BLD-Final | 6/15/2017 | 6/16/2017 | 6/16/2017 | A | PASS |
Brandon Shaw
|
|
|
Alex Phone #: ###-####
|
DOC - Permit Finaled | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 6/13/2017 | 6/14/2017 | 6/14/2017 | P | PASS |
Jim Sly
|
|
|
This footing inspection can be done early in the PM. Alex will be the installer on this job and his cell is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Issue PAID IN FULL permit | | | 5/16/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 5/12/2017 | 5/12/2017 | 5/15/2017 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 5/12/2017 | 5/12/2017 | 5/15/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 5/15/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/15/2017 | | 5/15/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/15/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2017 | | |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/15/2017 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2017 | | DONE |
|
|
|
Left a message for Rich informing him that this permit is ready to be picked up
|
Routing Walk-In (Zoning) | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | DONE |
Sue Cummings
|
|
|
|
Application received | | 5/12/2017 | | | |
|
|
|
|