Permit Information
Permit NumberBLD17-01463
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 5098 S TABOO PL
Project Name32-7 EV3
Customer Number 
ePlanReviewYes
Description
HILLSIDE, FLOODPLAIN, WUI ZONE "A", CLASS "A" ROOF REQUIRED. Permit for the construction of a new 2469 sq. ft., two story (first story 1133 sq. ft., second story 1336 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 116 sq. ft. of covered patio/porch and a 603 sq. ft. attached garage per the approved plans. R-1C/DA zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/17/20181/18/20181/18/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled1/18/20181/18/20181/18/2018PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval12/28/201712/28/201712/28/2017 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance11/9/201711/9/201711/9/2017PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in11/6/201711/8/201711/8/2017APART
DetailsBrandon Shaw
See correction notice

OK to insulate
BLD-Other10/18/201710/19/201710/19/2017APASS
DetailsJim Storey
Sofit // Luna Phone #: ###-####
BLD-Wall Bracing10/18/201710/19/201710/19/2017APASS
DetailsJim Storey
Shear // Luna Phone #: ###-####
BLD-Foundation7/10/20177/11/20177/11/2017APASS
DetailsBrandon Shaw
Phone #: 9495359 >> Inspection requested via mobile web by Ricardo
BLD-Footing7/9/20177/10/20177/10/2017APASS
DetailsBrandon Shaw
Phone #: 9495359 >> Inspection requested via mobile web by Ricardo
PubWorks Subgrade Approval7/7/20177/7/20177/7/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  6/21/2017 DONE
Inspection Record Card- Bld  6/21/2017 DONE
OVERRIDE  6/20/2017  
Plan assigned to (BJM)5/17/20175/17/20176/20/2017 DONE
DetailsBrian McGowan
1st review complete -need TOW and TOF for stepped foundation sfd 6-02 Level 2 ePlan
PLANS/APPL TAKEN TO FRONT DESK  6/20/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  6/20/2017 DONE
All Met
Routing PW Flood Plain6/14/2017 6/19/2017 PASS
DetailsJason C. Taylor
Approved LOMR on File. No floodplain review required. JCT
Routing - PLAN CHECK5/17/2017 6/16/2017 PASS
DetailsBrian McGowan
1st review completed  6/15/2017 DONE
DetailsBrian McGowan
Routing PW Grading-Hillside5/17/2017 6/2/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Route to Impact Fee Review5/17/20175/20/20175/18/2017 PASS
DetailsMarissa Taylor
Initial residential review of new SFD permits requested for now.
Routing - FIRE5/17/20175/17/20175/17/2017 PASS
DetailsKatie Marron
Plans were reviewed for fd access with shared driveway, hydrant availability and defensible space. The lot abutes lot 28 which is owned by the HOA and stated to be maintained on the final plat.
Plans ACCEPTED BY PLAN TECH  5/17/2017 DONE
Intake Approval  5/17/2017 PASS
Recd Pcfee & Taken To Pln CK  5/17/2017 DONE
Routing - MECHANICAL5/17/2017 5/17/2017 PASS
DetailsTroy James
Routing - PLANNING5/17/2017 5/17/2017 PASS
DetailsSue Cummings
Routing - Addressing5/17/2017 5/17/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/17/2017 5/17/2017 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment5/17/2017 5/17/2017 PASS
DetailsMelissa Jannusch
ESC special East Valley waiver approved.
Application received  5/12/2017 DONE
Application submitted via PDS Online on May 12 2017 8:53AM