BLD-Final | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.0
|
PubWorks Occupancy Approval | 5/25/2018 | 5/25/2018 | 5/25/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Energy code compliance | 2/10/2018 | 2/13/2018 | 2/13/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 2/7/2018 | 2/9/2018 | 2/9/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Other | 1/24/2018 | 1/24/2018 | 1/24/2018 | P | PASS |
Brandon Shaw
|
|
|
Luna-fire rating in soffits Phone #: ###-####
|
BLD-Wall Bracing | 1/24/2018 | 1/24/2018 | 1/24/2018 | P | PASS |
Brandon Shaw
|
|
|
Luna Phone #: ###-####
|
BLD-Footing | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Brandon Shaw
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 8/3/2017 | 8/3/2017 | 8/3/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 6/21/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/20/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 5/17/2017 | 5/17/2017 | 6/20/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete -need TOW and TOF for stepped foundation sfd 6-02 Level 2 ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/20/2017 | | DONE |
|
|
|
All Met
|
Routing PW Flood Plain | 6/14/2017 | | 6/19/2017 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. JCT
|
1st review completed | | | 6/16/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/17/2017 | | 6/16/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 5/17/2017 | | 6/2/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Route to Impact Fee Review | 5/17/2017 | 5/20/2017 | 5/18/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 5/17/2017 | | 5/18/2017 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 5/17/2017 | 5/17/2017 | 5/17/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for fd access with shared 20' driveway, hydrant availability and defensible space. The lot to the north is owned by the HOA and stated to be maintained on the final plat.
|
Plans ACCEPTED BY PLAN TECH | | | 5/17/2017 | | DONE |
|
|
|
|
Intake Approval | | | 5/17/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/17/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 5/17/2017 | | 5/17/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 5/17/2017 | | 5/17/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/17/2017 | | 5/17/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 5/17/2017 | | 5/17/2017 | | PASS |
Melissa Jannusch
|
|
|
ESC special East Valley waiver approved.
|
Application received | | | 5/12/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 12 2017 8:56AM
|