to give him a letter stating they are allowing him to pull/pick up the permit
Routing Walk-In (BLD)5/8/20175/8/20175/10/2017ADONE
DetailsAndy J. Long
Routing - Erosion and Sediment5/8/2017 5/10/2017 PASS
DetailsAndy J. Long
General permit issued. No ESC plan required due to scope of project. Homeowner RP, contractor former RP certified (currently expired)
PLANS/APPL TAKEN TO FRONT DESK  5/10/2017 DONE
Plan assigned to (JB_) Josh5/8/20175/8/20175/8/2017 
DetailsJosh Bogle
Routing Walk-In (Zoning)5/8/20175/8/20175/8/2017ADONE
DetailsSue Cummings
Routing PW Grading-Hillside5/8/2017 5/8/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Application received 5/8/2017