BLD-Final | 2/20/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
Jim Sly
|
|
|
Ben Phone #: ###-####
|
DOC - Permit Finaled | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/26/2018 | 1/29/2018 | 1/29/2018 | A | NR |
Jim Sly
|
|
|
Ben Phone #: ###-#### Need Plumbing Final.
|
BLD-Energy code compliance | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
BLD-Energy code compliance | 8/15/2017 | 8/16/2017 | 8/17/2017 | P | NR |
Jim Sly
|
|
|
Insulation // Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Jim Sly
|
|
|
Scott Phone #: ###-####
|
BLD-Energy code compliance | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PART |
Jim Sly
|
|
|
Scott Phone #: ###-#### Foam Seal Ok.
|
BLD-Framing/Rough-in | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PART |
Jim Sly
|
|
|
Please call 30 ahead- Scott Phone #: ###-#### Under floor.......OK.
|
BLD-Other | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | NR |
Jim Storey
|
|
|
partial structural // Scott Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/23/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/22/2017 | | DONE |
|
|
|
met
|
Telephone call | | | 5/22/2017 | | DONE |
|
|
|
called Scott of let permit is ready and how much is owed
|
Plan assigned to (JAB) Josh | 5/16/2017 | 5/16/2017 | 5/19/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 5/15/2017 | 5/15/2017 | 5/19/2017 | P | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 5/19/2017 | | FAIL |
Josh Bogle
|
|
|
plan looks good, fully engineered, everything lining up, except there is a ceiling height issue in the main floor hallway. Applicant has been informed by phone & e-mail. **JAB**
|
Plan resubmittals received | | | 5/19/2017 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked A2.0, A4.0 & A4.1; Plans taken to JAB for review
|
1st review completed | | | 5/19/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/19/2017 | | 5/19/2017 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/19/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/19/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2017 | | DONE |
Josh Bogle
|
|
|
Needs 2nd copy of engineering for us to keep on file **JAB**
|
Routing Walk-In (Zoning) | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (Zoning) | 5/12/2017 | 5/12/2017 | 5/15/2017 | A | DONE |
Brittany Hill
|
|
|
|
Application received | | 5/12/2017 | | | |
|
|
|
|