BLD-Aging Inspection | 1/23/2018 | 1/23/2018 | 1/24/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | PASS |
Dave Hannah
|
|
|
Todd-contractor Phone #: ###-####
|
BLD-Framing/Rough-in | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####,, frame and soffit ok to cover
|
BLD-Other | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | NR |
Brandon Shaw
|
|
|
Soffit, pre plans pg A 5.0, detail 7- One hour can assambly required.
|
BLD-Wall cover | 8/18/2017 | 8/21/2017 | 8/21/2017 | A | NR |
Brandon Shaw
|
|
|
Need Electrical rough in, verify can assm .are fire rated
|
BLD-Framing/Rough-in | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | PART |
Tony Young
|
|
|
Todd Phone #: ###-####,, mainly a frame/WUI conference,, work in progress
|
BLD-Foundation | 7/13/2017 | 7/14/2017 | 7/14/2017 | P | PART |
Tony Young
|
|
|
Rebar // Doug Phone #: ###-####,, ok pending special inspection reports
|
BLD-Footing | 7/7/2017 | 7/7/2017 | 7/7/2017 | P | DONE |
Tony Young
|
|
|
Todd Phone #: ###-####,, 301 looked at it,, soils has been approved
|
BLD-Foundation | 7/5/2017 | 7/6/2017 | 7/6/2017 | P | FAIL |
Jim Storey
|
|
|
Rebar... late afternoon // Todd Phone #: ###-#### need pw sign off/ si for 3500 psi testing.
|
PubWorks Subgrade Approval | 7/6/2017 | 7/6/2017 | 7/6/2017 | | DONE |
Jason C. Taylor
|
|
|
***GEOTECH APPROVED SUBGRADE UP TO 1750 PSI...MAKE SURE STRUCTURAL ENGINEERING IS STILL APPLICABLE***JCT**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 5/15/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/12/2017 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/11/2017 | 5/11/2017 | 5/12/2017 | | PASS |
Josh Bogle
|
|
|
waiting on fully completed 310 form - JAB 5-11-17
|
1st review completed | | | 5/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/12/2017 | | 5/12/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/12/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/12/2017 | | DONE |
|
|
|
Need GC Form and Letter from homeowner
|
Telephone call | | | 5/12/2017 | | DONE |
|
|
|
Spoke with Marco informing him that this permit is ready, fee amount due, the owners would beed to fill out the 302 form and would need to give him a letter stating they are allowing him to pull/pick up the permit
|
Routing Walk-In (BLD) | 5/8/2017 | 5/8/2017 | 5/10/2017 | A | DONE |
Andy J. Long
|
|
|
|
Routing - Erosion and Sediment | 5/8/2017 | | 5/10/2017 | | PASS |
Andy J. Long
|
|
|
General permit issued. No ESC plan required due to scope of project. Homeowner RP, contractor former RP certified (currently expired)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2017 | | DONE |
|
|
|
|
Plan assigned to (JB_) Josh | 5/8/2017 | 5/8/2017 | 5/8/2017 | | |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 5/8/2017 | 5/8/2017 | 5/8/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing PW Grading-Hillside | 5/8/2017 | | 5/8/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Application received | | 5/8/2017 | | | |
|
|
|
|