Second Notice | | 11/24/2017 | 1/11/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
First Notice | | 11/13/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
Print Occupancy Form | | | 11/3/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/3/2017 | | DONE |
|
|
|
|
BLD-Final | 10/3/2017 | 10/3/2017 | 10/4/2017 | P | PASS |
Dave Hannah
|
|
|
ok for perm occ
|
BLD-Aging Inspection | 9/26/2017 | 9/26/2017 | 10/3/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 7/27/2017 | 7/28/2017 | 7/31/2017 | P | PART |
Dave Hannah
|
|
|
Evan Phone #: ###-#### ok for temp need spec insdpection report
|
Temporary Occupancy | 7/31/2017 | 10/29/2017 | 7/31/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Print Occupancy Form | | | 7/31/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarm modifications, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection passed/complete.
|
Place hold on job | 7/11/2017 | | 7/11/2017 | | DONE |
Tisha Gallop
|
|
|
need signed copy of permit back from teneant Evan Hobbs
|
Issue PAID IN FULL permit | | | 7/10/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/10/2017 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 5/19/2017 | 5/19/2017 | 6/29/2017 | | DONE |
Julie Romig
|
|
|
1st Review Comp - Resubmitted 06/29 - L3 Dash Aerial Yoga.
|
Routing - PLAN CHECK | 6/29/2017 | | 6/29/2017 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/29/2017 | | DONE |
Christina Prado
|
|
|
Need ACHD(received email/7/3/17 leg), GC Form & Revised certificate of value for issuance
|
Route to Impact Fee Review | 6/24/2017 | 6/27/2017 | 6/27/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 6/24/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 5/19/2017 | | 6/24/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - Addressing | 5/19/2017 | | 5/22/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - FIRE | 5/19/2017 | 5/19/2017 | 5/19/2017 | | PASS |
Scott Arellano
|
|
|
Basic Life Safety. No comments attached
|
Routing - PUBLIC WORKS | 5/19/2017 | | 5/19/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 5/19/2017 | | 5/19/2017 | | PASS |
Cody Riddle
|
|
|
|
Intake Approval | | | 5/19/2017 | | PASS |
|
|
|
|
Intake Approval | | | 5/17/2017 | | FAIL |
|
|
|
Need:
1. Completed Form 304 Registered Design Professional.
2. Upload drawings as individual drawing sheets with sheet number and name per City of Boise naming conventions.
3. Plans indicate new track lights. If replacing more than 50% of the interior lighting, provide Lighting COMcheck and Lighting plan with lighting fixture schedule. If less than 50% of lighting is to be replaced, provide information showing that new lighting does not increase the installed interior lighting power.
4. Provide information for Accessibility compliance at point of sale counter.
|
Intake Approval | | | 5/17/2017 | | FAIL |
|
|
|
Need:
1. Form 304 Registered Design Professional must be completed with owner information and signature. Architect listed on Form 304 must match architect signing drawings.
2. Provide accessible information on plans for service counter as required by checklist. Drawing sheets have been moved from the "Documents" folder to the "Drawings" folder.
|
Application received | | | 5/11/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 11 2017 7:49PM
|