BLD-Final | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 12/28/2017 | 12/28/2017 | 12/28/2017 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 11/6/2017 | 11/8/2017 | 11/8/2017 | A | PART |
Brandon Shaw
|
|
|
See correction notice
OK to insulate
|
BLD-Other | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Jim Storey
|
|
|
Sofit // Luna Phone #: ###-####
|
BLD-Wall Bracing | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Jim Storey
|
|
|
Shear // Luna Phone #: ###-####
|
BLD-Foundation | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: 9495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 7/9/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: 9495359 >> Inspection requested via mobile web by Ricardo
|
PubWorks Subgrade Approval | 7/7/2017 | 7/7/2017 | 7/7/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 6/21/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/20/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 5/17/2017 | 5/17/2017 | 6/20/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete -need TOW and TOF for stepped foundation sfd 6-02 Level 2 ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/20/2017 | | DONE |
|
|
|
All Met
|
Routing PW Flood Plain | 6/14/2017 | | 6/19/2017 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. JCT
|
Routing - PLAN CHECK | 5/17/2017 | | 6/16/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 6/15/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 5/17/2017 | | 6/2/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Route to Impact Fee Review | 5/17/2017 | 5/20/2017 | 5/18/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 5/17/2017 | 5/17/2017 | 5/17/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for fd access with shared driveway, hydrant availability and defensible space. The lot abutes lot 28 which is owned by the HOA and stated to be maintained on the final plat.
|
Plans ACCEPTED BY PLAN TECH | | | 5/17/2017 | | DONE |
|
|
|
|
Intake Approval | | | 5/17/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/17/2017 | | DONE |
|
|
|
|
Routing - MECHANICAL | 5/17/2017 | | 5/17/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/17/2017 | | 5/17/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 5/17/2017 | | 5/17/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/17/2017 | | 5/17/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 5/17/2017 | | 5/17/2017 | | PASS |
Melissa Jannusch
|
|
|
ESC special East Valley waiver approved.
|
Application received | | | 5/12/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 12 2017 8:53AM
|